1 ProposedNot yet coveredcouncil planning feeds for this area are still being addedCoverage expanding
2 Approved419dwellings approved in 2025-26, or 0.83 per 100 existing dwellings a yearOfficial · ABS to August 2026See approvals ↓
3 Building16major projects committed or under construction, 8 of them already on siteForward · completions to 2030+See projects ↓
4 Delivered1,691new addresses verified since the 2021 Census, up 6.7% on the existing baseActual · to August 2026Where it landed ↓
In the 2025-26 financial year the ABS recorded 419 dwelling approvals across Maryborough. AreaSearch tracks 16 major projects here that are committed or under construction, the largest being Queensland Train Manufacturing Program at an estimated $9.50bn. On the ground, 1,691 new addresses have been verified since the 2021 Census — growth of 6.7% on the existing address base.
These four figures are deliberately not added together. An application, an
approval and a project under construction are often the same building at three points in its life,
measured by three different bodies with three different lags. Read them as a sequence, not a total.
ApprovedBuilding Approvals in Maryborough
What councils and certifiers have formally
permitted — the ABS series, published about four months in arrears.
Approvals are running at 0.83 per 100 existing dwellings a year, in line with the Queensland rate of 0.77. Development here remains overwhelmingly detached: houses account for 80% of recent approvals. The mix being approved closely matches what is already standing — 87% houses against 92% of existing homes. The average approved dwelling is valued at $383,000 in construction cost.
For its size, Maryborough is adding 0.83 dwellings a year per 100 existing homes — in line with the Queensland rate of 0.77 and the national rate of 0.71. That is about 6.4 approvals a year for every 1,000 residents. Building intensity has risen by about 29% across the published series.
Measured against people rather than housing stock, Maryborough is approving 8.09 dwellings a year per 1,000 residents — in line with the Queensland rate of 8.54. The two rate views differ by household size, which here averages 2.5 people per home. Housing the projection to 2041 would need about 1.95 per 1,000 residents a year.
Dwelling approvals a year per 100 existing
homes, with Queensland and Australia for comparison. This is the
same activity as the totals view, divided by the size of the area — which is the only
fair way to compare a large SA3 with a small one.
Dwelling approvals a year per 1,000
residents, each year divided by that year’s estimated resident
population (ABS ERP at 30 June), not by today’s — which matters most in fast-growing
areas, where a fixed denominator can understate the early years by half. The most recent periods use the latest published ERP, as the population series runs a year behind approvals. Read it alongside the per-100-homes view: the two differ wherever household size does.
Dwelling units approved each financial year. The dashed line is the five-year average of 335.
How intensively is it building?
Dwelling approvals a year per 100 existing dwellings.
Maryborough0.83
Queensland0.77
Australia0.71
What is here, and what is coming
Detached houses as a share of existing homes,
against the share of recent approvals.
Existing homes (2021 Census)92%
Approved, last 5 years87%
Approved, latest year80%
Detached housesApartments, townhouses & other
Approvals mix by year
Share of each year’s approvals.
2023
2024
2025
2026
2025-26
$175m
Residential work approved
2025-26
$156m
Commercial work approved
construction cost
$383,000
Average value per approved dwelling
last two years
120
Residents per approval
Supply & DemandIs Maryborough Building Enough Homes?
The same approvals, measured against the population
they have to house.
Maryborough approves about 6.4 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 4,537 residents and 1,691 new addresses, roughly one new home per 2.7 extra residents — broadly in step with an average household of 2.5. Housing the population projected for 2041 implies roughly 102 new dwellings a year from here, which puts the recent approval rate of 335 a year comfortably ahead of what the projection needs.
Growth against supply since the Census
People added for every new address verified,
against the size of an average local household.
People added per new home2.7
Average household size2.5
A bar longer than the household average means
the area gained more residents than its new housing could hold, and the extra had to be
absorbed by existing homes.
Approval rate against projected need
Dwellings a year: what is currently being
approved, against what the 2041 population projection implies.
Approved (5-yr average)335
Implied need to 2041102
Implied need assumes the average household stays
at today’s 2.5 people. Approvals are not
completions, and not every approval is built.
BuildingFORWARDMajor Projects & Infrastructure in Maryborough
What is funded and moving — the projects large enough
to change how Maryborough works, ranked by committed value and how close
they are to delivery.
AreaSearch tracks 16 current projects across Maryborough. The largest is Queensland Train Manufacturing Program at an estimated $9.50bn, due by 2032. That breaks down as 8 under construction, 1 approved and awaiting a start and 7 still in planning. The pipeline is weighted toward residential development, transport & logistics and energy.
Under construction$9.00bnby 2032
Bruce Highway Targeted Safety Program - Wide Bay Burnett
The Bruce Highway Targeted Safety Program delivers safety upgrades across sections in the Wide Bay Burnett district. Works include wide centre line treatments, safety barriers, intersection improvements, and…
Queensland Government program to deliver 65 new six-car passenger trains for the South East Queensland network, supported by a purpose-built train manufacturing facility at Torbanlea and a 66ha maintenance and…
The Queensland Train Manufacturing Program (QTMP) is delivering 65 new six-car passenger trains for the South East Queensland rail network. Trains will be built at a purpose-built 130-hectare manufacturing…
1 further project in
Maryborough are not listed here.
Combined values on this page exclude
1 record that appear to be
separate stages of a project already counted. Both are still listed
above with their own values.
Denotes AI-based impression for illustrative purposes only, not to be taken as
definitive under any circumstances. Please follow links and conduct other
investigations from the project’s source for actual imagery. Developers and
project owners wishing us to use original imagery please Contact
Us and we will do so.
