Building approvals, live development applications and major projects across the
Bringelly - Green Valley statistical area — covering Liverpool, Camden and Campbelltown.
SA3 12701Greater Sydney183,258 residents11 statistical areas
The PipelineDevelopment Pipeline in Bringelly - Green Valley
1 Proposed410applications in assessmentLeading · to August 2026See applications ↓
2 Approved3,026dwellings approved in 2024-25, or 1.59 per 100 existing dwellings a yearOfficial · ABS to June 2026See approvals ↓
3 Building116major projects committed or under construction, 63 of them already on siteForward · completions to 2030+See projects ↓
4 Delivered11,737new addresses verified since the 2021 Census, up 26.1% on the existing baseActual · to June 2026Where it landed ↓
In the 2024-25 financial year the ABS recorded 3,026 dwelling approvals across Bringelly - Green Valley. Right now, 410 development applications are before the 3 councils covering the area. AreaSearch tracks 116 major projects here that are committed or under construction, the largest being Bradfield City Centre at an estimated $8.25bn. On the ground, 11,737 new addresses have been verified since the 2021 Census — growth of 26.1% on the existing address base.
These four figures are deliberately not added together. An application, an
approval and a project under construction are often the same building at three points in its life,
measured by three different bodies with three different lags. Read them as a sequence, not a total.
ApprovedBuilding Approvals in Bringelly - Green Valley
What councils and certifiers have formally
permitted — the ABS series, published about four months in arrears.
Approvals are running at 1.59 per 100 existing dwellings a year, well above the New South Wales rate of 0.59. Development here remains overwhelmingly detached: houses account for 83% of recent approvals. The mix being approved closely matches what is already standing — 83% houses against 90% of existing homes. The average approved dwelling is valued at $424,000 in construction cost.
For its size, Bringelly - Green Valley is adding 1.59 dwellings a year per 100 existing homes — well above the New South Wales rate of 0.59 and the national rate of 0.71. That is about 15.3 approvals a year for every 1,000 residents. Building intensity has fallen by about 42% across the published series.
Measured against people rather than housing stock, Bringelly - Green Valley is approving 14.21 dwellings a year per 1,000 residents — well above the New South Wales rate of 5.61. The two rate views differ by household size, which here averages 3.5 people per home. Housing the projection to 2041 would need about 15.31 per 1,000 residents a year.
Dwelling approvals a year per 100 existing
homes, with New South Wales and Australia for comparison. This is the
same activity as the totals view, divided by the size of the area — which is the only
fair way to compare a large SA3 with a small one.
Dwelling approvals a year per 1,000
residents, each year divided by that year’s estimated resident
population (ABS ERP at 30 June), not by today’s — which matters most in fast-growing
areas, where a fixed denominator can understate the early years by half. The most recent periods use the latest published ERP, as the population series runs a year behind approvals. Read it alongside the per-100-homes view: the two differ wherever household size does.
Dwelling units approved each financial year. The dashed line is the five-year average of 2,807.
How intensively is it building?
Dwelling approvals a year per 100 existing dwellings.
Bringelly - Green Valley1.59
New South Wales0.59
Australia0.71
What is here, and what is coming
Detached houses as a share of existing homes,
against the share of recent approvals.
Existing homes (2021 Census)90%
Approved, last 5 years83%
Approved, latest year83%
Detached housesApartments, townhouses & other
Approvals mix by year
Share of each year’s approvals.
2022
2023
2024
2025
2024-25
$1.54bn
Residential work approved
2024-25
$925m
Commercial work approved
construction cost
$424,000
Average value per approved dwelling
last two years
63
Residents per approval
Supply & DemandIs Bringelly - Green Valley Building Enough Homes?
The same approvals, measured against the population
they have to house.
Bringelly - Green Valley approves about 15.3 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 40,178 residents and 11,737 new addresses, roughly one new home per 3.4 extra residents — broadly in step with an average household of 3.5. Housing the population projected for 2041 implies roughly 2,806 new dwellings a year from here, which puts the recent approval rate of 2,807 a year about level with what the projection needs.
Growth against supply since the Census
People added for every new address verified,
against the size of an average local household.
People added per new home3.4
Average household size3.5
A bar longer than the household average means
the area gained more residents than its new housing could hold, and the extra had to be
absorbed by existing homes.
Approval rate against projected need
Dwellings a year: what is currently being
approved, against what the 2041 population projection implies.
Approved (5-yr average)2,807
Implied need to 20412,806
Implied need assumes the average household stays
at today’s 3.5 people. Approvals are not
completions, and not every approval is built.
What is being asked for right now — applications
collected from council planning portals, before any of it reaches the ABS series above.
AreaSearch tracks applications of material scale; routine minor works such as signage and
fencing changes are not carried, so these are not counts of every application lodged. 78
of them carry an AreaSearch analyst assessment — look for the
Analysed marker in the search below.
