The PipelineDevelopment Pipeline in Dapto - Port Kembla
1 Proposed121applications in assessmentLeading · to June 2026See applications ↓
2 Approved356dwellings approved in 2024-25, or 0.50 per 100 existing dwellings a yearOfficial · ABS to June 2026See approvals ↓
3 Building65major projects committed or under construction, 22 of them already on siteForward · completions to 2030+See projects ↓
4 Delivered1,925new addresses verified since the 2021 Census, up 6.0% on the existing baseActual · to June 2026Where it landed ↓
In the 2024-25 financial year the ABS recorded 356 dwelling approvals across Dapto - Port Kembla. Right now, 121 development applications are lodged in the Wollongong local government area. AreaSearch tracks 65 major projects here that are committed or under construction, the largest being Illawarra Offshore Wind Zone at an estimated $9.00bn. On the ground, 1,925 new addresses have been verified since the 2021 Census — growth of 6.0% on the existing address base.
These four figures are deliberately not added together. An application, an
approval and a project under construction are often the same building at three points in its life,
measured by three different bodies with three different lags. Read them as a sequence, not a total.
ApprovedBuilding Approvals in Dapto - Port Kembla
What councils and certifiers have formally
permitted — the ABS series, published about four months in arrears.
Approvals are running at 0.50 per 100 existing dwellings a year, below the New South Wales rate of 0.59. The mix is genuinely split — 60% of recent approvals are detached houses and 40% are attached or higher-density dwellings. Detached houses make up 86% of the homes already standing here but only 55% of the past five years of approvals, so the area is densifying. The average approved dwelling is valued at $384,000 in construction cost.
For its size, Dapto - Port Kembla is adding 0.50 dwellings a year per 100 existing homes — below the New South Wales rate of 0.59 and the national rate of 0.71. That is about 5.4 approvals a year for every 1,000 residents. Building intensity has been broadly stable across the published series.
Measured against people rather than housing stock, Dapto - Port Kembla is approving 5.65 dwellings a year per 1,000 residents — in line with the New South Wales rate of 5.61. The two rate views differ by household size, which here averages 2.7 people per home. Housing the projection to 2041 would need about 4.27 per 1,000 residents a year.
Dwelling approvals a year per 100 existing
homes, with New South Wales and Australia for comparison. This is the
same activity as the totals view, divided by the size of the area — which is the only
fair way to compare a large SA3 with a small one.
Dwelling approvals a year per 1,000
residents, each year divided by that year’s estimated resident
population (ABS ERP at 30 June), not by today’s — which matters most in fast-growing
areas, where a fixed denominator can understate the early years by half. The most recent periods use the latest published ERP, as the population series runs a year behind approvals. Read it alongside the per-100-homes view: the two differ wherever household size does.
Dwelling units approved each financial year. The dashed line is the five-year average of 454.
How intensively is it building?
Dwelling approvals a year per 100 existing dwellings.
Dapto - Port Kembla0.50
New South Wales0.59
Australia0.71
What is here, and what is coming
Detached houses as a share of existing homes,
against the share of recent approvals.
Existing homes (2021 Census)86%
Approved, last 5 years55%
Approved, latest year60%
Detached housesApartments, townhouses & other
Approvals mix by year
Share of each year’s approvals.
2022
2023
2024
2025
2024-25
$147m
Residential work approved
2024-25
$140m
Commercial work approved
construction cost
$384,000
Average value per approved dwelling
last two years
205
Residents per approval
Supply & DemandIs Dapto - Port Kembla Building Enough Homes?
The same approvals, measured against the population
they have to house.
Dapto - Port Kembla approves about 5.4 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 3,763 residents and 1,925 new addresses — about 2.0 extra people per home built, below the 2.7-person average household, so building has run ahead of population growth. Housing the population projected for 2041 implies roughly 357 new dwellings a year from here, which puts the recent approval rate of 454 a year comfortably ahead of what the projection needs.
Growth against supply since the Census
People added for every new address verified,
against the size of an average local household.
People added per new home2.0
Average household size2.7
A bar longer than the household average means
the area gained more residents than its new housing could hold, and the extra had to be
absorbed by existing homes.
Approval rate against projected need
Dwellings a year: what is currently being
approved, against what the 2041 population projection implies.
Approved (5-yr average)454
Implied need to 2041357
Implied need assumes the average household stays
at today’s 2.7 people. Approvals are not
completions, and not every approval is built.
What is being asked for right now — applications
collected from council planning portals, before any of it reaches the ABS series above.
AreaSearch tracks applications of material scale; routine minor works such as signage and
fencing changes are not carried, so these are not counts of every application lodged. 28
of them carry an AreaSearch analyst assessment — look for the
Analysed marker in the search below.
AreaSearch tracks 779 development applications of material scale lodged with council across Dapto - Port Kembla, the most recent in June 2026. 121 of them are still in assessment. The biggest categories in the queue by value are mixed-use, commercial and industrial.
