The PipelineDevelopment Pipeline in South Canberra
1 Proposed17applications in assessmentLeading · to July 2026See applications ↓
2 Approved54dwellings approved in 2024-25, or 0.23 per 100 existing dwellings a yearOfficial · ABS to June 2026See approvals ↓
3 Building17major projects committed or under construction, 8 of them already on siteForward · completions to 2030+See projects ↓
4 Delivered762new addresses verified since the 2021 Census, up 4.2% on the existing baseActual · to June 2026Where it landed ↓
In the 2024-25 financial year the ABS recorded 54 dwelling approvals across South Canberra. Right now, 17 development applications are in assessment. AreaSearch tracks 17 major projects here that are committed or under construction, the largest being Light Rail Stage 2B: Commonwealth Park to Woden at an estimated $450m. On the ground, 762 new addresses have been verified since the 2021 Census — growth of 4.2% on the existing address base.
These four figures are deliberately not added together. An application, an
approval and a project under construction are often the same building at three points in its life,
measured by three different bodies with three different lags. Read them as a sequence, not a total.
ApprovedBuilding Approvals in South Canberra
What councils and certifiers have formally
permitted — the ABS series, published about four months in arrears.
Approvals are running at 0.23 per 100 existing dwellings a year, well below the Australian Capital Territory rate of 0.70. The mix is genuinely split — 69% of recent approvals are detached houses and 31% are attached or higher-density dwellings. That is a clear shift back toward detached housing — the five-year average is 42% houses. The mix being approved closely matches what is already standing — 42% houses against 41% of existing homes. The average approved dwelling is valued at $489,000 in construction cost.
For its size, South Canberra is adding 0.23 dwellings a year per 100 existing homes — well below the Australian Capital Territory rate of 0.70 and the national rate of 0.71. That is about 4.5 approvals a year for every 1,000 residents. Building intensity has fallen by about 60% across the published series.
Measured against people rather than housing stock, South Canberra is approving 2.87 dwellings a year per 1,000 residents — below the Australian Capital Territory rate of 5.63. The two rate views differ by household size, which here averages 2.4 people per home. Housing the projection to 2041 would need about 4.86 per 1,000 residents a year.
Dwelling approvals a year per 100 existing
homes, with Australian Capital Territory and Australia for comparison. This is the
same activity as the totals view, divided by the size of the area — which is the only
fair way to compare a large SA3 with a small one.
Dwelling approvals a year per 1,000
residents, each year divided by that year’s estimated resident
population (ABS ERP at 30 June), not by today’s — which matters most in fast-growing
areas, where a fixed denominator can understate the early years by half. The most recent periods use the latest published ERP, as the population series runs a year behind approvals. Read it alongside the per-100-homes view: the two differ wherever household size does.
Dwelling units approved each financial year. The dashed line is the five-year average of 156.
How intensively is it building?
Dwelling approvals a year per 100 existing dwellings.
South Canberra0.23
Australian Capital Territory0.70
Australia0.71
What is here, and what is coming
Detached houses as a share of existing homes,
against the share of recent approvals.
Existing homes (2021 Census)41%
Approved, last 5 years42%
Approved, latest year69%
Detached housesApartments, townhouses & other
Approvals mix by year
Share of each year’s approvals.
2022
2023
2024
2025
2024-25
$48.0m
Residential work approved
2024-25
$346m
Commercial work approved
construction cost
$489,000
Average value per approved dwelling
last two years
489
Residents per approval
Supply & DemandIs South Canberra Building Enough Homes?
The same approvals, measured against the population
they have to house.
South Canberra approves about 4.5 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 3,314 residents but only 762 new addresses — about 4.3 extra people for every home built, against an average household of 2.4. On those numbers supply has not kept pace with growth. Housing the population projected for 2041 implies roughly 170 new dwellings a year from here, which puts the recent approval rate of 156 a year about level with what the projection needs.
Growth against supply since the Census
People added for every new address verified,
against the size of an average local household.
People added per new home4.3
Average household size2.4
A bar longer than the household average means
the area gained more residents than its new housing could hold, and the extra had to be
absorbed by existing homes.
Approval rate against projected need
Dwellings a year: what is currently being
approved, against what the 2041 population projection implies.
Approved (5-yr average)156
Implied need to 2041170
Implied need assumes the average household stays
at today’s 2.4 people. Approvals are not
completions, and not every approval is built.
What is being asked for right now — applications
collected from council planning portals, before any of it reaches the ABS series above.
