Development in Keilor

VIC

Building approvals, live development applications and major projects across the Keilor statistical area — covering Moonee Valley, Brimbank and Hume.

SA3 21001 Greater Melbourne 64,716 residents 6 statistical areas
Approved · FY25 458 dwellings approved
vs 5-yr average 434 average approvals a year
In the queue 1,230 applications on record
Major projects 20 9 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 21001 How we calculate this

The Pipeline Development Pipeline in Keilor

1 Proposed 1,230 applications on record, though this council feed does not publish assessment status Latest May 2026 See applications ↓
2 Approved 458 dwellings approved in 2024-25, or 0.61 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 20 major projects committed or under construction, 9 of them already on site Forward · completions to 2028+ See projects ↓
4 Delivered 474 new addresses verified since the 2021 Census, up 1.8% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 458 dwelling approvals across Keilor. AreaSearch tracks 20 major projects here that are committed or under construction, the largest being M80 Ring Road Upgrade at an estimated $2.00bn. On the ground, 474 new addresses have been verified since the 2021 Census — growth of 1.8% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Keilor

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.61 per 100 existing dwellings a year, below the Victoria rate of 0.80. The mix is genuinely split — 45% of recent approvals are detached houses and 55% are attached or higher-density dwellings. Detached houses make up 76% of the homes already standing here but only 39% of the past five years of approvals, so the area is densifying. The average approved dwelling is valued at $586,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 434.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Keilor 0.61
Victoria 0.80
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 76%
Approved, last 5 years 39%
Approved, latest year 45%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$309m
Residential work approved
2024-25
$127m
Commercial work approved
construction cost
$586,000
Average value per approved dwelling
last two years
170
Residents per approval

Supply & Demand Is Keilor Building Enough Homes?

The same approvals, measured against the population they have to house.

Keilor approves about 6.7 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 3,029 residents but only 474 new addresses — about 6.4 extra people for every home built, against an average household of 2.7. On those numbers supply has not kept pace with growth. Housing the population projected for 2041 implies roughly 142 new dwellings a year from here, which puts the recent approval rate of 434 a year comfortably ahead of what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 6.4
Average household size 2.7

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 434
Implied need to 2041 142

Implied need assumes the average household stays at today’s 2.7 people. Approvals are not completions, and not every approval is built.

ProposedLEADING · to May 2026 Development Applications in Keilor

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged. 30 of them carry an AreaSearch analyst assessment — look for the Analysed marker in the search below.

AreaSearch tracks 1,230 development applications of material scale lodged with councils across Keilor, the most recent in May 2026. The biggest categories in the queue by value are commercial, industrial and multi-residential.
Coverage

AreaSearch reads applications directly from each council’s planning register. Keilor is not yet covered evenly. Brimbank (14% of residents) — nothing lodged since September 2021. That council is under-represented in every count and chart below.

Estimated value of applications by development type. This is the clearest single picture of what kind of place Keilor is being asked to become.

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

Approved 77
Processing on original development file 17
Application Lapsed 9
Further Information 9
Withdrawn 9
Advertising 7

A further 1,090 applications carry no status in the council feed.

By local government area

Applications on record within each council area that overlaps Keilor. This counts applications inside this statistical area only — it is not a total for the council.

Brimbank 630
Moonee Valley 428
Hume 172

No current list of the largest applications can be shown for Keilor. Nothing on record here is both still open and lodged within the last 18 months. Victoria has no state-wide planning portal and its council coverage is uneven, so what AreaSearch can collect here is a record of past activity rather than a live queue. We are currently investigating a solution. The 1,230 applications AreaSearch holds for this area, lodged between Apr 2007 and Jul 2020, are counted in the figures above.

BuildingFORWARD Major Projects & Infrastructure in Keilor

What is funded and moving — the projects large enough to change how Keilor works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 20 current projects across Keilor. The largest is M80 Ring Road Upgrade at an estimated $2.00bn, due by 2028. That breaks down as 9 under construction, 2 approved and awaiting a start and 9 still in planning. The pipeline is weighted toward transport & logistics, residential development and business parks & technology hubs.
M80 Ring Road Upgrade
Under construction $2.00bn by 2028

M80 Ring Road Upgrade

Upgrades to the M80 Ring Road including adding new lanes, installing a smart freeway lane management system, new bridges, and establishing a seamless connection to the North East Link to improve traffic flow…

Keilor

Tullamarine Logistics Estate
Under construction $450m by 2027

Tullamarine Logistics Estate

Goodman's premium industrial estate delivering over 100,000 sqm of modern warehouse and logistics facilities at Tullamarine, adjacent to Melbourne Airport. The estate offers direct access to the Tullamarine…

