Development in Upper Murray exc. Albury

NSW

Building approvals, live development applications and major projects across the Upper Murray exc. Albury statistical area — covering Federation, Murray River and Berrigan and 6 more.

SA3 10903 Rest of NSW 45,527 residents 6 statistical areas
Approved · FY25 276 dwellings approved
vs 5-yr average 251 average approvals a year
In the queue 114 live applications
Major projects 38 12 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 10903 How we calculate this

The Pipeline Development Pipeline in Upper Murray exc. Albury

1 Proposed 114 applications in assessment Leading · to June 2026 See applications ↓
2 Approved 276 dwellings approved in 2024-25, or 0.58 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 38 major projects committed or under construction, 12 of them already on site Forward · completions to 2030+ See projects ↓
4 Delivered 1,439 new addresses verified since the 2021 Census, up 6.2% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 276 dwelling approvals across Upper Murray exc. Albury. Right now, 114 development applications are before the 9 councils covering the area. AreaSearch tracks 38 major projects here that are committed or under construction, the largest being Dinawan Energy Hub at an estimated $4.30bn. On the ground, 1,439 new addresses have been verified since the 2021 Census — growth of 6.2% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Upper Murray exc. Albury

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.58 per 100 existing dwellings a year, in line with the New South Wales rate of 0.59. Development here remains overwhelmingly detached: houses account for 96% of recent approvals. The mix being approved closely matches what is already standing — 97% houses against 90% of existing homes. The average approved dwelling is valued at $500,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 251.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Upper Murray exc. Albury 0.58
New South Wales 0.59
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 90%
Approved, last 5 years 97%
Approved, latest year 96%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$147m
Residential work approved
2024-25
$54.9m
Commercial work approved
construction cost
$500,000
Average value per approved dwelling
last two years
174
Residents per approval

Supply & Demand Is Upper Murray exc. Albury Building Enough Homes?

The same approvals, measured against the population they have to house.

Upper Murray exc. Albury approves about 5.5 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 2,074 residents and 1,439 new addresses — about 1.4 extra people per home built, below the 2.5-person average household, so building has run ahead of population growth. Housing the population projected for 2041 implies roughly 137 new dwellings a year from here, which puts the recent approval rate of 251 a year comfortably ahead of what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 1.4
Average household size 2.5

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 251
Implied need to 2041 137

Implied need assumes the average household stays at today’s 2.5 people. Approvals are not completions, and not every approval is built.

ProposedLEADING · to June 2026 Development Applications in Upper Murray exc. Albury

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged. 27 of them carry an AreaSearch analyst assessment — look for the Analysed marker in the search below.

AreaSearch tracks 842 development applications of material scale lodged with councils across Upper Murray exc. Albury, the most recent in June 2026. 114 of them are still in assessment. The biggest categories in the queue by value are commercial, aged care and mixed-use. Live applications account for about 173 proposed dwellings.

Estimated value of applications by development type. This is the clearest single picture of what kind of place Upper Murray exc. Albury is being asked to become. A further 3 applications sit across 1 smaller category, too few to plot.

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

Determined 462
Approved 137
Under Assessment 73
Additional Information Requested 47
Withdrawn 28
Returned 25

32 applications are still marked under assessment but were lodged more than 18 months ago. Councils often leave determined or abandoned applications open in their feeds, so they are counted here but excluded from the live queue above.

A further 3 applications carry no status in the council feed.

By local government area

Applications on record within each council area that overlaps Upper Murray exc. Albury. This counts applications inside this statistical area only — it is not a total for the council.

Murray River 347
Federation 228
Berrigan 114
Edward River 110
Murrumbidgee 34

Recent applications in Upper Murray exc. Albury

By estimated cost of works, as lodged. Estimates are the applicant’s own figures and are not verified by AreaSearch.

Aged Care / Retirement and Multi-Unit Residential (10+) development Corowa Surrounds · Additional Information Requested · lodged Dec 2025 · 173 dwellings
$10.0m
Commercial / Office development Corowa Surrounds · Under Assessment · lodged Dec 2025
$8.4m
Commercial / Office development Tocumwal - Finley - Jerilderie · Pending Lodgement · lodged Mar 2026
$7.8m
Industrial / Warehousing development Moama · Additional Information Requested · lodged Jun 2025
$2.6m
Modification to approved service station including diesel canopy and 24/7 trading hours Deniliquin · Pending Lodgement · lodged Mar 2026
$2.0m
Large Retail Developments and Commercial / Office Tocumwal - Finley - Jerilderie · Additional Information Requested · lodged Nov 2025
$950k
Industrial / Warehousing development Moama · Under Assessment · lodged Dec 2025
$831k
Alterations and signage for existing childcare centre in Moama Moama · Under Assessment · lodged Oct 2025
$506k

BuildingFORWARD Major Projects & Infrastructure in Upper Murray exc. Albury

What is funded and moving — the projects large enough to change how Upper Murray exc. Albury works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 38 current projects across Upper Murray exc. Albury. The largest is Dinawan Energy Hub at an estimated $4.30bn, due by 2029. That breaks down as 12 under construction, 5 approved and awaiting a start and 21 still in planning. The pipeline is weighted toward energy, environmental & disaster management and residential development.
Deniliquin Solar Farm Stage 2
Under construction $850m by 2027

Deniliquin Solar Farm Stage 2

An expansion project comprising approximately 12,000 solar panels on single-axis tracking arrays. The site occupies 16.5 hectares of a farming property, designed to integrate with ongoing agricultural use…

