Development in Wanneroo

WA

Building approvals, live development applications and major projects across the Wanneroo statistical area — covering Wanneroo and Swan.

SA3 50503 Greater Perth 247,878 residents 16 statistical areas
Approved · FY25 4,017 dwellings approved
vs 5-yr average 2,714 average approvals a year
In the queue 13 live applications
Major projects 96 62 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 50503 How we calculate this

The Pipeline Development Pipeline in Wanneroo

1 Proposed 13 applications in assessment Leading · to July 2026 See applications ↓
2 Approved 4,017 dwellings approved in 2024-25, or 1.54 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 96 major projects committed or under construction, 62 of them already on site Forward · completions to 2030+ See projects ↓
4 Delivered 10,107 new addresses verified since the 2021 Census, up 11.8% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 4,017 dwelling approvals across Wanneroo. Right now, 13 development applications are before the 2 councils covering the area. AreaSearch tracks 96 major projects here that are committed or under construction, the largest being Perth Northern Corridor Housing Program at an estimated $18.0bn. On the ground, 10,107 new addresses have been verified since the 2021 Census — growth of 11.8% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Wanneroo

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 1.54 per 100 existing dwellings a year, well above the Western Australia rate of 0.80. Development here remains overwhelmingly detached: houses account for 95% of recent approvals. The mix being approved closely matches what is already standing — 95% houses against 92% of existing homes. The average approved dwelling is valued at $370,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 2,714.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Wanneroo 1.54
Western Australia 0.80
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 92%
Approved, last 5 years 95%
Approved, latest year 95%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$1.69bn
Residential work approved
2024-25
$169m
Commercial work approved
construction cost
$370,000
Average value per approved dwelling
last two years
65
Residents per approval

Supply & Demand Is Wanneroo Building Enough Homes?

The same approvals, measured against the population they have to house.

Wanneroo approves about 10.9 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 39,372 residents and 10,107 new addresses, roughly one new home per 3.9 extra residents — broadly in step with an average household of 2.9. Housing the population projected for 2041 implies roughly 1,014 new dwellings a year from here, which puts the recent approval rate of 2,714 a year comfortably ahead of what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 3.9
Average household size 2.9

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 2,714
Implied need to 2041 1,014

Implied need assumes the average household stays at today’s 2.9 people. Approvals are not completions, and not every approval is built.

ProposedLEADING · to July 2026 Development Applications in Wanneroo

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged. 93 of them carry an AreaSearch analyst assessment — look for the Analysed marker in the search below.

AreaSearch tracks 834 development applications of material scale lodged with councils across Wanneroo, the most recent in July 2026. The biggest categories in the queue by value are aged care, commercial and industrial.

Estimated value of applications by development type. This is the clearest single picture of what kind of place Wanneroo is being asked to become.

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

Approved 773
Approved 39
Pending 13
Advertised 5
Deferred 1
Determined 1

By local government area

Applications on record within each council area that overlaps Wanneroo. This counts applications inside this statistical area only — it is not a total for the council.

Wanneroo 834

Recent applications in Wanneroo

By estimated cost of works, as lodged. Estimates are the applicant’s own figures and are not verified by AreaSearch.

Bulky Goods Showroom with Incidental Service Station Alkimos - Eglinton · PENDING · lodged Jan 2026
$80.0m
Multiple dwelling residential development Mindarie - Quinns Rocks - Jindalee · PENDING · lodged Jun 2026
$60.0m
Multiple dwelling residential development Mindarie - Quinns Rocks - Jindalee · PENDING · lodged Jun 2026
$60.0m
Warehouse, Service Station and Motor Vehicle Repair Madeley - Darch · PENDING · lodged Apr 2026
$20.0m
Warehouse, Service Station and Motor Vehicle Repair Hocking - Pearsall · PENDING · lodged Apr 2026
$20.0m
Use and development of the site for a bulky goods showroom as well as associated access, landscaping, signage, and parking. Alkimos - Eglinton · PENDING · lodged Jun 2026
$15.0m
Use and development of the site for a bulky goods showroom as well as associated access, landscaping, signage, and parking. Alkimos - Eglinton · PENDING · lodged Jun 2026
$15.0m
Expansion to Existing Educational Establishment Mindarie - Quinns Rocks - Jindalee · PENDING · lodged Jun 2026
$15.0m

BuildingFORWARD Major Projects & Infrastructure in Wanneroo

What is funded and moving — the projects large enough to change how Wanneroo works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 96 current projects across Wanneroo. The largest is Perth Northern Corridor Housing Program at an estimated $18.0bn. That breaks down as 62 under construction, 12 approved and awaiting a start and 22 still in planning. The pipeline is weighted toward residential development, communities, precincts & urban renewal and retail.
Alkimos Seawater Desalination Plant
Under construction $2.80bn by 2028

Alkimos Seawater Desalination Plant

Stage 1 of Western Australias third large-scale desalination facility, delivering 50 billion litres of climate-resilient drinking water annually, with future capacity to expand to 100 billion litres. The plant…

Alkimos - Eglinton

Alkimos Beach
Under construction $800m by 2028

Alkimos Beach

A 224-hectare sustainable coastal development designed for 6,000 residents. It is Australia's first 6 Star Green Star certified community and features a 6-leaf EnviroDevelopment rating. The project includes…

Alkimos - Eglinton

Amberton Beach
Under construction $800m by 2027

Amberton Beach

Amberton Beach is a coastal masterplanned community by Stockland in Eglinton comprising more than 2,500 homes. Development continues across multiple residential stages with established community facilities…