Estimated value of applications by development type. This is the clearest
single picture of what kind of place Dapto - Port Kembla is being asked to become. A further 4 applications sit across
1 smaller category,
too few to plot.
Where the applications stand
As reported by the council. Highlighted rows are
applications still in assessment.
Determined301
Approved258
Under Assessment107
Additional Information Requested43
Withdrawn35
Cancelled14
37 applications are still marked under
assessment but were lodged more than
18 months ago. Councils often leave determined or
abandoned applications open in their feeds, so
they are counted here but excluded
from the live queue above.
By local government area
Applications on record within each council area that
overlaps Dapto - Port Kembla. This counts applications inside this
statistical area only — it is not a total for the council.
Wollongong779
Recent applications in Dapto - Port Kembla
By estimated cost of works, as lodged. Estimates are the applicant’s own figures and are not verified by AreaSearch.
Place of public worship, Subdivision, Alterations or additions to an existing building or structure, Erection of a new structure, Early Education and…Berkeley - Lake Heights - Cringila · Additional Information Requested · lodged Dec 2025
$9.3m
Demolition and construction of a new structure for a place of public worship and a centre-based child care facility in Koonawarra.Dapto - Avondale · Under Assessment · lodged Jul 2025
$3.3m
Large Retail DevelopmentsWindang - Primbee · Additional Information Requested · lodged Jan 2026 · 4 dwellings
$2.3m
Development application for a new centre-based child care facility in Stream Hill.Horsley - Kembla Grange · Pending Court Appeal · lodged Apr 2025
$2.0m
Advertising and signage, Erection of a new structure, Early Education and Care Facility, Centre-based child careUnanderra - Mount Kembla · Additional Information Requested · lodged Jul 2025
$1.3m
Large Retail DevelopmentsUnanderra - Mount Kembla · Additional Information Requested · lodged Dec 2025
$935k
BuildingFORWARDMajor Projects & Infrastructure in Dapto - Port Kembla
What is funded and moving — the projects large enough
to change how Dapto - Port Kembla works, ranked by committed value and how close
they are to delivery.
AreaSearch tracks 65 current projects across Dapto - Port Kembla. The largest is Illawarra Offshore Wind Zone at an estimated $9.00bn, due by 2035. That breaks down as 22 under construction, 11 approved and awaiting a start and 32 still in planning. The pipeline is weighted toward transport & logistics, residential development and communities, precincts & urban renewal.
Under construction$1.15bnby 2026
BlueScope No. 6 Blast Furnace Reline
A 1.15 billion AUD blast furnace reline project critical for future steelmaking in the Illawarra. The No. 6 Blast Furnace will replace the No. 5 Blast Furnace when it reaches the end of its life around…
Port Kembla Industrial
Under construction$1.90bnby 2027
Rail Service Improvement Program (Mortdale to Kiama)
The Rail Service Improvement Program (formerly More Trains, More Services) is a multi-billion-dollar NSW Government initiative to simplify and modernise the rail network. The Mortdale to Kiama package is being…
Port Kembla Industrial
Under construction$550mby 2029
Forest Reach
Forest Reach is a masterplanned residential community at the foothills of the Illawarra Escarpment, 18 kilometres from Wollongong CBD. Acquired by AVID Property Group from Stockland in May 2025, the…
Warrawong Community Health CentreUnder construction · Health · by 2026 · Port Kembla - Warrawong
$60m
Brooks Reach Central PrecinctUnder construction · Communities · by 2027 · Horsley - Kembla Grange
$65m
Fair Views EstateUnder construction · Residential Development · by 2026 · Horsley - Kembla Grange
$50m
Warrawong Plaza RedevelopmentApproved · Communities, Precincts & Urban Renewal · by 2045 · Port Kembla - Warrawong
$1.10bn
Southern Suburbs Community Centre and LibraryUnder construction · Arts & Culture · by 2027 · Port Kembla - Warrawong
$42m
50 further projects in
Dapto - Port Kembla are not listed here.
Denotes AI-based impression for illustrative purposes only, not to be taken as
definitive under any circumstances. Please follow links and conduct other
investigations from the project’s source for actual imagery. Developers and
project owners wishing us to use original imagery please Contact
Us and we will do so.
Beyond 2030:
a further $11.7bn across
5 projects with completion dates further out — mostly precinct-scale programs whose dates are
indicative. Kept out of the chart so the years you can act on stay readable.
Estimated value of tracked projects by the year they are due to
complete, stacked by how certain they are. The dark band is money already being spent;
the pale band is still an intention. Estimates are indicative and mix infrastructure
cost with whole-of-precinct development value, so read the shape rather than the totals.
Approvals PipelineDevelopment Applications in Dapto - Port Kembla
Development applications around
Dapto - Port Kembla
Development approvals is a new addition to AreaSearch.
We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
—
In the local catchment
Est. Value
—
Where disclosed
Under Assessment
—
Awaiting determination
Determined
—
Approved or decided
Approvals pipelineStatus, location, timing and project scale
Loading development applications…
Lodged
Address
Description
Type
Distance
Status
SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.
