Development in Murray and Mallee

SA

Building approvals, live development applications and major projects across the Murray and Mallee statistical area — covering Murray Bridge, Loxton Waikerie and Berri Barmera and 5 more.

SA3 40703 Rest of SA 75,917 residents 12 statistical areas
Approved · FY25 578 dwellings approved
vs 5-yr average 457 average approvals a year
In the queue 327 live applications
Major projects 17 8 already under construction
Data Sources ABSCouncil planning portals ABS to August 2026 · Refreshed ABS QuickStats SA3 40703 How we calculate this

The Pipeline Development Pipeline in Murray and Mallee

1 Proposed 327 applications in assessment Leading · to July 2026 See applications ↓
2 Approved 578 dwellings approved in 2025-26, or 0.75 per 100 existing dwellings a year Official · ABS to August 2026 See approvals ↓
3 Building 17 major projects committed or under construction, 8 of them already on site Forward · completions to 2028+ See projects ↓
4 Delivered 2,190 new addresses verified since the 2021 Census, up 4.8% on the existing base Actual · to August 2026 Where it landed ↓
In the 2025-26 financial year the ABS recorded 578 dwelling approvals across Murray and Mallee. Right now, 327 development applications are before the 8 councils covering the area. AreaSearch tracks 17 major projects here that are committed or under construction, the largest being Gifford Hill at an estimated $7.50bn. On the ground, 2,190 new addresses have been verified since the 2021 Census — growth of 4.8% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Murray and Mallee

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.75 per 100 existing dwellings a year, in line with the South Australia rate of 0.78. Development here remains overwhelmingly detached: houses account for 93% of recent approvals. The mix being approved closely matches what is already standing — 94% houses against 90% of existing homes. The average approved dwelling is valued at $348,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 457.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Murray and Mallee 0.75
South Australia 0.78
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 90%
Approved, last 5 years 94%
Approved, latest year 93%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2023
2024
2025
2026
2025-26
$215m
Residential work approved
2025-26
$605m
Commercial work approved
construction cost
$348,000
Average value per approved dwelling
last two years
133
Residents per approval

Supply & Demand Is Murray and Mallee Building Enough Homes?

The same approvals, measured against the population they have to house.

Murray and Mallee approves about 6.0 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 4,658 residents and 2,190 new addresses, roughly one new home per 2.1 extra residents — broadly in step with an average household of 2.5. Housing the population projected for 2041 implies roughly 172 new dwellings a year from here, which puts the recent approval rate of 457 a year comfortably ahead of what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 2.1
Average household size 2.5

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 457
Implied need to 2041 172

Implied need assumes the average household stays at today’s 2.5 people. Approvals are not completions, and not every approval is built.

ProposedLEADING · to July 2026 Development Applications in Murray and Mallee

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged. 74 of them carry an AreaSearch analyst assessment — look for the Analysed marker in the search below.

AreaSearch tracks 1,468 development applications of material scale lodged with councils across Murray and Mallee, the most recent in July 2026. 327 of them are still in assessment. The most common types in the queue are industrial, multi-residential and commercial. Live applications account for about 175 proposed dwellings.

Number of applications by development type. This is the clearest single picture of what kind of place Murray and Mallee is being asked to become. Councils in South Australia do not publish an estimated cost of works in their planning feeds, so applications here are counted rather than valued. A further 19 applications sit across 3 smaller categories, too few to plot.

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

Decision Made 1,000
Under Assessment 456

129 applications are still marked under assessment but were lodged more than 18 months ago. Councils often leave determined or abandoned applications open in their feeds, so they are counted here but excluded from the live queue above.

A further 12 applications carry no status in the council feed.

By local government area

Applications on record within each council area that overlaps Murray and Mallee. This counts applications inside this statistical area only — it is not a total for the council.

Murray Bridge 397
Loxton Waikerie 252
Mid Murray 229
Renmark Paringa 175
Berri Barmera 173

Recent applications in Murray and Mallee

By the number of dwellings proposed, as lodged. Figures are the applicant’s own and are not verified by AreaSearch.

