Development in Mundaring

WA

Building approvals, live development applications and major projects across the Mundaring statistical area — covering Mundaring, Swan and Kalamunda.

SA3 50402 Greater Perth 49,637 residents 5 statistical areas
Approved · FY25 364 dwellings approved
vs 5-yr average 216 average approvals a year
In the queue 18 applications on record
Major projects 4 3 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 50402 How we calculate this

The Pipeline Development Pipeline in Mundaring

1 Proposed 18 applications on record, none of them currently open Latest April 2026 See applications ↓
2 Approved 364 dwellings approved in 2024-25, or 0.59 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 4 major projects committed or under construction, 3 of them already on site Forward · completions to 2028+ See projects ↓
4 Delivered 489 new addresses verified since the 2021 Census, up 2.7% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 364 dwelling approvals across Mundaring. AreaSearch tracks 4 major projects here that are committed or under construction, the largest being Bushmead Residential Estate at an estimated $350m. On the ground, 489 new addresses have been verified since the 2021 Census — growth of 2.7% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Mundaring

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.59 per 100 existing dwellings a year, below the Western Australia rate of 0.80. Development here remains overwhelmingly detached: houses account for 93% of recent approvals. The mix being approved closely matches what is already standing — 96% houses against 95% of existing homes. The average approved dwelling is valued at $392,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 216.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Mundaring 0.59
Western Australia 0.80
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 95%
Approved, last 5 years 96%
Approved, latest year 93%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$161m
Residential work approved
2024-25
$38.2m
Commercial work approved
construction cost
$392,000
Average value per approved dwelling
last two years
183
Residents per approval

Supply & Demand Is Mundaring Building Enough Homes?

The same approvals, measured against the population they have to house.

Mundaring approves about 4.4 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 5,845 residents but only 489 new addresses — about 12.0 extra people for every home built, against an average household of 2.9. On those numbers supply has not kept pace with growth. Housing the population projected for 2041 implies roughly 153 new dwellings a year from here, which puts the recent approval rate of 216 a year comfortably ahead of what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 12.0
Average household size 2.9

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 216
Implied need to 2041 153

Implied need assumes the average household stays at today’s 2.9 people. Approvals are not completions, and not every approval is built.

ProposedLEADING · to April 2026 Development Applications in Mundaring

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged.

AreaSearch tracks 18 development applications of material scale lodged with councils across Mundaring, the most recent in April 2026. The most common types in the queue are childcare.
Coverage

AreaSearch reads applications directly from each council’s planning register. Mundaring is not yet covered evenly. Swan (12% of residents) — no applications collected from its register. That council is under-represented in every count and chart below.

Too few categorised applications to chart

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

Approved 18

By local government area

Applications on record within each council area that overlaps Mundaring. This counts applications inside this statistical area only — it is not a total for the council.

Mundaring 18

BuildingFORWARD Major Projects & Infrastructure in Mundaring

What is funded and moving — the projects large enough to change how Mundaring works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 4 current projects across Mundaring. The largest is Bushmead Residential Estate at an estimated $350m, due by 2027. That breaks down as 3 under construction and 1 still in planning. The pipeline is weighted toward residential development, communities and health.
Bushmead Residential Estate
Under construction $350m by 2027

Bushmead Residential Estate

A masterplanned residential estate of 794 lots set amongst 185 hectares of retained native bushland on the former Bushmead Rifle Range site, 16km from Perth CBD. Developed by Cedar Woods Properties, the estate…

Swan View - Greenmount - Midvale

Midland Health Campus Redevelopment (St John of God Midland Public and Private Hospitals)
Under construction $160m by 2026

Midland Health Campus Redevelopment (St John of God Midland Public and Private Hospitals)

Major reconfiguration of the Midland health precinct with two coordinated works streams. A new five-storey, 123-bed standalone private hospital is under construction on Watertank Way in the historic Midland…

Swan View - Greenmount - Midvale

The Vines Swan View
Under construction $65m by 2026

The Vines Swan View

The Vines Swan View is a boutique house and land estate by LWP Property Group, delivering about 120 residential lots on an elevated site off Marlborough Road in Swan View with views across the Swan Valley and…

Swan View - Greenmount - Midvale

Also in the pipeline

Swan View Rise In planning · Residential Development · by 2028 · Swan View - Greenmount - Midvale
$80m

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Mundaring

Development applications around Mundaring

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
In the local catchment
Est. Value
Where disclosed
Under Assessment
Awaiting determination
Determined
Approved or decided
Approvals pipeline Status, location, timing and project scale

Loading development applications…

Lodged Address Description Type Distance Status

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Mundaring

Applications and major projects plotted where they are actually proposed, with the 7 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Mundaring

Mundaring covers 5 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Mundaring.

Mundaring area profile

No separate approvals series published
9 applications on record · 78 new addresses since 2021
Build a map

Swan View - Greenmount - Midvale area profile

No separate approvals series published
6 applications on record · 285 new addresses since 2021
Build a map

Glen Forrest - Darlington area profile

No separate approvals series published
3 applications on record
Build a map

Helena Valley - Koongamia area profile

No separate approvals series published
80 new addresses since 2021
Build a map

Chidlow area profile

No separate approvals series published
31 new addresses since 2021
Build a map

Planning Authorities Councils Covering Mundaring

Mundaring spans 3 local government areas — Mundaring, Swan and Kalamunda. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of MundaringApplications on recordRegister read to
Mundaring 88% of residents 18 April 2026
Swan 12% of residents Not yet collected
Kalamunda 0.0% of residents Not yet collected

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Mundaring.

Data & Method Sources & Method for Mundaring

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Mundaring is Statistical Area Level 3 50402 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 5 Statistical Areas Level 2. It has an estimated 49,637 residents, +13.4% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Development applications Council planning portals April 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Mundaring — common questions

How many new dwellings were approved in Mundaring?

The ABS recorded 364 dwelling approvals across Mundaring in the 2024-25 financial year, against a five-year average of 216 a year.

How many development applications are lodged in Mundaring?

AreaSearch tracks 18 development applications of material scale across Mundaring — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged. Applications are assessed within the Mundaring, Swan and Kalamunda local government areas. The most recent application in our data was lodged in April 2026.

What major projects are planned for Mundaring?

AreaSearch tracks 4 current major projects in Mundaring, 3 of them under construction. The largest include Bushmead Residential Estate, Midland Health Campus Redevelopment (St John of God Midland Public and Private Hospitals) and The Vines Swan View.

Which council covers Mundaring?

Mundaring is an ABS Statistical Area Level 3. It is covered by parts of 3 local government areas — Mundaring, Swan and Kalamunda. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Mundaring growing faster than the rest of Western Australia?

On development approvals, Mundaring is adding new dwellings more slowly than Western Australia as a whole — 0.59 approvals per 100 existing dwellings a year against the state figure of 0.80.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in April 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.