Development in East Pilbara

WA

Building approvals, live development applications and major projects across the East Pilbara statistical area — covering Port Hedland and East Pilbara.

SA3 51002 Rest of WA 28,406 residents 4 statistical areas
Approved · FY25 54 dwellings approved
vs 5-yr average 38 average approvals a year
In the queue council feed not yet covered
Major projects 40 18 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 51002 How we calculate this

The Pipeline Development Pipeline in East Pilbara

1 Proposed Not yet covered council planning feeds for this area are still being added Coverage expanding
2 Approved 54 dwellings approved in 2024-25, or 0.19 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 40 major projects committed or under construction, 18 of them already on site Forward · completions to 2030+ See projects ↓
4 Delivered 123 new addresses verified since the 2021 Census, up 1.2% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 54 dwelling approvals across East Pilbara. AreaSearch tracks 40 major projects here that are committed or under construction, the largest being Port Hedland Iron Project - Stage 1 at an estimated $4.30bn. On the ground, 123 new addresses have been verified since the 2021 Census — growth of 1.2% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in East Pilbara

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.19 per 100 existing dwellings a year, well below the Western Australia rate of 0.80. Development here remains overwhelmingly detached: houses account for 100% of recent approvals. Detached houses are 99% of recent approvals against 76% of the existing stock, so new building is more suburban than what is already here. The average approved dwelling is valued at $585,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 38.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

East Pilbara 0.19
Western Australia 0.80
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 76%
Approved, last 5 years 99%
Approved, latest year 100%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$32.2m
Residential work approved
2024-25
$270m
Commercial work approved
construction cost
$585,000
Average value per approved dwelling
last two years
531
Residents per approval

Supply & Demand Is East Pilbara Building Enough Homes?

The same approvals, measured against the population they have to house.

East Pilbara approves about 1.3 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 2,963 residents but only 123 new addresses — about 24.1 extra people for every home built, against an average household of 3.9. On those numbers supply has not kept pace with growth. Housing the population projected for 2041 implies roughly 51 new dwellings a year from here, which puts the recent approval rate of 38 a year behind what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 24.1
Average household size 3.9

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 38
Implied need to 2041 51

Implied need assumes the average household stays at today’s 3.9 people. Approvals are not completions, and not every approval is built.

BuildingFORWARD Major Projects & Infrastructure in East Pilbara

What is funded and moving — the projects large enough to change how East Pilbara works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 40 current projects across East Pilbara. The largest is Port Hedland Iron Project - Stage 1 at an estimated $4.30bn, due by 2029. That breaks down as 18 under construction, 5 approved and awaiting a start and 17 still in planning. The pipeline is weighted toward energy, transport & logistics and sports & recreation.
Hope Downs 2 Iron Ore Mine
Under construction $2.40bn by 2027

Hope Downs 2 Iron Ore Mine

A 50/50 joint venture between Rio Tinto and Hancock Prospecting to develop the Hope Downs 2 and Bedded Hilltop iron ore deposits in the Pilbara. The project comprises two new above-water-table open pits with a…

East Pilbara

Western Ridge Iron Ore Project
Under construction $943m by 2027

Western Ridge Iron Ore Project

BHP's Western Ridge Crusher Project is a major brownfield development located 21km southwest of Newman. It involves the design and construction of a new 30 Mtpa primary crusher and a 12km overland conveyor…

Newman

Lumsden Point General Cargo Facility and Logistics Hub
Under construction $791m by 2027

Lumsden Point General Cargo Facility and Logistics Hub

Pilbara Ports Authority is developing a multi-user general cargo facility and logistics hub at Lumsden Point to alleviate congestion and support trade diversification. As of 2026, major milestones such as the…

Port Hedland

Also in the pipeline

Fortescue Port Hedland Operations Decarbonisation and Modernisation Under construction · Ports Marinas Fisheries & Aquaculture · by 2030 · Port Hedland
$950m
Resources Community Investment Initiative Under construction · Communities · by 2030 · East Pilbara
$750m
Hemi Gold Project Approved · Energy · by 2029 · East Pilbara
$4.20bn
Port Hedland Iron Project - Stage 1 Approved · Manufacturing · by 2029 · East Pilbara
$4.30bn
South Hedland Integrated Sports Hub Under construction · Sports & Recreation · by 2028 · South Hedland
$220m
WA Regional Digital Connectivity Program (WARDCP) Under construction · Telecommunications · by 2028 · East Pilbara
$193m
Pilbara Energy Transmission and Storage Infrastructure In planning · Energy · by 2026 · East Pilbara
$3.00bn
Great Northern Highway Overtaking Lanes Newman-Port Hedland Under construction · Transport & Logistics · by 2026 · East Pilbara
$65m
South Hedland Town Centre Revitalisation Under construction · Precincts & Urban Renewal · by 2026 · South Hedland
$50m
Newman Horizons Residential Estate Under construction · Residential Development · by 2026 · Newman
$50m
Western Edge In planning · Communities, Precincts & Urban Renewal · by 2032 · South Hedland
$1.50bn
Pilbara Clean Fuels Bunkering Hub In planning · Ports, Marinas, Fisheries & Aquaculture · by 2030 · Port Hedland
$1.70bn

25 further projects in East Pilbara are not listed here.

Combined values on this page exclude 1 whole-of-state program that reaches this area but are not local to it, and 1 record that appear to be separate stages of a project already counted. Both are still listed above with their own values.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $1.60bn across 2 projects with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

ProfessionalPRO Development Map for East Pilbara

Applications and major projects plotted where they are actually proposed, with the 58 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in East Pilbara

East Pilbara covers 4 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of East Pilbara.

South Hedland area profile

No separate approvals series published
10 applications on record · 30 new addresses since 2021
Build a map

East Pilbara area profile

No separate approvals series published
Build a map

Newman area profile

No separate approvals series published
Build a map

Port Hedland area profile

No separate approvals series published
1 application on record · 92 new addresses since 2021
Build a map

Planning Authorities Councils Covering East Pilbara

East Pilbara spans 2 local government areas — Port Hedland and East Pilbara. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of East PilbaraApplications on recordRegister read to
Port Hedland 62% of residents 11 November 2025
East Pilbara 38% of residents Not yet collected

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring East Pilbara.

Data & Method Sources & Method for East Pilbara

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

East Pilbara is Statistical Area Level 3 51002 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 4 Statistical Areas Level 2. It has an estimated 28,406 residents, +11.7% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in East Pilbara — common questions

How many new dwellings were approved in East Pilbara?

The ABS recorded 54 dwelling approvals across East Pilbara in the 2024-25 financial year, against a five-year average of 38 a year.

What major projects are planned for East Pilbara?

AreaSearch tracks 40 current major projects in East Pilbara, 18 of them under construction. The largest include Hope Downs 2 Iron Ore Mine, Western Ridge Iron Ore Project and Lumsden Point General Cargo Facility and Logistics Hub.

Which council covers East Pilbara?

East Pilbara is an ABS Statistical Area Level 3. It is covered by parts of 2 local government areas — Port Hedland and East Pilbara. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is East Pilbara growing faster than the rest of Western Australia?

On development approvals, East Pilbara is adding new dwellings more slowly than Western Australia as a whole — 0.19 approvals per 100 existing dwellings a year against the state figure of 0.80.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in November 2025. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.