Residential park with 154 group dwellings, community clubhouse, and associated facilities. Mannum · Under Assessment · lodged Jul 2026
154 dwellings
Single storey semi-detached building comprising two dwellings with fencing and retaining walls Mannum · Under Assessment · lodged Jun 2026
2 dwellings
Two single-storey dwellings and associated fencing/retaining walls Berri · Under Assessment · lodged Apr 2026
2 dwellings
Construction of a detached dwelling and outbuilding Renmark · Under Assessment · lodged Jun 2026
1 dwellings
Single-level group dwelling at Site 122 Renmark · Under Assessment · lodged Jun 2026
1 dwellings
Construction of a single-storey group dwelling with a garage Mannum · Under Assessment · lodged Jun 2026
1 dwellings
Single storey detached dwelling Renmark Surrounds · Under Assessment · lodged Jun 2026
1 dwellings
Construction of a single-storey detached dwelling with a UMR garage Loxton · Under Assessment · lodged Jun 2026
1 dwellings

BuildingFORWARD Major Projects & Infrastructure in Murray and Mallee

What is funded and moving — the projects large enough to change how Murray and Mallee works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 17 current projects across Murray and Mallee. The largest is Gifford Hill at an estimated $7.50bn. That breaks down as 8 under construction, 2 approved and awaiting a start and 7 still in planning. The pipeline is weighted toward communities, precincts & urban renewal, transport & logistics and sports & recreation.
Gifford Hill
Under construction $7.50bn

Gifford Hill

Gifford Hill is South Australia's largest masterplanned community, planned across 1,860 hectares at Murray Bridge. The precinct is intended to become a second city for South Australia, with about 17,100…

Murray Bridge Surrounds

Gifford Hill
Approved $7.50bn

Gifford Hill

Gifford Hill is a 1,860-hectare masterplanned community on rural land south of Murray Bridge, designed as South Australia's second city. The $7.5 billion precinct will deliver 17,100 dwellings ranging from…

Murray Bridge Surrounds

Sturt Reserve Master Plan
Under construction $34m by 2028

Sturt Reserve Master Plan

A long term riverfront transformation of Sturt Reserve in Murray Bridge into a premier regional destination on Ngarrindjeri Country. The master plan, prepared by ASPECT Studios with TERROIR and Mulloway…

Murray Bridge

Also in the pipeline

Mannum Waters Residential Marina Under construction · Residential Development · by 2040 · Mannum
$175m
High Productivity Vehicle Network (HPVN) In planning · Transport & Logistics · Mannum
$1.05bn
Loxton District Children's Centre Expansion (Woodleigh) Under construction · Education & Training · by 2026 · Loxton
$10m
Murray Bridge Residential Growth Areas Approved · Residential Development · by 2032 · Murray Bridge
$50m
Billiatt Road Reconstruction - Final Stage Under construction · Transport & Logistics · by 2026 · Loxton Surrounds
$1m
Bruno Bay Infrastructure Upgrade In planning · Ports, Marinas, Fisheries & Aquaculture · by 2026 · Barmera
Loxton Swimming Pool Upgrade In planning · Sports & Recreation · Loxton
$5m
Barmera Jetty Redevelopment In planning · Communities · Renmark Surrounds
$4m
Pocket Galleries in Loxton In planning · Arts & Culture · by 2026 · Loxton
Big Orange Redevelopment Under construction · Tourism · by 2025 · Barmera
$2m
Summerfield Battery Under construction · Energy · Murray Bridge
William Street Staircase Repair Under construction · Communities · by 2025 · Loxton

2 further projects in Murray and Mallee are not listed here.

Combined values on this page exclude 1 record that appear to be separate stages of a project already counted. Both are still listed above with their own values.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $225m across 2 projects with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Murray and Mallee

Development applications around Murray and Mallee

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
—
In the local catchment
Est. Value
—
Where disclosed
Under Assessment
—
Awaiting determination
Determined
—
Approved or decided
Approvals pipeline Status, location, timing and project scale

Loading development applications…

Lodged Address Description Type Distance Status

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Murray and Mallee

Applications and major projects plotted where they are actually proposed, with the 35 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Murray and Mallee

Murray and Mallee covers 12 statistical areas, and development is not spread evenly between them. Murray Bridge alone accounted for 41% of the area’s dwelling approvals in 2025-26. The top three between them took 71% of the total.

Dwelling approvals each financial year, split by the statistical area they fell in. Each column totals the whole Murray and Mallee figure from the approvals chart above — SA2s nest exactly inside an SA3, so the two always reconcile. Tap or click an area in the legend to hide it and compare the rest. The smallest 7 areas are grouped as one band.

Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Murray and Mallee.

Murray Bridge area profile

235 approvals in 2025-26
41% of the area total · 292 applications on record · 795 new addresses since 2021
Build a map

Mannum area profile

111 approvals in 2025-26
19% of the area total · 167 applications on record · 295 new addresses since 2021
Build a map

Waikerie area profile

63 approvals in 2025-26
11% of the area total · 145 applications on record · 178 new addresses since 2021
Build a map

Renmark Surrounds area profile

35 approvals in 2025-26
6% of the area total · 90 applications on record · 134 new addresses since 2021
Build a map

The Coorong area profile

31 approvals in 2025-26
5% of the area total · 161 applications on record · 79 new addresses since 2021
Build a map

Renmark area profile

26 approvals in 2025-26
4% of the area total · 87 applications on record · 157 new addresses since 2021
Build a map

Murray Bridge Surrounds area profile

22 approvals in 2025-26
4% of the area total · 111 applications on record · 240 new addresses since 2021
Build a map

Loxton area profile

18 approvals in 2025-26
3% of the area total · 122 applications on record · 74 new addresses since 2021
Build a map

Berri area profile

12 approvals in 2025-26
2% of the area total · 71 applications on record · 49 new addresses since 2021
Build a map

Barmera area profile

11 approvals in 2025-26
2% of the area total · 104 applications on record · 66 new addresses since 2021
Build a map

Karoonda - Lameroo area profile

11 approvals in 2025-26
2% of the area total · 81 applications on record · 52 new addresses since 2021
Build a map

Loxton Surrounds area profile

3 approvals in 2025-26
1% of the area total · 37 applications on record · 71 new addresses since 2021
Build a map

Planning Authorities Councils Covering Murray and Mallee

Murray and Mallee spans 8 local government areas — Murray Bridge, Loxton Waikerie, Berri Barmera, Renmark Paringa, Mid Murray, Coorong, Southern Mallee and Karoonda East Murray. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of Murray and MalleeApplications on recordRegister read to
Murray Bridge 30% of residents 384 July 2026
Loxton Waikerie 16% of residents 244 July 2026
Berri Barmera 15% of residents 173 July 2026
Renmark Paringa 14% of residents 170 July 2026
Mid Murray 13% of residents 225 July 2026
Coorong 7.7% of residents 160 July 2026
Southern Mallee 2.8% of residents 60 March 2026
Karoonda East Murray 1.4% of residents 20 July 2026

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Murray and Mallee.

Data & Method Sources & Method for Murray and Mallee

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to August 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Murray and Mallee is Statistical Area Level 3 40703 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 12 Statistical Areas Level 2. It has an estimated 75,917 residents, +6.5% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch July 2026
House share of approvals ABS / AreaSearch July 2026
Residents per approval ABS / AreaSearch July 2026
Value per approved dwelling ABS / AreaSearch July 2026
Commercial work approved ABS / AreaSearch July 2026
Verified new addresses since the Census Address register / AreaSearch August 2026
Development applications Council planning portals July 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Murray and Mallee — common questions

How many new dwellings were approved in Murray and Mallee?

The ABS recorded 578 dwelling approvals across Murray and Mallee in the 2025-26 financial year, against a five-year average of 457 a year.

How many development applications are lodged in Murray and Mallee?

AreaSearch tracks 1,468 development applications of material scale across Murray and Mallee — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 327 remain in assessment. Applications are assessed within the Murray Bridge, Loxton Waikerie and Berri Barmera local government areas. The most recent application in our data was lodged in July 2026.

What major projects are planned for Murray and Mallee?

AreaSearch tracks 17 current major projects in Murray and Mallee, 8 of them under construction. The largest include Gifford Hill, Gifford Hill and Sturt Reserve Master Plan.

Which council covers Murray and Mallee?

Murray and Mallee is an ABS Statistical Area Level 3. It is covered by parts of 8 local government areas — Murray Bridge, Loxton Waikerie, Berri Barmera, Renmark Paringa, Mid Murray, Coorong, Southern Mallee and Karoonda East Murray. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Murray and Mallee growing faster than the rest of South Australia?

On development approvals, Murray and Mallee is adding new dwellings at about the same rate as South Australia as a whole — 0.75 approvals per 100 existing dwellings a year against the state figure of 0.78.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to August 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in July 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.