Beyond 2030:
a further $18.5bn across
2 projects with completion dates further out — mostly precinct-scale programs whose dates are
indicative. Kept out of the chart so the years you can act on stay readable.
Estimated value of tracked projects by the year they are due to
complete, stacked by how certain they are. The dark band is money already being spent;
the pale band is still an intention. Estimates are indicative and mix infrastructure
cost with whole-of-precinct development value, so read the shape rather than the totals.
ProfessionalPRODevelopment Map for Maryborough
Applications and major projects plotted where
they are actually proposed, with the
23 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage,
area and committed value. To search every application on record rather
than this sample, use the section above.
DistributionWhere Development Is Happening in Maryborough
Maryborough covers 5 statistical areas, and development is not spread evenly between them. Burrum - Fraser alone accounted for 56% of the area’s dwelling approvals in 2025-26. The top three between them took 89% of the total.
Approvals per 100 existing homes in
2025-26, by statistical area, with the Maryborough figure marked. Ranked
rather than stacked: rates cannot be added together.
Approvals per 1,000 residents in 2025-26,
by statistical area, against each area’s own estimated resident population, with the
Maryborough figure marked. A small area building hard is invisible in
the totals view and obvious here.
Dwelling approvals each financial year, split by the statistical area they
fell in. Each column totals the whole Maryborough figure from the
approvals chart above — SA2s nest exactly inside an SA3, so the two always reconcile.
Tap or click an area in the legend to hide it and compare the rest.
Map builder
Each area below opens a map builder on its own page — a tool for
putting a map and a table into a report. Pick the place types you want plotted
(schools, supermarkets, medical, child care, transport and the rest of what
AreaSearch holds), add development applications as their own layer, drop your own
points, then recolour, renumber and export the result as a table or CSV.
A this area only toggle clips everything to the boundary you are looking at.
Searches are charged against your credit balance — 1 credit per 40
results from AreaSearch data — and setting filters costs nothing until
you search. The builder works on one suburb-sized area at a time, which is why it
opens per area rather than across the whole of
Maryborough.
Maryborough spans 2 local government areas — Fraser Coast and Gympie. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development
figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS
issues a separate official building-approvals series for local government areas, and totals
built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page
reconcilable with the published ABS series.
Local government area
Share of Maryborough
Applications on record
Register read to
Fraser Coast
100% of residents
3
September 2026
Gympie
0.2% of residents
—
Not yet collected
CompareNearby Development Hubs
The same view of building approvals, applications and
major projects for areas neighbouring Maryborough.
Collected from council planning portals. The
earliest signal available, but the least certain: many applications are amended,
withdrawn or refused, values are the applicant’s own estimate, and coverage
varies by council. This is a curated set, not the full council feed:
AreaSearch carries applications of material scale and does not track routine minor
works such as signage, fencing or small alterations, so the counts here are lower
than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than
18 months after lodgement are reported separately
and kept out of the live-queue figures: the age profile of open applications is
sharply split between a genuine queue under a year old and a long tail of records
councils never closed. Not every state publishes a cost of works — Queensland,
the Northern Territory and the ACT publish none at all — so on those pages
applications are counted rather than valued and no dollar figure is shown
rather than a partial one. Treated here as a snapshot of the current queue only —
AreaSearch does not chart application counts over time, because the history
reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from
ABS building approvals data, currently published to August 2026.
Counts dwelling units approved, not buildings and not completions. The most recent
financial year is annualised from nine months of data wherever it appears and is
labelled as such.
Building — major projects
Projects tracked individually by AreaSearch
from Infrastructure Australia, state infrastructure agencies, developer disclosures
and council records. Values are estimates and delivery dates are targets. Ranked on
this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national
address register since the 2021 Census. This is the closest available measure of what has
actually been built, though address creation can lead occupation and lags
construction. It is not a completions count.
Boundaries
Maryborough is Statistical Area Level 3 31905 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 5 Statistical Areas Level 2.
It has an estimated 52,166 residents, +9.5% since the 2021 Census.
Currency
Measure
Source
To
Dwelling approvals, five-year average
ABS / AreaSearch
July 2026
House share of approvals
ABS / AreaSearch
July 2026
Residents per approval
ABS / AreaSearch
July 2026
Value per approved dwelling
ABS / AreaSearch
July 2026
Commercial work approved
ABS / AreaSearch
July 2026
Verified new addresses since the Census
Address register / AreaSearch
August 2026
Major projects
Infrastructure Australia / state agencies / AreaSearch
Ongoing
Figures on this page are read live from the
AreaSearch database each time it loads, so they update as soon as a source does.
Development in Maryborough — common questions
How many new dwellings were approved in Maryborough?
The ABS recorded 419 dwelling approvals across Maryborough in the 2025-26 financial year, against a five-year average of 335 a year.
What major projects are planned for Maryborough?
AreaSearch tracks 16 current major projects in Maryborough, 8 of them under construction. The largest include Bruce Highway Targeted Safety Program - Wide Bay Burnett, Queensland Train Manufacturing Program and Queensland Train Manufacturing Program.
Which council covers Maryborough?
Maryborough is an ABS Statistical Area Level 3. It is covered by parts of 2 local government areas — Fraser Coast and Gympie. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.
Is Maryborough growing faster than the rest of Queensland?
On development approvals, Maryborough is adding new dwellings at about the same rate as Queensland as a whole — 0.83 approvals per 100 existing dwellings a year against the state figure of 0.77.
How current is this development data?
ABS building approvals are published with a lag of roughly four months; this page carries the series to August 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in September 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.
Development data is provided for general information.
Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and
are not independently verified by AreaSearch. Confirm anything material with the relevant council
or agency before relying on it.