AreaSearch tracks applications of material scale; routine minor works such as signage and
fencing changes are not carried, so these are not counts of every application lodged. 62
of them carry an AreaSearch analyst assessment — look for the
Analysed marker in the search below.
AreaSearch tracks 196 development applications of material scale lodged with council across South Canberra, the most recent in July 2026. 17 of them are still in assessment. The most common types in the queue are commercial, multi-residential and industrial.
Number of applications by development type. This is the clearest
single picture of what kind of place South Canberra is being asked to become. Councils in
Australian Capital Territory do not publish an estimated cost of works in
their planning feeds, so applications here are counted rather than valued.
Where the applications stand
As reported by the council. Highlighted rows are
applications still in assessment.
Decided176
Under Assessment12
On notification5
Lodged3
3 applications are still marked under
assessment but were lodged more than
18 months ago. Councils often leave determined or
abandoned applications open in their feeds, so
they are counted here but excluded
from the live queue above.
By local government area
Applications on record within each council area that
overlaps South Canberra. This counts applications inside this
statistical area only — it is not a total for the council.
Unincorporated ACT196
Recent applications in South Canberra
By the number of dwellings proposed, as lodged. Figures are the applicant’s own and are not verified by AreaSearch.
Demolition of existing building and construction of seven 3-bedroom townhouses with basement parkingRed Hill (ACT) · On notification · lodged Jul 2026
7 dwellings
Demolition of existing structures and construction of five 2-storey townhouses with common basement.Forrest · Under Assessment · lodged Feb 2026
5 dwellings
Amendment to a dual occupancy development and lease variation applicationDeakin · Lodged · lodged Feb 2026
2 dwellings
Proposed demolition of existing dwelling and construction of new 2 storey + basement dwelling with landscaping.Griffith (ACT) · On notification · lodged Mar 2026
1 dwellings
Installation of 15 rooftop exhaust stacks on Buildings A and D at CIT Fyshwick campusNarrabundah · On notification · lodged Jul 2026
Construction of a non-permanent lightweight veranda/shopfront enclosure.Griffith (ACT) · On notification · lodged May 2026
Demolition of existing structures and construction of two 2-storey warehouses with a lease variationFyshwick · Lodged · lodged Apr 2026
Amendment to vary Crown lease to add commercial accommodation as a permissible use and modify parking requirementsGriffith (ACT) · Under assessment · lodged Mar 2026
BuildingFORWARDMajor Projects & Infrastructure in South Canberra
What is funded and moving — the projects large enough
to change how South Canberra works, ranked by committed value and how close
they are to delivery.
AreaSearch tracks 17 current projects across South Canberra. The largest is Light Rail Stage 2B: Commonwealth Park to Woden at an estimated $450m, due by 2033. That breaks down as 8 under construction, 4 approved and awaiting a start and 5 still in planning. The pipeline is weighted toward communities, precincts & urban renewal, residential development and arts & culture.
Under construction$81mby 2028
National Security Office Precinct (York Park)
A multi-agency office precinct at York Park in Barton designed to accommodate approximately 5,000 workers from national security and Commonwealth agencies, including the Office of National Intelligence and…
A major landscape-led mixed-use neighbourhood redevelopment of 14 hectares of former industrial land near the Jerrabomberra Wetlands. Designed by David Chipperfield Architects and developed by Molonglo Group…
Fyshwick
Under construction$25mby 2026
Griffith-Narrabundah Community Centre & Oval Upgrade
ACT Government project delivering a new multi-purpose community centre and upgrades to Griffith Oval, including a new pavilion, upgraded play spaces, and improved amenities. The facility serves residents of…
Inner South District StrategyApproved · Communities, Precincts & Urban Renewal · by 2023 · Deakin
2 Schlich Street Public HousingApproved · Residential Development · Yarralumla
2 further projects in
South Canberra are not listed here.
Denotes AI-based impression for illustrative purposes only, not to be taken as
definitive under any circumstances. Please follow links and conduct other
investigations from the project’s source for actual imagery. Developers and
project owners wishing us to use original imagery please Contact
Us and we will do so.
Beyond 2030:
a further $450m across
1 project with completion dates further out — mostly precinct-scale programs whose dates are
indicative. Kept out of the chart so the years you can act on stay readable.
Estimated value of tracked projects by the year they are due to
complete, stacked by how certain they are. The dark band is money already being spent;
the pale band is still an intention. Estimates are indicative and mix infrastructure
cost with whole-of-precinct development value, so read the shape rather than the totals.