Carramar

Also in the pipeline

Catalina Estate Under construction · Communities · by 2027 · Clarkson
$1.65bn
Trinity Estate Alkimos Under construction · Residential Development · by 2028 · Alkimos - Eglinton
$500m
Catalina Estate - Master Planned Community Under construction · Communities, Precincts & Urban Renewal · by 2026 · Clarkson
$500m
Allara Estate Under construction · Residential Development · by 2029 · Alkimos - Eglinton
$500m
Shoreline Estate (Eglinton) Under construction · Residential Development · by 2028 · Carabooda - Pinjar
$450m
Alkimos to Wanneroo Desalination Pipeline Under construction · Environmental & Disaster Management · by 2027 · Clarkson
$400m
Alkimos Vista Estate Under construction · Residential Development · by 2027 · Alkimos - Eglinton
$350m
Brighton Estate Master Planned Community Under construction · Communities, Precincts & Urban Renewal · by 2028 · Butler - Merriwa - Ridgewood
$350m
Yanchep Junction Estate Under construction · Residential Development · by 2028 · Yanchep
$275m
Eden Beach Under construction · Communities, Precincts & Urban Renewal · by 2027 · Mindarie - Quinns Rocks - Jindalee
$250m
Jindee Coastal Estate Under construction · Communities, Precincts & Urban Renewal · by 2030 · Alkimos - Eglinton
$800m
Jindee Estate Under construction · Residential Development · by 2032 · Butler - Merriwa - Ridgewood
$900m

81 further projects in Wanneroo are not listed here.

Combined values on this page exclude 10 records that appear to be separate stages of a project already counted. Both are still listed above with their own values.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $21.2bn across 11 projects with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Wanneroo

Development applications around Wanneroo

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
In the local catchment
Est. Value
Where disclosed
Under Assessment
Awaiting determination
Determined
Approved or decided
Approvals pipeline Status, location, timing and project scale

Loading development applications…

Lodged Address Description Type Distance Status

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Wanneroo

Applications and major projects plotted where they are actually proposed, with the 164 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Wanneroo

Wanneroo covers 16 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Wanneroo.

Butler - Merriwa - Ridgewood area profile

No separate approvals series published
126 applications on record · 71 new addresses since 2021
Build a map

Mindarie - Quinns Rocks - Jindalee area profile

No separate approvals series published
47 applications on record · 875 new addresses since 2021
Build a map

Carramar area profile

No separate approvals series published
115 applications on record · 284 new addresses since 2021
Build a map

Landsdale area profile

No separate approvals series published
13 applications on record · 198 new addresses since 2021
Build a map

Wanneroo - Sinagra area profile

No separate approvals series published
54 applications on record · 1,084 new addresses since 2021
Build a map

Madeley - Darch area profile

No separate approvals series published
250 applications on record · 204 new addresses since 2021
Build a map

Clarkson area profile

No separate approvals series published
35 applications on record · 421 new addresses since 2021
Build a map

Alkimos - Eglinton area profile

No separate approvals series published
55 applications on record · 4,452 new addresses since 2021
Build a map

Tapping - Ashby - Sinagra area profile

No separate approvals series published
12 applications on record · 54 new addresses since 2021
Build a map

Hocking - Pearsall area profile

No separate approvals series published
47 applications on record · 66 new addresses since 2021
Build a map

Alexander Heights - Koondoola area profile

No separate approvals series published
8 applications on record · 21 new addresses since 2021
Build a map

Yanchep area profile

No separate approvals series published
41 applications on record · 1,218 new addresses since 2021
Build a map

Marangaroo area profile

No separate approvals series published
1 application on record
Build a map

Girrawheen area profile

No separate approvals series published
11 applications on record · 58 new addresses since 2021
Build a map

Two Rocks area profile

No separate approvals series published
10 applications on record · 1,093 new addresses since 2021
Build a map

Carabooda - Pinjar area profile

No separate approvals series published
6 applications on record
Build a map

Planning Authorities Councils Covering Wanneroo

Wanneroo spans 2 local government areas — Wanneroo and Swan. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of WannerooApplications on recordRegister read to
Wanneroo 100% of residents 834 July 2026
Swan 0.0% of residents Not yet collected

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Wanneroo.

Data & Method Sources & Method for Wanneroo

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Wanneroo is Statistical Area Level 3 50503 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 16 Statistical Areas Level 2. It has an estimated 247,878 residents, +18.9% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Development applications Council planning portals July 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Wanneroo — common questions

How many new dwellings were approved in Wanneroo?

The ABS recorded 4,017 dwelling approvals across Wanneroo in the 2024-25 financial year, against a five-year average of 2,714 a year.

How many development applications are lodged in Wanneroo?

AreaSearch tracks 834 development applications of material scale across Wanneroo — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 13 remain in assessment. Applications are assessed within the Wanneroo and Swan local government areas. The most recent application in our data was lodged in July 2026.

What major projects are planned for Wanneroo?

AreaSearch tracks 96 current major projects in Wanneroo, 62 of them under construction. The largest include Alkimos Seawater Desalination Plant, Alkimos Beach and Amberton Beach.

Which council covers Wanneroo?

Wanneroo is an ABS Statistical Area Level 3. It is covered by parts of 2 local government areas — Wanneroo and Swan. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Wanneroo growing faster than the rest of Western Australia?

On development approvals, Wanneroo is adding new dwellings faster than Western Australia as a whole — 1.54 approvals per 100 existing dwellings a year against the state figure of 0.80.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in July 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.