Building approvals, live development applications and major projects across the
Shoalhaven statistical area — covering Shoalhaven, Wingecarribee and Kiama.
SA3 11401Rest of NSW111,893 residents11 statistical areas
1 Proposed308applications in assessmentLeading · to June 2026See applications ↓
2 Approved867dwellings approved in 2024-25, or 0.70 per 100 existing dwellings a yearOfficial · ABS to June 2026See approvals ↓
3 Building67major projects committed or under construction, 22 of them already on siteForward · completions to 2030+See projects ↓
4 Delivered2,554new addresses verified since the 2021 Census, up 4.3% on the existing baseActual · to June 2026Where it landed ↓
In the 2024-25 financial year the ABS recorded 867 dwelling approvals across Shoalhaven. Right now, 308 development applications are before the 3 councils covering the area. AreaSearch tracks 67 major projects here that are committed or under construction, the largest being Moss Vale Road North Urban Release Area (Badagarang) at an estimated $2.50bn. On the ground, 2,554 new addresses have been verified since the 2021 Census — growth of 4.3% on the existing address base.
These four figures are deliberately not added together. An application, an
approval and a project under construction are often the same building at three points in its life,
measured by three different bodies with three different lags. Read them as a sequence, not a total.
ApprovedBuilding Approvals in Shoalhaven
What councils and certifiers have formally
permitted — the ABS series, published about four months in arrears.
Approvals are running at 0.70 per 100 existing dwellings a year, above the New South Wales rate of 0.59. The mix is genuinely split — 56% of recent approvals are detached houses and 44% are attached or higher-density dwellings. Detached houses make up 88% of the homes already standing here but only 63% of the past five years of approvals, so the area is densifying. The average approved dwelling is valued at $493,000 in construction cost.
For its size, Shoalhaven is adding 0.70 dwellings a year per 100 existing homes — above the New South Wales rate of 0.59 and the national rate of 0.71. That is about 6.7 approvals a year for every 1,000 residents. Building intensity has fallen by about 33% across the published series.
Measured against people rather than housing stock, Shoalhaven is approving 6.17 dwellings a year per 1,000 residents — in line with the New South Wales rate of 5.61. The two rate views differ by household size, which here averages 2.5 people per home. Housing the projection to 2041 would need about 5.57 per 1,000 residents a year.
Dwelling approvals a year per 100 existing
homes, with New South Wales and Australia for comparison. This is the
same activity as the totals view, divided by the size of the area — which is the only
fair way to compare a large SA3 with a small one.
Dwelling approvals a year per 1,000
residents, each year divided by that year’s estimated resident
population (ABS ERP at 30 June), not by today’s — which matters most in fast-growing
areas, where a fixed denominator can understate the early years by half. The most recent periods use the latest published ERP, as the population series runs a year behind approvals. Read it alongside the per-100-homes view: the two differ wherever household size does.
Dwelling units approved each financial year. The dashed line is the five-year average of 750.
How intensively is it building?
Dwelling approvals a year per 100 existing dwellings.
Shoalhaven0.70
New South Wales0.59
Australia0.71
What is here, and what is coming
Detached houses as a share of existing homes,
against the share of recent approvals.
Existing homes (2021 Census)88%
Approved, last 5 years63%
Approved, latest year56%
Detached housesApartments, townhouses & other
Approvals mix by year
Share of each year’s approvals.
2022
2023
2024
2025
2024-25
$485m
Residential work approved
2024-25
$237m
Commercial work approved
construction cost
$493,000
Average value per approved dwelling
last two years
145
Residents per approval
Supply & DemandIs Shoalhaven Building Enough Homes?
The same approvals, measured against the population
they have to house.
Shoalhaven approves about 6.7 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 3,565 residents and 2,554 new addresses — about 1.4 extra people per home built, below the 2.5-person average household, so building has run ahead of population growth. Housing the population projected for 2041 implies roughly 624 new dwellings a year from here, which puts the recent approval rate of 750 a year comfortably ahead of what the projection needs.
Growth against supply since the Census
People added for every new address verified,
against the size of an average local household.
People added per new home1.4
Average household size2.5
A bar longer than the household average means
the area gained more residents than its new housing could hold, and the extra had to be
absorbed by existing homes.
Approval rate against projected need
Dwellings a year: what is currently being
approved, against what the 2041 population projection implies.
Approved (5-yr average)750
Implied need to 2041624
Implied need assumes the average household stays
at today’s 2.5 people. Approvals are not
completions, and not every approval is built.