ProfessionalPRODevelopment Map for Dapto - Port Kembla
Applications and major projects plotted where
they are actually proposed, with the
79 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage,
area and committed value. To search every application on record rather
than this sample, use the section above.
DistributionWhere Development Is Happening in Dapto - Port Kembla
Dapto - Port Kembla covers 6 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder
Each area below opens a map builder on its own page — a tool for
putting a map and a table into a report. Pick the place types you want plotted
(schools, supermarkets, medical, child care, transport and the rest of what
AreaSearch holds), add development applications as their own layer, drop your own
points, then recolour, renumber and export the result as a table or CSV.
A this area only toggle clips everything to the boundary you are looking at.
Searches are charged against your credit balance — 1 credit per 40
results from AreaSearch data — and setting filters costs nothing until
you search. The builder works on one suburb-sized area at a time, which is why it
opens per area rather than across the whole of
Dapto - Port Kembla.
Planning AuthoritiesCouncils Covering Dapto - Port Kembla
Development in Dapto - Port Kembla is assessed within the Wollongong local government area. AreaSearch publishes development
figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS
issues a separate official building-approvals series for local government areas, and totals
built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page
reconcilable with the published ABS series.
CompareNearby Development Hubs
The same view of building approvals, applications and
major projects for areas neighbouring Dapto - Port Kembla.
Data & MethodSources & Method for Dapto - Port Kembla
The four tenses, and what each one can tell you
Proposed — development applications
Collected from council planning portals. The
earliest signal available, but the least certain: many applications are amended,
withdrawn or refused, values are the applicant’s own estimate, and coverage
varies by council. This is a curated set, not the full council feed:
AreaSearch carries applications of material scale and does not track routine minor
works such as signage, fencing or small alterations, so the counts here are lower
than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than
18 months after lodgement are reported separately
and kept out of the live-queue figures: the age profile of open applications is
sharply split between a genuine queue under a year old and a long tail of records
councils never closed. Not every state publishes a cost of works — Queensland,
the Northern Territory and the ACT publish none at all — so on those pages
applications are counted rather than valued and no dollar figure is shown
rather than a partial one. Treated here as a snapshot of the current queue only —
AreaSearch does not chart application counts over time, because the history
reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from
ABS building approvals data, currently published to June 2026.
Counts dwelling units approved, not buildings and not completions. The most recent
financial year is annualised from nine months of data wherever it appears and is
labelled as such.
Building — major projects
Projects tracked individually by AreaSearch
from Infrastructure Australia, state infrastructure agencies, developer disclosures
and council records. Values are estimates and delivery dates are targets. Ranked on
this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national
address register since the 2021 Census. This is the closest available measure of what has
actually been built, though address creation can lead occupation and lags
construction. It is not a completions count.
Boundaries
Dapto - Port Kembla is Statistical Area Level 3 10701 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 6 Statistical Areas Level 2.
It has an estimated 83,582 residents, +4.7% since the 2021 Census.
Currency
Measure
Source
To
Dwelling approvals, five-year average
ABS / AreaSearch
June 2026
House share of approvals
ABS / AreaSearch
June 2026
Residents per approval
ABS / AreaSearch
June 2026
Value per approved dwelling
ABS / AreaSearch
June 2026
Commercial work approved
ABS / AreaSearch
June 2026
Verified new addresses since the Census
Address register / AreaSearch
May 2026
Development applications
Council planning portals
June 2026
Major projects
Infrastructure Australia / state agencies / AreaSearch
Ongoing
Figures on this page are read live from the
AreaSearch database each time it loads, so they update as soon as a source does.
Development in Dapto - Port Kembla — common questions
How many new dwellings were approved in Dapto - Port Kembla?
The ABS recorded 356 dwelling approvals across Dapto - Port Kembla in the 2024-25 financial year, against a five-year average of 454 a year.
How many development applications are lodged in Dapto - Port Kembla?
AreaSearch tracks 779 development applications of material scale across Dapto - Port Kembla — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 121 remain in assessment. Applications are assessed within the Wollongong local government area. The most recent application in our data was lodged in June 2026.
What major projects are planned for Dapto - Port Kembla?
AreaSearch tracks 65 current major projects in Dapto - Port Kembla, 22 of them under construction. The largest include BlueScope No. 6 Blast Furnace Reline, Rail Service Improvement Program (Mortdale to Kiama) and Forest Reach.
Which council covers Dapto - Port Kembla?
Dapto - Port Kembla is an ABS Statistical Area Level 3. It is covered by the Wollongong local government area. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.
Is Dapto - Port Kembla growing faster than the rest of New South Wales?
On development approvals, Dapto - Port Kembla is adding new dwellings more slowly than New South Wales as a whole — 0.50 approvals per 100 existing dwellings a year against the state figure of 0.59.
How current is this development data?
ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in June 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.
Development data is provided for general information.
Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and
are not independently verified by AreaSearch. Confirm anything material with the relevant council
or agency before relying on it.