Development in Wagga Wagga

NSW

Building approvals, live development applications and major projects across the Wagga Wagga statistical area — covering Wagga Wagga, Cootamundra-Gundagai Regional and Junee and 4 more.

SA3 11303 Rest of NSW 101,781 residents 9 statistical areas
Approved · FY25 606 dwellings approved
vs 5-yr average 495 average approvals a year
In the queue 130 live applications
Major projects 69 27 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 11303 How we calculate this

The Pipeline Development Pipeline in Wagga Wagga

1 Proposed 130 applications in assessment Leading · to June 2026 See applications ↓
2 Approved 606 dwellings approved in 2024-25, or 0.50 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 69 major projects committed or under construction, 27 of them already on site Forward · completions to 2030+ See projects ↓
4 Delivered 1,515 new addresses verified since the 2021 Census, up 3.2% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 606 dwelling approvals across Wagga Wagga. Right now, 130 development applications are before the 7 councils covering the area. AreaSearch tracks 69 major projects here that are committed or under construction, the largest being Rowan Village at an estimated $2.50bn. On the ground, 1,515 new addresses have been verified since the 2021 Census — growth of 3.2% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Wagga Wagga

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.50 per 100 existing dwellings a year, below the New South Wales rate of 0.59. The mix is genuinely split — 72% of recent approvals are detached houses and 29% are attached or higher-density dwellings. Detached houses make up 88% of the homes already standing here but only 75% of the past five years of approvals, so the area is densifying. The average approved dwelling is valued at $441,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 495.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Wagga Wagga 0.50
New South Wales 0.59
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 88%
Approved, last 5 years 75%
Approved, latest year 72%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$302m
Residential work approved
2024-25
$225m
Commercial work approved
construction cost
$441,000
Average value per approved dwelling
last two years
207
Residents per approval

Supply & Demand Is Wagga Wagga Building Enough Homes?

The same approvals, measured against the population they have to house.

Wagga Wagga approves about 4.9 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 2,612 residents and 1,515 new addresses — about 1.7 extra people per home built, below the 2.7-person average household, so building has run ahead of population growth. Housing the population projected for 2041 implies roughly 249 new dwellings a year from here, which puts the recent approval rate of 495 a year comfortably ahead of what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 1.7
Average household size 2.7

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 495
Implied need to 2041 249

Implied need assumes the average household stays at today’s 2.7 people. Approvals are not completions, and not every approval is built.

ProposedLEADING · to June 2026 Development Applications in Wagga Wagga

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged. 29 of them carry an AreaSearch analyst assessment — look for the Analysed marker in the search below.

AreaSearch tracks 1,306 development applications of material scale lodged with councils across Wagga Wagga, the most recent in June 2026. 130 of them are still in assessment. The biggest categories in the queue by value are NDIS and specialist disability housing, commercial and retail.

Estimated value of applications by development type. This is the clearest single picture of what kind of place Wagga Wagga is being asked to become. A further 10 applications sit across 1 smaller category, too few to plot.

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

Determined 770
Approved 248
Under Assessment 114
Withdrawn 58
Additional Information Requested 56
Cancelled 17

57 applications are still marked under assessment but were lodged more than 18 months ago. Councils often leave determined or abandoned applications open in their feeds, so they are counted here but excluded from the live queue above.

By local government area

Applications on record within each council area that overlaps Wagga Wagga. This counts applications inside this statistical area only — it is not a total for the council.

Wagga Wagga 883
Cootamundra-Gundagai Regional 141
Temora 104
Coolamon 71
Junee 58

Recent applications in Wagga Wagga

By estimated cost of works, as lodged. Estimates are the applicant’s own figures and are not verified by AreaSearch.

Mixed-Use Precincts development Wagga Wagga Surrounds · Under Assessment · lodged Jul 2025
$6.6m
Industrial / Warehousing development Junee · Under Assessment · lodged Feb 2026
$793k
Large Retail Developments Wagga Wagga - South · Additional Information Requested · lodged Mar 2026
$630k
Demolition of dwelling, construction of centre-based child care facility Wagga Wagga - West · Under Assessment · lodged Dec 2025
$510k

BuildingFORWARD Major Projects & Infrastructure in Wagga Wagga

What is funded and moving — the projects large enough to change how Wagga Wagga works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 69 current projects across Wagga Wagga. The largest is Rowan Village at an estimated $2.50bn, due by 2037. That breaks down as 27 under construction, 9 approved and awaiting a start and 33 still in planning. The pipeline is weighted toward transport & logistics, residential development and environmental & disaster management.
Inland Rail - Albury to Illabo
Under construction $301m by 2027

Inland Rail - Albury to Illabo

Enhancements across 185km of existing rail corridor from the Victoria-NSW border to Illabo to accommodate double-stacked freight trains. Major 2026 works include a 96-hour track possession in May for Murray…

Wagga Wagga - West

Temora Hospital Redevelopment
Under construction $95m by 2028

Temora Hospital Redevelopment

The $95 million Temora Hospital Redevelopment involves the construction of a new integrated health service building. Key features include a new emergency department, flexible inpatient units for maternity and…

Temora

Tolland Renewal Project
Under construction $500m by 2036

Tolland Renewal Project

A $500 million masterplanned estate renewal transforming the Tolland suburb. The project replaces aging social housing with approximately 500 new mixed-tenure homes, including a 40 percent allocation to social…

