Development in Wheat Belt - South

WA

Building approvals, live development applications and major projects across the Wheat Belt - South statistical area — covering Narrogin, Wagin and Boddington and 13 more.

SA3 50903 Rest of WA 20,445 residents 5 statistical areas
Approved · FY25 59 dwellings approved
vs 5-yr average 51 average approvals a year
In the queue council feed not yet covered
Major projects 23 5 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 50903 How we calculate this

The Pipeline Development Pipeline in Wheat Belt - South

1 Proposed Not yet covered council planning feeds for this area are still being added Coverage expanding
2 Approved 59 dwellings approved in 2024-25, or 0.29 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 23 major projects committed or under construction, 5 of them already on site Forward · completions to 2030+ See projects ↓
4 Delivered 226 new addresses verified since the 2021 Census, up 1.7% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 59 dwelling approvals across Wheat Belt - South. AreaSearch tracks 23 major projects here that are committed or under construction, the largest being Dardadine Wind Farm at an estimated $2.40bn. On the ground, 226 new addresses have been verified since the 2021 Census — growth of 1.7% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Wheat Belt - South

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.29 per 100 existing dwellings a year, well below the Western Australia rate of 0.80. Development here remains overwhelmingly detached: houses account for 95% of recent approvals. The mix being approved closely matches what is already standing — 92% houses against 95% of existing homes. The average approved dwelling is valued at $363,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 51.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Wheat Belt - South 0.29
Western Australia 0.80
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 95%
Approved, last 5 years 92%
Approved, latest year 95%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$23.9m
Residential work approved
2024-25
$26.3m
Commercial work approved
construction cost
$363,000
Average value per approved dwelling
last two years
344
Residents per approval

Supply & Demand Is Wheat Belt - South Building Enough Homes?

The same approvals, measured against the population they have to house.

Wheat Belt - South approves about 2.5 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 1,088 residents but only 226 new addresses — about 4.8 extra people for every home built, against an average household of 2.7. On those numbers supply has not kept pace with growth. Housing the population projected for 2041 implies roughly 45 new dwellings a year from here, which puts the recent approval rate of 51 a year about level with what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 4.8
Average household size 2.7

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 51
Implied need to 2041 45

Implied need assumes the average household stays at today’s 2.7 people. Approvals are not completions, and not every approval is built.

BuildingFORWARD Major Projects & Infrastructure in Wheat Belt - South

What is funded and moving — the projects large enough to change how Wheat Belt - South works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 23 current projects across Wheat Belt - South. The largest is Dardadine Wind Farm at an estimated $2.40bn, due by 2030. That breaks down as 5 under construction, 3 approved and awaiting a start and 15 still in planning. The pipeline is weighted toward energy, manufacturing and sports & recreation.
Narrogin Solar Farm & BESS
Approved $400m by 2029

Narrogin Solar Farm & BESS

Approved 200 MW DC solar farm with a co-located 200 MW / 800 MWh four-hour battery energy storage system on private land south of Narrogin. The project will connect to the Narrogin South Substation and export…

Narrogin

Narrogin BESS Project
Approved $400m by 2027

Narrogin BESS Project

A 200 MW / 800 MWh utility-scale battery energy storage system (BESS) designed to enhance grid stability and integrate renewable energy within the South West Interconnected System. The project spans…

Narrogin

Narrogin East Wind, Solar & BESS Project
In planning $800m by 2029

Narrogin East Wind, Solar & BESS Project

A proposed hybrid renewable energy project by Lightsource BP, comprising approximately 250 MW wind, 150 MW solar, and a 200 MW battery energy storage system (BESS). The $800M development is part of the…