Keilor

Hart Industrial Precinct
Under construction $200m by 2027

Hart Industrial Precinct

A 30 hectare aviation, commercial and light industrial precinct in the north-east section of Essendon Fields. Stage 1 is over 60 percent complete, with more than 100000 square metres of total site area…

Airport West

Also in the pipeline

Keilor East Railway Station Under construction · Transport & Logistics · by 2033 · Keilor
$500m
Assembly Tullamarine In planning · Transport & Logistics · by 2028 · Keilor
$350m
Niddrie (Keilor Road) Activity Centre Structure Plan Approved · Communities, Precincts & Urban Renewal · by 2051 · Niddrie - Essendon West
$1.80bn
North Essendon Activity Centre Plan Approved · Communities, Precincts & Urban Renewal · by 2051 · Keilor East
$1.20bn
Outer Metropolitan Ring / E6 Transport Corridor In planning · Transport & Logistics · by 2046 · Keilor
$20.4bn
Rosemont Townhomes Under construction · Residential Development · by 2027 · Keilor East
$35m
17-25 Earl Street Airport West Development In planning · Residential Development · by 2026 · Airport West
$35m
12 Howes Street Airport West Apartments In planning · Residential Development · by 2028 · Airport West
$25m
18-22 Howes Street Apartments by Artisan Architects In planning · Residential Development · by 2027 · Airport West
$65m
Essendon Keilor College - East Keilor Campus Upgrade and Modernisation In planning · Education & Training · Keilor East
$24m
19-21 Louis Street Airport West In planning · Residential Development · by 2026 · Airport West
$15m
11 Ian Crescent Townhouses by DKO Architecture Under construction · Residential Development · by 2025 · Airport West
$10m

5 further projects in Keilor are not listed here.

Combined values on this page exclude 1 whole-of-state program that reaches this area but are not local to it. Both are still listed above with their own values.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $3.50bn across 3 projects with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Keilor

Development applications around Keilor

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Application search is not available in Victoria. AreaSearch holds 1,230 applications for Keilor, but they are a record of past activity rather than a current register. Victoria has no state-wide planning portal and its council coverage is uneven, so we have switched the search off here rather than return partial answers. We are currently investigating a solution. No credits are charged for Victorian applications, and building approvals from the ABS and the major projects we track are unaffected.

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Keilor

Applications and major projects plotted where they are actually proposed, with the 35 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Keilor

Keilor covers 6 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Keilor.

Keilor East area profile

No separate approvals series published
71 applications on record · 87 new addresses since 2021
Build a map

Avondale Heights area profile

No separate approvals series published
58 applications on record · 54 new addresses since 2021
Build a map

Strathmore area profile

No separate approvals series published
56 applications on record · 44 new addresses since 2021
Build a map

Keilor area profile

No separate approvals series published
802 applications on record · 23 new addresses since 2021
Build a map

Airport West area profile

No separate approvals series published
180 applications on record · 172 new addresses since 2021
Build a map

Niddrie - Essendon West area profile

No separate approvals series published
63 applications on record · 94 new addresses since 2021
Build a map

Planning Authorities Councils Covering Keilor

Keilor spans 3 local government areas — Moonee Valley, Brimbank and Hume. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of KeilorApplications on recordRegister read to
Moonee Valley 86% of residents 428 May 2026
Brimbank 14% of residents 630 September 2021
Hume 0.0% of residents 172 June 2021, few recent records

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Keilor.

Data & Method Sources & Method for Keilor

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Keilor is Statistical Area Level 3 21001 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 6 Statistical Areas Level 2. It has an estimated 64,716 residents, +4.9% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Development applications Council planning portals May 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Keilor — common questions

How many new dwellings were approved in Keilor?

The ABS recorded 458 dwelling approvals across Keilor in the 2024-25 financial year, against a five-year average of 434 a year.

How many development applications are lodged in Keilor?

AreaSearch tracks 1,230 development applications of material scale across Keilor — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged. Applications are assessed within the Moonee Valley, Brimbank and Hume local government areas. The most recent application in our data was lodged in May 2026.

What major projects are planned for Keilor?

AreaSearch tracks 20 current major projects in Keilor, 9 of them under construction. The largest include M80 Ring Road Upgrade, Tullamarine Logistics Estate and Hart Industrial Precinct.

Which council covers Keilor?

Keilor is an ABS Statistical Area Level 3. It is covered by parts of 3 local government areas — Moonee Valley, Brimbank and Hume. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Keilor growing faster than the rest of Victoria?

On development approvals, Keilor is adding new dwellings more slowly than Victoria as a whole — 0.61 approvals per 100 existing dwellings a year against the state figure of 0.80.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in May 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.