What is being asked for right now — applications
collected from council planning portals, before any of it reaches the ABS series above.
AreaSearch tracks applications of material scale; routine minor works such as signage and
fencing changes are not carried, so these are not counts of every application lodged. 36
of them carry an AreaSearch analyst assessment — look for the
Analysed marker in the search below.
AreaSearch tracks 1,703 development applications of material scale lodged with councils across Shoalhaven, the most recent in June 2026. 308 of them are still in assessment. The biggest categories in the queue by value are commercial, mixed-use and multi-residential.
Estimated value of applications by development type. This is the clearest
single picture of what kind of place Shoalhaven is being asked to become.
Where the applications stand
As reported by the council. Highlighted rows are
applications still in assessment.
Determined600
Approved498
Under Assessment274
Returned108
Additional Information Requested92
Withdrawn58
78 applications are still marked under
assessment but were lodged more than
18 months ago. Councils often leave determined or
abandoned applications open in their feeds, so
they are counted here but excluded
from the live queue above.
By local government area
Applications on record within each council area that
overlaps Shoalhaven. This counts applications inside this
statistical area only — it is not a total for the council.
Shoalhaven1,703
Recent applications in Shoalhaven
By estimated cost of works, as lodged. Estimates are the applicant’s own figures and are not verified by AreaSearch.
Large Retail DevelopmentsHuskisson - Vincentia · Under Assessment · lodged Jul 2025 · 16 dwellings
$3.3m
BuildingFORWARDMajor Projects & Infrastructure in Shoalhaven
What is funded and moving — the projects large enough
to change how Shoalhaven works, ranked by committed value and how close
they are to delivery.
AreaSearch tracks 67 current projects across Shoalhaven. The largest is Moss Vale Road North Urban Release Area (Badagarang) at an estimated $2.50bn, due by 2041. That breaks down as 22 under construction, 13 approved and awaiting a start and 32 still in planning. The pipeline is weighted toward communities, precincts & urban renewal, residential development and transport & logistics.
Under construction$440mby 2027
Shoalhaven Memorial Hospital Redevelopment
The $440 million redevelopment is transforming Shoalhaven Memorial Hospital into a regional health hub. Key features include a new seven-storey Acute Services Building, the facility's first-ever MRI service…
Sussex Inlet Golf Village is a master-planned community of 750 residences being developed across 234 hectares in Sussex Inlet on the NSW South Coast. A joint venture between Lucas Property Group and Sheargold…
Jervis Bay Road and Princes Highway Intersection Upgrade
A $164 million grade-separated interchange upgrade at the junction of the Princes Highway and Jervis Bay Road at Falls Creek, south of Nowra. The project delivers a new overpass bridge carrying Princes Highway…
Nowra East Public School UpgradeUnder construction · Education & Training · by 2027 · Nowra
$30m
52 further projects in
Shoalhaven are not listed here.
Combined values on this page exclude
1 record that appear to be
separate stages of a project already counted. Both are still listed
above with their own values.
Denotes AI-based impression for illustrative purposes only, not to be taken as
definitive under any circumstances. Please follow links and conduct other
investigations from the project’s source for actual imagery. Developers and
project owners wishing us to use original imagery please Contact
Us and we will do so.
Beyond 2030:
a further $5.87bn across
10 projects with completion dates further out — mostly precinct-scale programs whose dates are
indicative. Kept out of the chart so the years you can act on stay readable.
Estimated value of tracked projects by the year they are due to
complete, stacked by how certain they are. The dark band is money already being spent;
the pale band is still an intention. Estimates are indicative and mix infrastructure
cost with whole-of-precinct development value, so read the shape rather than the totals.
Approvals PipelineDevelopment Applications in Shoalhaven
Development applications around
Shoalhaven
Development approvals is a new addition to AreaSearch.
We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
—
In the local catchment
Est. Value
—
Where disclosed
Under Assessment
—
Awaiting determination
Determined
—
Approved or decided
Approvals pipelineStatus, location, timing and project scale
Loading development applications…
Lodged
Address
Description
Type
Distance
Status
SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.
ProfessionalPRODevelopment Map for Shoalhaven
Applications and major projects plotted where
they are actually proposed, with the
90 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage,
area and committed value. To search every application on record rather
than this sample, use the section above.
DistributionWhere Development Is Happening in Shoalhaven
Shoalhaven covers 11 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder
Each area below opens a map builder on its own page — a tool for
putting a map and a table into a report. Pick the place types you want plotted
(schools, supermarkets, medical, child care, transport and the rest of what
AreaSearch holds), add development applications as their own layer, drop your own
points, then recolour, renumber and export the result as a table or CSV.
