Development in Mornington Peninsula

VIC

Building approvals, live development applications and major projects across the Mornington Peninsula statistical area — covering Mornington Peninsula.

SA3 21402 Greater Melbourne 172,293 residents 10 statistical areas
Approved · FY25 782 dwellings approved
vs 5-yr average 845 average approvals a year
In the queue 2,180 applications on record
Major projects 57 14 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 21402 How we calculate this

The Pipeline Development Pipeline in Mornington Peninsula

1 Proposed 2,180 applications on record, though this council feed does not publish assessment status Latest August 2021 See applications ↓
2 Approved 782 dwellings approved in 2024-25, or 0.41 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 57 major projects committed or under construction, 14 of them already on site Forward · completions to 2030+ See projects ↓
4 Delivered 1,166 new addresses verified since the 2021 Census, up 1.2% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 782 dwelling approvals across Mornington Peninsula. AreaSearch tracks 57 major projects here that are committed or under construction, the largest being Victorian Renewable Energy Terminal (VRET) at an estimated $1.40bn. On the ground, 1,166 new addresses have been verified since the 2021 Census — growth of 1.2% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Mornington Peninsula

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.41 per 100 existing dwellings a year, below the Victoria rate of 0.80. The mix is genuinely split — 70% of recent approvals are detached houses and 30% are attached or higher-density dwellings. Detached houses make up 86% of the homes already standing here but only 68% of the past five years of approvals, so the area is densifying. The average approved dwelling is valued at $825,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 845.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Mornington Peninsula 0.41
Victoria 0.80
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 86%
Approved, last 5 years 68%
Approved, latest year 70%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$752m
Residential work approved
2024-25
$358m
Commercial work approved
construction cost
$825,000
Average value per approved dwelling
last two years
244
Residents per approval

Supply & Demand Is Mornington Peninsula Building Enough Homes?

The same approvals, measured against the population they have to house.

Mornington Peninsula approves about 4.9 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 3,345 residents and 1,166 new addresses, roughly one new home per 2.9 extra residents — broadly in step with an average household of 2.6. Housing the population projected for 2041 implies roughly 618 new dwellings a year from here, which puts the recent approval rate of 845 a year comfortably ahead of what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 2.9
Average household size 2.6

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 845
Implied need to 2041 618

Implied need assumes the average household stays at today’s 2.6 people. Approvals are not completions, and not every approval is built.

ProposedLEADING · to August 2021 Development Applications in Mornington Peninsula

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged.

AreaSearch tracks 2,180 development applications of material scale lodged with council across Mornington Peninsula, the most recent in August 2021. The biggest categories in the queue by value are aged care, retail and commercial.
Coverage

AreaSearch reads applications directly from each council’s planning register. This whole area sits within one council, and nothing has been lodged in its register since August 2021. Treat everything below as the position at that date rather than as today’s live queue.

Estimated value of applications by development type. This is the clearest single picture of what kind of place Mornington Peninsula is being asked to become. A further 12 applications sit across 1 smaller category, too few to plot.

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

By local government area

Applications on record within each council area that overlaps Mornington Peninsula. This counts applications inside this statistical area only — it is not a total for the council.

Mornington Peninsula 2,180

No current list of the largest applications can be shown for Mornington Peninsula. Nothing on record here is both still open and lodged within the last 18 months. Victoria has no state-wide planning portal and its council coverage is uneven, so what AreaSearch can collect here is a record of past activity rather than a live queue. We are currently investigating a solution. The 2,180 applications AreaSearch holds for this area, lodged between Mar 2007 and Aug 2021, are counted in the figures above.

BuildingFORWARD Major Projects & Infrastructure in Mornington Peninsula

What is funded and moving — the projects large enough to change how Mornington Peninsula works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 57 current projects across Mornington Peninsula. The largest is Victorian Renewable Energy Terminal (VRET) at an estimated $1.40bn, due by 2029. That breaks down as 14 under construction, 8 approved and awaiting a start and 35 still in planning. The pipeline is weighted toward residential development, transport & logistics and environmental & disaster management.
Martha Cove Marina Village Centre
Under construction $280m by 2028

Martha Cove Marina Village Centre

A 6.4 hectare permit-approved mixed-use marina village centre at Safety Beach on the Mornington Peninsula. The masterplan comprises 13 superlots delivering up to 315 dwellings including waterfront apartments…

Dromana

Victorian Renewable Energy Terminal (VRET)
In planning $1.40bn by 2029

Victorian Renewable Energy Terminal (VRET)

A dedicated assembly port at the Port of Hastings designed to support the import, storage, and assembly of offshore wind components for Victoria's 2GW offshore wind target. The project features a land-backed…

Hastings - Somers

Approved $100m by 2028

Yaringa Boat Harbour Expansion

Major multi-faceted coastal infrastructure and tourism development featuring a new inland marina basin with 180 wet berths, a tide control lock, 180 tourist accommodation units, 400-boat dry stack storage, and…

