Development in Goldfields

WA

Building approvals, live development applications and major projects across the Goldfields statistical area — covering Kalgoorlie-Boulder, Coolgardie and Leonora and 4 more.

SA3 51103 Rest of WA 41,140 residents 5 statistical areas
Approved · FY25 58 dwellings approved
vs 5-yr average 63 average approvals a year
In the queue 3 live applications
Major projects 23 8 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 51103 How we calculate this

The Pipeline Development Pipeline in Goldfields

1 Proposed 3 applications in assessment Leading · to June 2026 See applications ↓
2 Approved 58 dwellings approved in 2024-25, or 0.16 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 23 major projects committed or under construction, 8 of them already on site Forward · completions to 2030+ See projects ↓
4 Delivered 243 new addresses verified since the 2021 Census, up 1.4% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 58 dwelling approvals across Goldfields. Right now, 3 development applications are before the 7 councils covering the area. AreaSearch tracks 23 major projects here that are committed or under construction, the largest being Goldfields Pipeline Renewal (Stage 1) at an estimated $543m. On the ground, 243 new addresses have been verified since the 2021 Census — growth of 1.4% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Goldfields

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.16 per 100 existing dwellings a year, well below the Western Australia rate of 0.80. The mix is genuinely split — 40% of recent approvals are detached houses and 60% are attached or higher-density dwellings. That is a clear shift toward density — the five-year average is 60% houses. Detached houses make up 83% of the homes already standing here but only 60% of the past five years of approvals, so the area is densifying. The average approved dwelling is valued at $414,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 63.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Goldfields 0.16
Western Australia 0.80
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 83%
Approved, last 5 years 60%
Approved, latest year 40%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$25.8m
Residential work approved
2024-25
$98.4m
Commercial work approved
construction cost
$414,000
Average value per approved dwelling
last two years
650
Residents per approval

Supply & Demand Is Goldfields Building Enough Homes?

The same approvals, measured against the population they have to house.

Goldfields approves about 1.5 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 2,873 residents but only 243 new addresses — about 11.8 extra people for every home built, against an average household of 3.1. On those numbers supply has not kept pace with growth. Housing the population projected for 2041 implies roughly 90 new dwellings a year from here, which puts the recent approval rate of 63 a year behind what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 11.8
Average household size 3.1

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 63
Implied need to 2041 90

Implied need assumes the average household stays at today’s 3.1 people. Approvals are not completions, and not every approval is built.

ProposedLEADING · to June 2026 Development Applications in Goldfields

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged.

AreaSearch tracks 20 development applications of material scale lodged with councils across Goldfields, the most recent in June 2026. 3 of them are still in assessment.
Coverage

AreaSearch reads applications directly from each council’s planning register. Goldfields is not yet covered evenly. Coolgardie (9.0% of residents) — nothing lodged since September 2022. That council is under-represented in every count and chart below.

Too few categorised applications to chart

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

Approved 12
Pending 4
historic_discovered 2
Determined 1
Refused 1

1 application is still marked under assessment but was lodged more than 18 months ago. Councils often leave determined or abandoned applications open in their feeds, so it is counted here but excluded from the live queue above.

By local government area

Applications on record within each council area that overlaps Goldfields. This counts applications inside this statistical area only — it is not a total for the council.

Kalgoorlie-Boulder 16

BuildingFORWARD Major Projects & Infrastructure in Goldfields

What is funded and moving — the projects large enough to change how Goldfields works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 23 current projects across Goldfields. The largest is Goldfields Pipeline Renewal (Stage 1) at an estimated $543m, due by 2027. That breaks down as 8 under construction, 1 approved and awaiting a start and 14 still in planning. The pipeline is weighted toward residential development, manufacturing and energy.
Goldfields Pipeline Renewal (Stage 1)
In planning $543m by 2027

Goldfields Pipeline Renewal (Stage 1)

Stage 1 of a long-term, 70-year program to renew the historic 566km Goldfields and Agricultural Water Supply Scheme (GAWSS), which was commissioned in 1903 and runs from Mundaring Weir near Perth to…

Kalgoorlie

Yilkari Industrial Park
Under construction $300m by 2050

Yilkari Industrial Park

Yilkari Industrial Park is a 130 hectare general industrial estate on the western edge of Kalgoorlie-Boulder, formerly known as Anzac Drive West. Located at the corner of Great Eastern Highway and Anzac Drive…

Kalgoorlie - North

Kalgoorlie Rail Realignment
In planning $170m by 2030

Kalgoorlie Rail Realignment

The project involves realigning the rail line through Kalgoorlie to bypass the Super Pit gold mine, remove 25 kilometers of existing track, and construct new lines connected to an intermodal hub. It aims to…