AreaSearch tracks 2,943 development applications of material scale lodged with councils across Bringelly - Green Valley, the most recent in August 2026. 410 of them are still in assessment. The biggest categories in the queue by value are commercial, mixed-use and childcare. Live applications account for about 986 proposed dwellings.
Estimated value of applications by development type. This is the clearest
single picture of what kind of place Bringelly - Green Valley is being asked to become. A further 8 applications sit across
1 smaller category,
too few to plot.
Where the applications stand
As reported by the council. Highlighted rows are
applications still in assessment.
Approved1,456
Determined686
Under Assessment378
Additional Information Requested127
Returned108
Withdrawn100
117 applications are still marked under
assessment but were lodged more than
18 months ago. Councils often leave determined or
abandoned applications open in their feeds, so
they are counted here but excluded
from the live queue above.
By local government area
Applications on record within each council area that
overlaps Bringelly - Green Valley. This counts applications inside this
statistical area only — it is not a total for the council.
Camden1,677
Liverpool1,266
Recent applications in Bringelly - Green Valley
By estimated cost of works, as lodged. Estimates are the applicant’s own figures and are not verified by AreaSearch.
Large Retail DevelopmentsAustral - Greendale · Under Assessment · lodged May 2025
$50.0m
Demolish 3 dwellings, carry out earthworks, roadworks and drainage works. Construct industrial warehouses and hardstands and related landscaping.Austral - Greendale · Under Assessment · lodged Dec 2025 · 20 dwellings
Mixed-Use Precincts developmentCobbitty - Bringelly · Additional Information Requested · lodged Dec 2025
$31.4m
BuildingFORWARDMajor Projects & Infrastructure in Bringelly - Green Valley
What is funded and moving — the projects large enough
to change how Bringelly - Green Valley works, ranked by committed value and how close
they are to delivery.
AreaSearch tracks 116 current projects across Bringelly - Green Valley. The largest is Bradfield City Centre at an estimated $8.25bn, due by 2040. That breaks down as 63 under construction, 14 approved and awaiting a start and 39 still in planning. The pipeline is weighted toward residential development, transport & logistics and communities, precincts & urban renewal.
Under construction$1.20bnby 2026
Upper South Creek Advanced Water Recycling Centre (AWRC)
The Upper South Creek Advanced Water Recycling Centre (AWRC) is a 1.2 billion dollar landmark project in Western Sydney. It is designed to provide sustainable wastewater treatment and high-quality recycled…
Upper South Creek Advanced Water Recycling Centre - Stage One
Stage One of the $1.2 billion Upper South Creek Advanced Water Recycling Centre (AWRC) is currently in construction at Kemps Creek. Designed to treat 35 megalitres of wastewater per day, it will provide…
A major joint Australian and NSW Government road program supporting Western Sydney growth and access to Western Sydney International Airport. The program includes the M12 Motorway, The Northern Road upgrade…
Austral and Leppington North DevelopmentUnder construction · Communities, Precincts & Urban Renewal · by 2030 · Austral - Greendale
$3.50bn
Leppington Living East Village EstateUnder construction · Residential Development · by 2030 · Leppington - Catherine Field
$600m
Fifteenth Avenue Smart Transit (FAST) CorridorUnder construction · Transport & Logistics · by 2031 · Hinchinbrook
$1.00bn
Cobbitty by MirvacUnder construction · Communities · by 2030 · Cobbitty - Bringelly
$648m
101 further projects in
Bringelly - Green Valley are not listed here.
Combined values on this page exclude
1 whole-of-state program that
reaches this area but are not
local to it, and 8 records that appear to be
separate stages of a project already counted. Both are still listed
above with their own values.
Denotes AI-based impression for illustrative purposes only, not to be taken as
definitive under any circumstances. Please follow links and conduct other
investigations from the project’s source for actual imagery. Developers and
project owners wishing us to use original imagery please Contact
Us and we will do so.
Beyond 2030:
a further $28.2bn across
9 projects with completion dates further out — mostly precinct-scale programs whose dates are
indicative. Kept out of the chart so the years you can act on stay readable.
Estimated value of tracked projects by the year they are due to
complete, stacked by how certain they are. The dark band is money already being spent;
the pale band is still an intention. Estimates are indicative and mix infrastructure
cost with whole-of-precinct development value, so read the shape rather than the totals.
Approvals PipelineDevelopment Applications in Bringelly - Green Valley
Development applications around
Bringelly - Green Valley
Development approvals is a new addition to AreaSearch.
We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
—
In the local catchment
Est. Value
—
Where disclosed
Under Assessment
—
Awaiting determination
Determined
—
Approved or decided
Approvals pipelineStatus, location, timing and project scale
Loading development applications…
Lodged
Address
Description
Type
Distance
Status
SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.
ProfessionalPRODevelopment Map for Bringelly - Green Valley
Applications and major projects plotted where
they are actually proposed, with the
157 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage,
area and committed value. To search every application on record rather
than this sample, use the section above.