Narrogin

Also in the pipeline

Narrogin Biodiesel Plant In planning · Manufacturing · by 2028 · Narrogin
$400m
Katanning Gold Project In planning · Manufacturing · by 2027 · Kulin
$355m
Bellwether Wind Farm In planning · Energy · by 2030 · Wagin
$1.50bn
Ambrosia Wind Farm In planning · Energy · by 2030 · Wagin
$1.20bn
West Arthur Wind Farm In planning · Energy · by 2030 · Wagin
$2.00bn
North Williams Wind Farm In planning · Energy · by 2030 · Wagin
$1.80bn
Narrogin Wind Farm In planning · Energy · by 2029 · Narrogin
$650m
Dardadine Wind Farm In planning · Energy · by 2030 · Wagin
$2.40bn
Kondinin Wind and Solar Project Approved · Energy · by 2028 · Kulin
Hyden Recreation Centre Extension In planning · Sports & Recreation · Kulin
$4m
Regional Road Infrastructure Upgrades Under construction · Transport & Logistics · Wagin
Darkan Swimming Pool Upgrade Under construction · Sports & Recreation · Wagin

8 further projects in Wheat Belt - South are not listed here.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

ProfessionalPRO Development Map for Wheat Belt - South

Applications and major projects plotted where they are actually proposed, with the 32 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Wheat Belt - South

Wheat Belt - South covers 5 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Wheat Belt - South.

Wagin area profile

No separate approvals series published
1 application on record · 82 new addresses since 2021
Build a map

Narrogin area profile

No separate approvals series published
2 applications on record
Build a map

Kulin area profile

No separate approvals series published
1 application on record · 27 new addresses since 2021
Build a map

Brookton area profile

No separate approvals series published
42 new addresses since 2021
Build a map

Murray area profile

No separate approvals series published
70 new addresses since 2021
Build a map

Planning Authorities Councils Covering Wheat Belt - South

Wheat Belt - South spans 16 local government areas — Narrogin, Wagin, Boddington, Lake Grace, Pingelly, Williams, Corrigin, Brookton, Cuballing, Kondinin, West Arthur, Kulin, Dumbleyung, Wickepin, Murray and Wandering. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of Wheat Belt - SouthApplications on recordRegister read to
Narrogin 24% of residents 2 June 2025
Wagin 9.1% of residents Not yet collected
Boddington 8.8% of residents Not yet collected
Lake Grace 6.5% of residents Not yet collected
Pingelly 5.3% of residents Not yet collected
Williams 5.3% of residents 1 August 2025
Corrigin 5.2% of residents Not yet collected
Brookton 4.9% of residents Not yet collected
Cuballing 4.9% of residents Not yet collected
Kondinin 4.3% of residents 1 November 2022
West Arthur 4.1% of residents Not yet collected
Kulin 4.0% of residents Not yet collected
Dumbleyung 3.6% of residents Not yet collected
Wickepin 3.5% of residents Not yet collected
Murray 3.4% of residents Not yet collected
Wandering 2.8% of residents Not yet collected

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Wheat Belt - South.

Data & Method Sources & Method for Wheat Belt - South

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Wheat Belt - South is Statistical Area Level 3 50903 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 5 Statistical Areas Level 2. It has an estimated 20,445 residents, +5.6% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Wheat Belt - South — common questions

How many new dwellings were approved in Wheat Belt - South?

The ABS recorded 59 dwelling approvals across Wheat Belt - South in the 2024-25 financial year, against a five-year average of 51 a year.

What major projects are planned for Wheat Belt - South?

AreaSearch tracks 23 current major projects in Wheat Belt - South, 5 of them under construction. The largest include Narrogin Solar Farm & BESS, Narrogin BESS Project and Narrogin East Wind, Solar & BESS Project.

Which council covers Wheat Belt - South?

Wheat Belt - South is an ABS Statistical Area Level 3. It is covered by parts of 16 local government areas — Narrogin, Wagin, Boddington, Lake Grace, Pingelly, Williams, Corrigin, Brookton, Cuballing, Kondinin, West Arthur, Kulin, Dumbleyung, Wickepin, Murray and Wandering. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Wheat Belt - South growing faster than the rest of Western Australia?

On development approvals, Wheat Belt - South is adding new dwellings more slowly than Western Australia as a whole — 0.29 approvals per 100 existing dwellings a year against the state figure of 0.80.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in August 2025. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.