Kalgoorlie

Also in the pipeline

Lot 101 Brookman Street Redevelopment In planning · Communities, Precincts & Urban Renewal · by 2029 · Kalgoorlie
$45m
Kalgoorlie-Boulder Water Bank Project In planning · Environmental & Disaster Management · by 2030 · Kalgoorlie
$92m
KCGM 800-Bed Workers Accommodation Camp In planning · Residential Development · by 2026 · Kalgoorlie
$65m
GreenView at Karlkurla Under construction · Residential Development · Kalgoorlie - North
$7m
GreenView at Karlkurla Under construction · Communities · Kalgoorlie
$7m
North Somerville District Structure Plan In planning · Communities · Kalgoorlie
Fabric Street Temporary Workforce Accommodation In planning · Residential Development · Kalgoorlie
Lot 505 Kalgoorlie Industrial Area In planning · Business Parks & Technology Hubs · Kalgoorlie
Mungari Gold Mine Expansion Under construction · Manufacturing · Kambalda - Coolgardie - Norseman
Lynas Rare Earths Processing Facility Under construction · Manufacturing · Kambalda - Coolgardie - Norseman
GreenView at Karlkurla Under construction · Residential Development · Kalgoorlie
Outback Way Upgrade Under construction · Transport & Logistics · Leinster - Leonora

8 further projects in Goldfields are not listed here.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $300m across 1 project with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Goldfields

Development applications around Goldfields

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
In the local catchment
Est. Value
Where disclosed
Under Assessment
Awaiting determination
Determined
Approved or decided
Approvals pipeline Status, location, timing and project scale

Loading development applications…

Lodged Address Description Type Distance Status

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Goldfields

Applications and major projects plotted where they are actually proposed, with the 28 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Goldfields

Goldfields covers 5 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Goldfields.

Kalgoorlie area profile

No separate approvals series published
15 applications on record · 71 new addresses since 2021
Build a map

Kalgoorlie - North area profile

No separate approvals series published
1 application on record · 87 new addresses since 2021
Build a map

Boulder area profile

No separate approvals series published
38 new addresses since 2021
Build a map

Leinster - Leonora area profile

No separate approvals series published
2 applications on record
Build a map

Kambalda - Coolgardie - Norseman area profile

No separate approvals series published
2 applications on record · 37 new addresses since 2021
Build a map

Planning Authorities Councils Covering Goldfields

Goldfields spans 7 local government areas — Kalgoorlie-Boulder, Coolgardie, Leonora, Ngaanyatjarraku, Laverton, Dundas and Menzies. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of GoldfieldsApplications on recordRegister read to
Kalgoorlie-Boulder 77% of residents 16 June 2026
Coolgardie 9.0% of residents 1 September 2022
Leonora 4.2% of residents 2 March 2026
Ngaanyatjarraku 3.6% of residents Not yet collected
Laverton 3.5% of residents Not yet collected
Dundas 1.8% of residents 1 No dates published
Menzies 1.4% of residents Not yet collected

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Goldfields.

Data & Method Sources & Method for Goldfields

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Goldfields is Statistical Area Level 3 51103 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 5 Statistical Areas Level 2. It has an estimated 41,140 residents, +7.5% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Development applications Council planning portals June 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Goldfields — common questions

How many new dwellings were approved in Goldfields?

The ABS recorded 58 dwelling approvals across Goldfields in the 2024-25 financial year, against a five-year average of 63 a year.

How many development applications are lodged in Goldfields?

AreaSearch tracks 20 development applications of material scale across Goldfields — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 3 remain in assessment. Applications are assessed within the Kalgoorlie-Boulder, Coolgardie and Leonora local government areas. The most recent application in our data was lodged in June 2026.

What major projects are planned for Goldfields?

AreaSearch tracks 23 current major projects in Goldfields, 8 of them under construction. The largest include Goldfields Pipeline Renewal (Stage 1), Yilkari Industrial Park and Kalgoorlie Rail Realignment.

Which council covers Goldfields?

Goldfields is an ABS Statistical Area Level 3. It is covered by parts of 7 local government areas — Kalgoorlie-Boulder, Coolgardie, Leonora, Ngaanyatjarraku, Laverton, Dundas and Menzies. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Goldfields growing faster than the rest of Western Australia?

On development approvals, Goldfields is adding new dwellings more slowly than Western Australia as a whole — 0.16 approvals per 100 existing dwellings a year against the state figure of 0.80.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in June 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.