DistributionWhere Development Is Happening in Bringelly - Green Valley
Bringelly - Green Valley covers 11 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder
Each area below opens a map builder on its own page — a tool for
putting a map and a table into a report. Pick the place types you want plotted
(schools, supermarkets, medical, child care, transport and the rest of what
AreaSearch holds), add development applications as their own layer, drop your own
points, then recolour, renumber and export the result as a table or CSV.
A this area only toggle clips everything to the boundary you are looking at.
Searches are charged against your credit balance — 1 credit per 40
results from AreaSearch data — and setting filters costs nothing until
you search. The builder works on one suburb-sized area at a time, which is why it
opens per area rather than across the whole of
Bringelly - Green Valley.
Planning AuthoritiesCouncils Covering Bringelly - Green Valley
Bringelly - Green Valley spans 3 local government areas — Liverpool, Camden and Campbelltown. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development
figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS
issues a separate official building-approvals series for local government areas, and totals
built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page
reconcilable with the published ABS series.
Local government area
Share of Bringelly - Green Valley
Applications on record
Register read to
Liverpool
67% of residents
1,266
July 2026
Camden
33% of residents
1,677
August 2026
Campbelltown
0.1% of residents
—
Not yet collected
CompareNearby Development Hubs
The same view of building approvals, applications and
major projects for areas neighbouring Bringelly - Green Valley.
Data & MethodSources & Method for Bringelly - Green Valley
The four tenses, and what each one can tell you
Proposed — development applications
Collected from council planning portals. The
earliest signal available, but the least certain: many applications are amended,
withdrawn or refused, values are the applicant’s own estimate, and coverage
varies by council. This is a curated set, not the full council feed:
AreaSearch carries applications of material scale and does not track routine minor
works such as signage, fencing or small alterations, so the counts here are lower
than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than
18 months after lodgement are reported separately
and kept out of the live-queue figures: the age profile of open applications is
sharply split between a genuine queue under a year old and a long tail of records
councils never closed. Not every state publishes a cost of works — Queensland,
the Northern Territory and the ACT publish none at all — so on those pages
applications are counted rather than valued and no dollar figure is shown
rather than a partial one. Treated here as a snapshot of the current queue only —
AreaSearch does not chart application counts over time, because the history
reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from
ABS building approvals data, currently published to June 2026.
Counts dwelling units approved, not buildings and not completions. The most recent
financial year is annualised from nine months of data wherever it appears and is
labelled as such.
Building — major projects
Projects tracked individually by AreaSearch
from Infrastructure Australia, state infrastructure agencies, developer disclosures
and council records. Values are estimates and delivery dates are targets. Ranked on
this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national
address register since the 2021 Census. This is the closest available measure of what has
actually been built, though address creation can lead occupation and lags
construction. It is not a completions count.
Boundaries
Bringelly - Green Valley is Statistical Area Level 3 12701 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 11 Statistical Areas Level 2.
It has an estimated 183,258 residents, +28.1% since the 2021 Census.
Currency
Measure
Source
To
Dwelling approvals, five-year average
ABS / AreaSearch
June 2026
House share of approvals
ABS / AreaSearch
June 2026
Residents per approval
ABS / AreaSearch
June 2026
Value per approved dwelling
ABS / AreaSearch
June 2026
Commercial work approved
ABS / AreaSearch
June 2026
Verified new addresses since the Census
Address register / AreaSearch
May 2026
Development applications
Council planning portals
August 2026
Major projects
Infrastructure Australia / state agencies / AreaSearch
Ongoing
Figures on this page are read live from the
AreaSearch database each time it loads, so they update as soon as a source does.
Development in Bringelly - Green Valley — common questions
How many new dwellings were approved in Bringelly - Green Valley?
The ABS recorded 3,026 dwelling approvals across Bringelly - Green Valley in the 2024-25 financial year, against a five-year average of 2,807 a year.
How many development applications are lodged in Bringelly - Green Valley?
AreaSearch tracks 2,943 development applications of material scale across Bringelly - Green Valley — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 410 remain in assessment. Applications are assessed within the Liverpool, Camden and Campbelltown local government areas. The most recent application in our data was lodged in August 2026.
What major projects are planned for Bringelly - Green Valley?
AreaSearch tracks 116 current major projects in Bringelly - Green Valley, 63 of them under construction. The largest include Upper South Creek Advanced Water Recycling Centre (AWRC), Upper South Creek Advanced Water Recycling Centre - Stage One and Western Sydney Infrastructure Plan.
Which council covers Bringelly - Green Valley?
Bringelly - Green Valley is an ABS Statistical Area Level 3. It is covered by parts of 3 local government areas — Liverpool, Camden and Campbelltown. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.
Is Bringelly - Green Valley growing faster than the rest of New South Wales?
On development approvals, Bringelly - Green Valley is adding new dwellings faster than New South Wales as a whole — 1.59 approvals per 100 existing dwellings a year against the state figure of 0.59.
How current is this development data?
ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in August 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.
Development data is provided for general information.
Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and
are not independently verified by AreaSearch. Confirm anything material with the relevant council
or agency before relying on it.