Wagga Wagga - South

Also in the pipeline

Wagga Wagga Special Activation Precinct Under construction · Communities, Precincts & Urban Renewal · by 2040 · Wagga Wagga - South
$212m
Pinaroo Village Under construction · Residential Development · by 2027 · Wagga Wagga - South
$35m
Gugaa BESS In planning · Energy · by 2030 · Wagga Wagga Surrounds
$350m
Dustin Rose Estate Under construction · Residential Development · by 2029 · Temora
$23m
Gregadoo Solar Farm & BESS In planning · Energy · by 2027 · Wagga Wagga - East
$150m
Jeremiah Wind Farm In planning · Energy · Gundagai
$1.20bn
Southern Growth Area - Wagga Wagga In planning · Communities · by 2037 · Wagga Wagga - South
$1.50bn
Rowan Village In planning · Communities, Precincts & Urban Renewal · by 2037 · Wagga Wagga - South
$2.50bn
Saddletop Wind Farm In planning · Energy · Gundagai
$1.10bn
Belhaven BESS In planning · Energy · by 2029 · Wagga Wagga - East
$350m
Highfields Estate Under construction · Residential Development · by 2026 · Temora
$15m
Northern Growth Area Master Plan In planning · Communities, Precincts & Urban Renewal · by 2040 · Wagga Wagga - North
$500m

54 further projects in Wagga Wagga are not listed here.

Combined values on this page exclude 1 record that appear to be separate stages of a project already counted. Both are still listed above with their own values.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $4.71bn across 4 projects with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Wagga Wagga

Development applications around Wagga Wagga

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
In the local catchment
Est. Value
Where disclosed
Under Assessment
Awaiting determination
Determined
Approved or decided
Approvals pipeline Status, location, timing and project scale

Loading development applications…

Lodged Address Description Type Distance Status

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Wagga Wagga

Applications and major projects plotted where they are actually proposed, with the 89 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Wagga Wagga

Wagga Wagga covers 9 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Wagga Wagga.

Wagga Wagga - South area profile

No separate approvals series published
137 applications on record · 233 new addresses since 2021
Build a map

Wagga Wagga Surrounds area profile

No separate approvals series published
298 applications on record · 681 new addresses since 2021
Build a map

Wagga Wagga - East area profile

No separate approvals series published
240 applications on record · 256 new addresses since 2021
Build a map

Wagga Wagga - West area profile

No separate approvals series published
237 applications on record · 127 new addresses since 2021
Build a map

Cootamundra area profile

No separate approvals series published
87 applications on record · 44 new addresses since 2021
Build a map

Temora area profile

No separate approvals series published
109 applications on record
Build a map

Junee area profile

No separate approvals series published
58 applications on record · 41 new addresses since 2021
Build a map

Wagga Wagga - North area profile

No separate approvals series published
86 applications on record · 106 new addresses since 2021
Build a map

Gundagai area profile

No separate approvals series published
54 applications on record
Build a map

Planning Authorities Councils Covering Wagga Wagga

Wagga Wagga spans 7 local government areas — Wagga Wagga, Cootamundra-Gundagai Regional, Junee, Temora, Coolamon, Lockhart and Greater Hume Shire. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of Wagga WaggaApplications on recordRegister read to
Wagga Wagga 68% of residents 883 June 2026
Cootamundra-Gundagai Regional 11% of residents 141 June 2026
Junee 6.5% of residents 58 June 2026
Temora 6.1% of residents 104 June 2026
Coolamon 4.4% of residents 71 June 2026
Lockhart 3.4% of residents 49 May 2026
Greater Hume Shire 0.0% of residents Not yet collected

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Wagga Wagga.

Data & Method Sources & Method for Wagga Wagga

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Wagga Wagga is Statistical Area Level 3 11303 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 9 Statistical Areas Level 2. It has an estimated 101,781 residents, +2.6% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Development applications Council planning portals June 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Wagga Wagga — common questions

How many new dwellings were approved in Wagga Wagga?

The ABS recorded 606 dwelling approvals across Wagga Wagga in the 2024-25 financial year, against a five-year average of 495 a year.

How many development applications are lodged in Wagga Wagga?

AreaSearch tracks 1,306 development applications of material scale across Wagga Wagga — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 130 remain in assessment. Applications are assessed within the Wagga Wagga, Cootamundra-Gundagai Regional and Junee local government areas. The most recent application in our data was lodged in June 2026.

What major projects are planned for Wagga Wagga?

AreaSearch tracks 69 current major projects in Wagga Wagga, 27 of them under construction. The largest include Inland Rail - Albury to Illabo, Temora Hospital Redevelopment and Tolland Renewal Project.

Which council covers Wagga Wagga?

Wagga Wagga is an ABS Statistical Area Level 3. It is covered by parts of 7 local government areas — Wagga Wagga, Cootamundra-Gundagai Regional, Junee, Temora, Coolamon, Lockhart and Greater Hume Shire. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Wagga Wagga growing faster than the rest of New South Wales?

On development approvals, Wagga Wagga is adding new dwellings more slowly than New South Wales as a whole — 0.50 approvals per 100 existing dwellings a year against the state figure of 0.59.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in June 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.