Somerville

Also in the pipeline

Victorian Renewable Energy Terminal (Port of Hastings) In planning · Energy · by 2030 · Hastings - Somers
$1.40bn
Neue Space Mornington Under construction · Business Parks & Technology Hubs · by 2026 · Mornington - East
$35m
HMAS Cerberus Land Divestment Strategy In planning · Communities, Precincts & Urban Renewal · by 2028 · Hastings - Somers
$150m
Rosedale Residential Development Under construction · Residential Development · by 2026 · Rosebud - McCrae
$31m
Stony Point Line Service Improvements In planning · Transport & Logistics · by 2028 · Hastings - Somers
$120m
Dromana Estate Residential Community In planning · Communities · by 2030 · Dromana
$250m
The Wheelhouse Martha Cove Under construction · Residential Development · by 2026 · Somerville
$65m
Arthurs Seat Eagle SkyTower and Alpine Coaster Project Approved · Tourism · by 2028 · Dromana
$28m
Dromana Pier Redevelopment Under construction · Ports, Marinas, Fisheries & Aquaculture · by 2026 · Dromana
$12m
Woodbyne Estate In planning · Residential Development · by 2027 · Mornington - East
$75m
Mount Eliza: Emil Madsen Reserve - East Pavilion Under construction · Sports & Recreation · by 2026 · Mount Eliza
$11m
Mornington Peninsula Housing and Settlement Strategy In planning · Communities, Precincts & Urban Renewal · by 2036 · Hastings - Somers
$320m

42 further projects in Mornington Peninsula are not listed here.

Combined values on this page exclude 1 record that appear to be separate stages of a project already counted. Both are still listed above with their own values.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $705m across 4 projects with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Mornington Peninsula

Development applications around Mornington Peninsula

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Application search is not available in Victoria. AreaSearch holds 2,180 applications for Mornington Peninsula, but they are a record of past activity rather than a current register. Victoria has no state-wide planning portal and its council coverage is uneven, so we have switched the search off here rather than return partial answers. We are currently investigating a solution. No credits are charged for Victorian applications, and building approvals from the ABS and the major projects we track are unaffected.

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Mornington Peninsula

Applications and major projects plotted where they are actually proposed, with the 84 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Mornington Peninsula

Mornington Peninsula covers 10 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Mornington Peninsula.

Hastings - Somers area profile

No separate approvals series published
287 applications on record · 319 new addresses since 2021
Build a map

Rosebud - McCrae area profile

No separate approvals series published
262 applications on record · 213 new addresses since 2021
Build a map

Mount Martha area profile

No separate approvals series published
67 applications on record · 102 new addresses since 2021
Build a map

Point Nepean area profile

No separate approvals series published
260 applications on record · 30 new addresses since 2021
Build a map

Mount Eliza area profile

No separate approvals series published
129 applications on record · 62 new addresses since 2021
Build a map

Somerville area profile

No separate approvals series published
263 applications on record · 149 new addresses since 2021
Build a map

Mornington - East area profile

No separate approvals series published
296 applications on record · 65 new addresses since 2021
Build a map

Dromana area profile

No separate approvals series published
212 applications on record · 146 new addresses since 2021
Build a map

Mornington - West area profile

No separate approvals series published
249 applications on record · 76 new addresses since 2021
Build a map

Flinders area profile

No separate approvals series published
155 applications on record
Build a map

Planning Authorities Councils Covering Mornington Peninsula

Development in Mornington Peninsula is assessed within the Mornington Peninsula local government area. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Mornington Peninsula.

Data & Method Sources & Method for Mornington Peninsula

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Mornington Peninsula is Statistical Area Level 3 21402 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 10 Statistical Areas Level 2. It has an estimated 172,293 residents, +2.0% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Development applications Council planning portals August 2021
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Mornington Peninsula — common questions

How many new dwellings were approved in Mornington Peninsula?

The ABS recorded 782 dwelling approvals across Mornington Peninsula in the 2024-25 financial year, against a five-year average of 845 a year.

How many development applications are lodged in Mornington Peninsula?

AreaSearch tracks 2,180 development applications of material scale across Mornington Peninsula — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged. Applications are assessed within the Mornington Peninsula local government area. The most recent application in our data was lodged in August 2021.

What major projects are planned for Mornington Peninsula?

AreaSearch tracks 57 current major projects in Mornington Peninsula, 14 of them under construction. The largest include Martha Cove Marina Village Centre, Victorian Renewable Energy Terminal (VRET) and Yaringa Boat Harbour Expansion.

Which council covers Mornington Peninsula?

Mornington Peninsula is an ABS Statistical Area Level 3. It is covered by the Mornington Peninsula local government area. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Mornington Peninsula growing faster than the rest of Victoria?

On development approvals, Mornington Peninsula is adding new dwellings more slowly than Victoria as a whole — 0.41 approvals per 100 existing dwellings a year against the state figure of 0.80.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in August 2021. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.