Approvals PipelineDevelopment Applications in South Canberra
Development applications around
South Canberra
Development approvals is a new addition to AreaSearch.
We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
—
In the local catchment
Est. Value
—
Where disclosed
Under Assessment
—
Awaiting determination
Determined
—
Approved or decided
Approvals pipelineStatus, location, timing and project scale
Loading development applications…
Lodged
Address
Description
Type
Distance
Status
SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.
ProfessionalPRODevelopment Map for South Canberra
Applications and major projects plotted where
they are actually proposed, with the
25 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage,
area and committed value. To search every application on record rather
than this sample, use the section above.
DistributionWhere Development Is Happening in South Canberra
South Canberra covers 8 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder
Each area below opens a map builder on its own page — a tool for
putting a map and a table into a report. Pick the place types you want plotted
(schools, supermarkets, medical, child care, transport and the rest of what
AreaSearch holds), add development applications as their own layer, drop your own
points, then recolour, renumber and export the result as a table or CSV.
A this area only toggle clips everything to the boundary you are looking at.
Searches are charged against your credit balance — 1 credit per 40
results from AreaSearch data — and setting filters costs nothing until
you search. The builder works on one suburb-sized area at a time, which is why it
opens per area rather than across the whole of
South Canberra.
Collected from council planning portals. The
earliest signal available, but the least certain: many applications are amended,
withdrawn or refused, values are the applicant’s own estimate, and coverage
varies by council. This is a curated set, not the full council feed:
AreaSearch carries applications of material scale and does not track routine minor
works such as signage, fencing or small alterations, so the counts here are lower
than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than
18 months after lodgement are reported separately
and kept out of the live-queue figures: the age profile of open applications is
sharply split between a genuine queue under a year old and a long tail of records
councils never closed. Not every state publishes a cost of works — Queensland,
the Northern Territory and the ACT publish none at all — so on those pages
applications are counted rather than valued and no dollar figure is shown
rather than a partial one. Treated here as a snapshot of the current queue only —
AreaSearch does not chart application counts over time, because the history
reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from
ABS building approvals data, currently published to June 2026.
Counts dwelling units approved, not buildings and not completions. The most recent
financial year is annualised from nine months of data wherever it appears and is
labelled as such.
Building — major projects
Projects tracked individually by AreaSearch
from Infrastructure Australia, state infrastructure agencies, developer disclosures
and council records. Values are estimates and delivery dates are targets. Ranked on
this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national
address register since the 2021 Census. This is the closest available measure of what has
actually been built, though address creation can lead occupation and lags
construction. It is not a completions count.
Boundaries
South Canberra is Statistical Area Level 3 80106 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 8 Statistical Areas Level 2.
It has an estimated 34,906 residents, +10.5% since the 2021 Census.
Currency
Measure
Source
To
Dwelling approvals, five-year average
ABS / AreaSearch
June 2026
House share of approvals
ABS / AreaSearch
June 2026
Residents per approval
ABS / AreaSearch
June 2026
Value per approved dwelling
ABS / AreaSearch
June 2026
Commercial work approved
ABS / AreaSearch
June 2026
Verified new addresses since the Census
Address register / AreaSearch
May 2026
Development applications
Council planning portals
July 2026
Major projects
Infrastructure Australia / state agencies / AreaSearch
Ongoing
Figures on this page are read live from the
AreaSearch database each time it loads, so they update as soon as a source does.
Development in South Canberra — common questions
How many new dwellings were approved in South Canberra?
The ABS recorded 54 dwelling approvals across South Canberra in the 2024-25 financial year, against a five-year average of 156 a year.
How many development applications are lodged in South Canberra?
AreaSearch tracks 196 development applications of material scale across South Canberra — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 17 remain in assessment. The most recent application in our data was lodged in July 2026.
What major projects are planned for South Canberra?
AreaSearch tracks 17 current major projects in South Canberra, 8 of them under construction. The largest include National Security Office Precinct (York Park), Dairy Road Precinct and Griffith-Narrabundah Community Centre & Oval Upgrade.
Is South Canberra growing faster than the rest of Australian Capital Territory?
On development approvals, South Canberra is adding new dwellings more slowly than Australian Capital Territory as a whole — 0.23 approvals per 100 existing dwellings a year against the state figure of 0.70.
How current is this development data?
ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in July 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.
Development data is provided for general information.
Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and
are not independently verified by AreaSearch. Confirm anything material with the relevant council
or agency before relying on it.