Development in Gascoyne

WA

Building approvals, live development applications and major projects across the Gascoyne statistical area — covering Carnarvon, Exmouth and Shark Bay and 1 more.

SA3 51102 Rest of WA 10,739 residents 2 statistical areas
Approved · FY25 45 dwellings approved
vs 5-yr average 59 average approvals a year
In the queue council feed not yet covered
Major projects 5 3 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 51102 How we calculate this

The Pipeline Development Pipeline in Gascoyne

1 Proposed Not yet covered council planning feeds for this area are still being added Coverage expanding
2 Approved 45 dwellings approved in 2024-25, or 0.59 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 5 major projects committed or under construction, 3 of them already on site Forward · completions to 2028+ See projects ↓
4 Delivered 153 new addresses verified since the 2021 Census, up 3.2% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 45 dwelling approvals across Gascoyne. AreaSearch tracks 5 major projects here that are committed or under construction, the largest being Sundrift Estate (Exmouth Marina) at an estimated $70m. On the ground, 153 new addresses have been verified since the 2021 Census — growth of 3.2% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Gascoyne

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.59 per 100 existing dwellings a year, below the Western Australia rate of 0.80. The mix is genuinely split — 65% of recent approvals are detached houses and 35% are attached or higher-density dwellings. The mix being approved closely matches what is already standing — 71% houses against 77% of existing homes. The average approved dwelling is valued at $513,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 59.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Gascoyne 0.59
Western Australia 0.80
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 77%
Approved, last 5 years 71%
Approved, latest year 65%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$35.2m
Residential work approved
2024-25
$48.1m
Commercial work approved
construction cost
$513,000
Average value per approved dwelling
last two years
184
Residents per approval

Supply & Demand Is Gascoyne Building Enough Homes?

The same approvals, measured against the population they have to house.

Gascoyne approves about 5.5 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 1,202 residents but only 153 new addresses — about 7.9 extra people for every home built, against an average household of 2.9. On those numbers supply has not kept pace with growth. Housing the population projected for 2041 implies roughly 30 new dwellings a year from here, which puts the recent approval rate of 59 a year comfortably ahead of what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 7.9
Average household size 2.9

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 59
Implied need to 2041 30

Implied need assumes the average household stays at today’s 2.9 people. Approvals are not completions, and not every approval is built.

BuildingFORWARD Major Projects & Infrastructure in Gascoyne

What is funded and moving — the projects large enough to change how Gascoyne works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 5 current projects across Gascoyne. The largest is Sundrift Estate (Exmouth Marina) at an estimated $70m, due by 2028. That breaks down as 3 under construction, 1 approved and awaiting a start and 1 still in planning. The pipeline is weighted toward residential development, communities and energy.
Sundrift Estate (Exmouth Marina)
Under construction $70m by 2028

Sundrift Estate (Exmouth Marina)

Sundrift Estate is a staged masterplanned residential and commercial community on the final 17.9-hectare super lot (Lot 9510) of the Exmouth Marina precinct in Western Australia. Owned and developed by Fowler…

Exmouth

Sundrift Estate - Exmouth Marina Land Release
Under construction $70m by 2028

Sundrift Estate - Exmouth Marina Land Release

Sundrift Estate is the final stage development at Exmouth Marina precinct, delivering up to 158 residential lots plus 15 commercial lots across 18 hectares of State-owned land. The $70 million project includes…

Exmouth

Learmonth And Curtin Raaf Upgrades
Under construction

Learmonth And Curtin Raaf Upgrades

The project includes the upgrade and maintenance of the Learmonth and Curtin RAAF bases in Western Australia, encompassing infrastructure, pavement, stormwater drainage, and lighting improvements across three…

Exmouth

Also in the pipeline

Shire of Carnarvon Local Planning Scheme 13 Amendment 6 Approved · Agriculture & Rural Development · Carnarvon
HyEnergy Green Hydrogen and Ammonia Project In planning · Energy · Carnarvon

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

ProfessionalPRO Development Map for Gascoyne

Applications and major projects plotted where they are actually proposed, with the 5 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Gascoyne

Gascoyne covers 2 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Gascoyne.

Carnarvon area profile

No separate approvals series published
2 applications on record · 47 new addresses since 2021
Build a map

Exmouth area profile

No separate approvals series published
2 applications on record · 106 new addresses since 2021
Build a map

Planning Authorities Councils Covering Gascoyne

Gascoyne spans 4 local government areas — Carnarvon, Exmouth, Shark Bay and Upper Gascoyne. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of GascoyneApplications on recordRegister read to
Carnarvon 55% of residents 2 January 2024
Exmouth 32% of residents 2 May 2026
Shark Bay 11% of residents Not yet collected
Upper Gascoyne 1.7% of residents Not yet collected

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Gascoyne.

Data & Method Sources & Method for Gascoyne

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Gascoyne is Statistical Area Level 3 51102 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 2 Statistical Areas Level 2. It has an estimated 10,739 residents, +12.6% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Gascoyne — common questions

How many new dwellings were approved in Gascoyne?

The ABS recorded 45 dwelling approvals across Gascoyne in the 2024-25 financial year, against a five-year average of 59 a year.

What major projects are planned for Gascoyne?

AreaSearch tracks 5 current major projects in Gascoyne, 3 of them under construction. The largest include Sundrift Estate (Exmouth Marina), Sundrift Estate - Exmouth Marina Land Release and Learmonth And Curtin Raaf Upgrades.

Which council covers Gascoyne?

Gascoyne is an ABS Statistical Area Level 3. It is covered by parts of 4 local government areas — Carnarvon, Exmouth, Shark Bay and Upper Gascoyne. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Gascoyne growing faster than the rest of Western Australia?

On development approvals, Gascoyne is adding new dwellings more slowly than Western Australia as a whole — 0.59 approvals per 100 existing dwellings a year against the state figure of 0.80.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in May 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.