A this area only toggle clips everything to the boundary you are looking at.
Searches are charged against your credit balance — 1 credit per 40
results from AreaSearch data — and setting filters costs nothing until
you search. The builder works on one suburb-sized area at a time, which is why it
opens per area rather than across the whole of
Shoalhaven.
Shoalhaven spans 3 local government areas — Shoalhaven, Wingecarribee and Kiama. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development
figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS
issues a separate official building-approvals series for local government areas, and totals
built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page
reconcilable with the published ABS series.
Local government area
Share of Shoalhaven
Applications on record
Register read to
Shoalhaven
100% of residents
1,703
June 2026
Wingecarribee
0.0% of residents
—
Not yet collected
Kiama
0.0% of residents
—
Not yet collected
CompareNearby Development Hubs
The same view of building approvals, applications and
major projects for areas neighbouring Shoalhaven.
Collected from council planning portals. The
earliest signal available, but the least certain: many applications are amended,
withdrawn or refused, values are the applicant’s own estimate, and coverage
varies by council. This is a curated set, not the full council feed:
AreaSearch carries applications of material scale and does not track routine minor
works such as signage, fencing or small alterations, so the counts here are lower
than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than
18 months after lodgement are reported separately
and kept out of the live-queue figures: the age profile of open applications is
sharply split between a genuine queue under a year old and a long tail of records
councils never closed. Not every state publishes a cost of works — Queensland,
the Northern Territory and the ACT publish none at all — so on those pages
applications are counted rather than valued and no dollar figure is shown
rather than a partial one. Treated here as a snapshot of the current queue only —
AreaSearch does not chart application counts over time, because the history
reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from
ABS building approvals data, currently published to June 2026.
Counts dwelling units approved, not buildings and not completions. The most recent
financial year is annualised from nine months of data wherever it appears and is
labelled as such.
Building — major projects
Projects tracked individually by AreaSearch
from Infrastructure Australia, state infrastructure agencies, developer disclosures
and council records. Values are estimates and delivery dates are targets. Ranked on
this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national
address register since the 2021 Census. This is the closest available measure of what has
actually been built, though address creation can lead occupation and lags
construction. It is not a completions count.
Boundaries
Shoalhaven is Statistical Area Level 3 11401 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 11 Statistical Areas Level 2.
It has an estimated 111,893 residents, +3.3% since the 2021 Census.
Currency
Measure
Source
To
Dwelling approvals, five-year average
ABS / AreaSearch
June 2026
House share of approvals
ABS / AreaSearch
June 2026
Residents per approval
ABS / AreaSearch
June 2026
Value per approved dwelling
ABS / AreaSearch
June 2026
Commercial work approved
ABS / AreaSearch
June 2026
Verified new addresses since the Census
Address register / AreaSearch
May 2026
Development applications
Council planning portals
June 2026
Major projects
Infrastructure Australia / state agencies / AreaSearch
Ongoing
Figures on this page are read live from the
AreaSearch database each time it loads, so they update as soon as a source does.
Development in Shoalhaven — common questions
How many new dwellings were approved in Shoalhaven?
The ABS recorded 867 dwelling approvals across Shoalhaven in the 2024-25 financial year, against a five-year average of 750 a year.
How many development applications are lodged in Shoalhaven?
AreaSearch tracks 1,703 development applications of material scale across Shoalhaven — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 308 remain in assessment. Applications are assessed within the Shoalhaven, Wingecarribee and Kiama local government areas. The most recent application in our data was lodged in June 2026.
What major projects are planned for Shoalhaven?
AreaSearch tracks 67 current major projects in Shoalhaven, 22 of them under construction. The largest include Shoalhaven Memorial Hospital Redevelopment, Sussex Inlet Golf Village and Jervis Bay Road and Princes Highway Intersection Upgrade.
Which council covers Shoalhaven?
Shoalhaven is an ABS Statistical Area Level 3. It is covered by parts of 3 local government areas — Shoalhaven, Wingecarribee and Kiama. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.
Is Shoalhaven growing faster than the rest of New South Wales?
On development approvals, Shoalhaven is adding new dwellings faster than New South Wales as a whole — 0.70 approvals per 100 existing dwellings a year against the state figure of 0.59.
How current is this development data?
ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in June 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.
Development data is provided for general information.
Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and
are not independently verified by AreaSearch. Confirm anything material with the relevant council
or agency before relying on it.