Deniliquin Surrounds

Dinawan Energy Hub
Approved $4.30bn by 2029

Dinawan Energy Hub

The Dinawan Energy Hub is a significant hybrid renewable energy project located within the South West Renewable Energy Zone (REZ). It features the 800 MW Dinawan Solar Farm, a 1,574 MWh Battery Energy Storage…

Deniliquin Surrounds

Pottinger Energy Park
Approved $2.00bn by 2029

Pottinger Energy Park

Pottinger Energy Park is an approved large-scale renewable energy project in the NSW South West Renewable Energy Zone, jointly developed by Someva Renewables and AGL Energy. The NSW Independent Planning…

Deniliquin Surrounds

Also in the pipeline

Deniliquin Industrial Estate Under construction · Business Parks & Technology Hubs · by 2028 · Deniliquin
$125m
Yanco Creek Modernisation Project Under construction · Environmental & Disaster Management · by 2026 · Deniliquin Surrounds
$120m
Yanco Delta Wind Farm Approved · Energy · by 2030 · Tocumwal - Finley - Jerilderie
$3.45bn
Deniliquin Battery Energy Storage System (BESS) Approved · Energy · by 2027 · Deniliquin
$200m
Tchelery Wind Farm In planning · Energy · by 2029 · Deniliquin Surrounds
$1.30bn
Merino Wind Farm and Battery In planning · Energy · by 2029 · Deniliquin Surrounds
$3.50bn
Baldon Wind Farm In planning · Energy · by 2029 · Deniliquin Surrounds
$2.80bn
Conargo Wind Farm In planning · Energy · by 2029 · Deniliquin Surrounds
$450m
JBS Rivalea Corowa Grower Farm In planning · Agriculture & Rural Development · by 2030 · Corowa
$400m
Corowa Battery Energy Storage System In planning · Energy · by 2028 · Corowa
$135m
Currawarra Solar Farm Approved · Energy · Deniliquin Surrounds
$200m
Deniliquin Agricultural Research Facility In planning · Science & Research · by 2027 · Deniliquin
$95m

23 further projects in Upper Murray exc. Albury are not listed here.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Upper Murray exc. Albury

Development applications around Upper Murray exc. Albury

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
In the local catchment
Est. Value
Where disclosed
Under Assessment
Awaiting determination
Determined
Approved or decided
Approvals pipeline Status, location, timing and project scale

Loading development applications…

Lodged Address Description Type Distance Status

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Upper Murray exc. Albury

Applications and major projects plotted where they are actually proposed, with the 44 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Upper Murray exc. Albury

Upper Murray exc. Albury covers 6 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Upper Murray exc. Albury.

Tocumwal - Finley - Jerilderie area profile

No separate approvals series published
151 applications on record · 211 new addresses since 2021
Build a map

Corowa Surrounds area profile

No separate approvals series published
149 applications on record · 145 new addresses since 2021
Build a map

Deniliquin area profile

No separate approvals series published
87 applications on record · 144 new addresses since 2021
Build a map

Moama area profile

No separate approvals series published
260 applications on record · 790 new addresses since 2021
Build a map

Deniliquin Surrounds area profile

No separate approvals series published
115 applications on record · 119 new addresses since 2021
Build a map

Corowa area profile

No separate approvals series published
80 applications on record · 30 new addresses since 2021
Build a map

Planning Authorities Councils Covering Upper Murray exc. Albury

Upper Murray exc. Albury spans 9 local government areas — Federation, Murray River, Berrigan, Edward River, Murrumbidgee, Greater Hume Shire, Campaspe, Lockhart and Moira. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of Upper Murray exc. AlburyApplications on recordRegister read to
Federation 29% of residents 228 June 2026
Murray River 28% of residents 347 June 2026
Berrigan 20% of residents 114 June 2026
Edward River 19% of residents 110 June 2026
Murrumbidgee 2.6% of residents 34 June 2026
Greater Hume Shire 0.4% of residents 1 March 2026
Campaspe 0.1% of residents 5 April 2026
Lockhart 0.0% of residents Not yet collected
Moira 0.0% of residents 3 March 2026

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Upper Murray exc. Albury.

Data & Method Sources & Method for Upper Murray exc. Albury

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Upper Murray exc. Albury is Statistical Area Level 3 10903 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 6 Statistical Areas Level 2. It has an estimated 45,527 residents, +4.8% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Development applications Council planning portals June 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Upper Murray exc. Albury — common questions

How many new dwellings were approved in Upper Murray exc. Albury?

The ABS recorded 276 dwelling approvals across Upper Murray exc. Albury in the 2024-25 financial year, against a five-year average of 251 a year.

How many development applications are lodged in Upper Murray exc. Albury?

AreaSearch tracks 842 development applications of material scale across Upper Murray exc. Albury — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 114 remain in assessment. Applications are assessed within the Federation, Murray River and Berrigan local government areas. The most recent application in our data was lodged in June 2026.

What major projects are planned for Upper Murray exc. Albury?

AreaSearch tracks 38 current major projects in Upper Murray exc. Albury, 12 of them under construction. The largest include Deniliquin Solar Farm Stage 2, Dinawan Energy Hub and Pottinger Energy Park.

Which council covers Upper Murray exc. Albury?

Upper Murray exc. Albury is an ABS Statistical Area Level 3. It is covered by parts of 9 local government areas — Federation, Murray River, Berrigan, Edward River, Murrumbidgee, Greater Hume Shire, Campaspe, Lockhart and Moira. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Upper Murray exc. Albury growing faster than the rest of New South Wales?

On development approvals, Upper Murray exc. Albury is adding new dwellings at about the same rate as New South Wales as a whole — 0.58 approvals per 100 existing dwellings a year against the state figure of 0.59.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in June 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.