Development in Maribyrnong

VIC

Building approvals, live development applications and major projects across the Maribyrnong statistical area — covering Maribyrnong and Moonee Valley.

SA3 21303 Greater Melbourne 94,961 residents 6 statistical areas
Approved · FY25 686 dwellings approved
vs 5-yr average 927 average approvals a year
In the queue 1,238 applications on record
Major projects 41 17 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 21303 How we calculate this

The Pipeline Development Pipeline in Maribyrnong

1 Proposed 1,238 applications on record, though this council feed does not publish assessment status Latest December 2021 See applications ↓
2 Approved 686 dwellings approved in 2024-25, or 1.12 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 41 major projects committed or under construction, 17 of them already on site Forward · completions to 2030+ See projects ↓
4 Delivered 3,090 new addresses verified since the 2021 Census, up 7.1% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 686 dwelling approvals across Maribyrnong. AreaSearch tracks 41 major projects here that are committed or under construction, the largest being Joseph Road Precinct at an estimated $2.60bn. On the ground, 3,090 new addresses have been verified since the 2021 Census — growth of 7.1% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Maribyrnong

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 1.12 per 100 existing dwellings a year, above the Victoria rate of 0.80. Recent approvals are dominated by attached housing — apartments, townhouses and other non-detached dwellings make up 88% of them. Detached houses make up 50% of the homes already standing here but only 12% of the past five years of approvals, so the area is densifying. The average approved dwelling is valued at $429,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 927.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Maribyrnong 1.12
Victoria 0.80
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 50%
Approved, last 5 years 12%
Approved, latest year 12%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$333m
Residential work approved
2024-25
$1.81bn
Commercial work approved
construction cost
$429,000
Average value per approved dwelling
last two years
102
Residents per approval

Supply & Demand Is Maribyrnong Building Enough Homes?

The same approvals, measured against the population they have to house.

Maribyrnong approves about 9.8 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 9,752 residents and 3,090 new addresses, roughly one new home per 3.2 extra residents — broadly in step with an average household of 2.5. Housing the population projected for 2041 implies roughly 815 new dwellings a year from here, which puts the recent approval rate of 927 a year about level with what the projection needs.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 3.2
Average household size 2.5

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

Approved (5-yr average) 927
Implied need to 2041 815

Implied need assumes the average household stays at today’s 2.5 people. Approvals are not completions, and not every approval is built.

ProposedLEADING · to December 2021 Development Applications in Maribyrnong

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged.

AreaSearch tracks 1,238 development applications of material scale lodged with councils across Maribyrnong, the most recent in December 2021. The biggest categories in the queue by value are mixed-use, retail and commercial.
Coverage

AreaSearch reads applications directly from each council’s planning register. This whole area sits within one council, and nothing has been lodged in its register since December 2021. Treat everything below as the position at that date rather than as today’s live queue.

Estimated value of applications by development type. This is the clearest single picture of what kind of place Maribyrnong is being asked to become.

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

Permit issued 1

A further 1,237 applications carry no status in the council feed.

By local government area

Applications on record within each council area that overlaps Maribyrnong. This counts applications inside this statistical area only — it is not a total for the council.

Maribyrnong 1,238

No current list of the largest applications can be shown for Maribyrnong. Nothing on record here is both still open and lodged within the last 18 months. Victoria has no state-wide planning portal and its council coverage is uneven, so what AreaSearch can collect here is a record of past activity rather than a live queue. We are currently investigating a solution. The 1,238 applications AreaSearch holds for this area, lodged between Aug 2009 and Oct 2020, are counted in the figures above.

BuildingFORWARD Major Projects & Infrastructure in Maribyrnong

What is funded and moving — the projects large enough to change how Maribyrnong works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 41 current projects across Maribyrnong. The largest is Joseph Road Precinct at an estimated $2.60bn, due by 2028. That breaks down as 17 under construction, 12 approved and awaiting a start and 12 still in planning. The pipeline is weighted toward residential development, communities, precincts & urban renewal and communities.
Victoria Square by Growland
Under construction $600m by 2026

Victoria Square by Growland

Six-tower residential development with 939 apartments featuring Australia's first Olympic-sized aerial outdoor track, 2400sqm sky garden, heated indoor pool, gymnasium, private dining room, and a lively dining…

Footscray

Joseph Road Precinct
Under construction $2.60bn by 2028

Joseph Road Precinct

A 17-hectare urban renewal program transforming former industrial warehouse and factory land between the Maribyrnong River and the Footscray-South Kensington rail corridor into a high-density mixed-use…

Footscray

Bradmill Yarraville
Under construction $1.50bn by 2031

Bradmill Yarraville

Bradmill Yarraville is a 1.5 billion dollar urban renewal project transforming the historic 26-hectare Bradmill denim factory into a sustainable mixed-use neighborhood. The development will deliver…

Yarraville

Also in the pipeline

Riverina Apartments Under construction · Residential Development · by 2026 · Footscray
$620m
RiverQuay Under construction · Residential Development · by 2026 · Footscray
$156m
Kinnear's Precinct Approved · Communities, Precincts & Urban Renewal · by 2030 · Footscray
$750m
Live City Approved · Communities, Precincts & Urban Renewal · by 2030 · Footscray
$880m
191 Rosamond Road Mixed-Use Development Approved · Communities, Precincts & Urban Renewal · by 2028 · Maribyrnong
$200m
2 Neilson Place (The Tannery) Approved · Residential Development · by 2027 · Footscray
$180m
Existing Footscray Hospital Site Redevelopment In planning · Communities, Precincts & Urban Renewal · by 2029 · Footscray
$500m
Thomas Holmes Street Affordable Housing Under construction · Communities · by 2027 · Maribyrnong
$69m
Live City Stage 2 Approved · Communities, Precincts & Urban Renewal · by 2030 · Footscray
$250m
West Footscray Community Facilities Plan Under construction · Sports & Recreation · by 2027 · West Footscray - Tottenham
$42m
Yarraville Green Under construction · Residential Development · by 2026 · Yarraville
$85m
Perri Melbourne Data Centre (WEFO Woolstores) In planning · Business Parks & Technology Hubs · by 2028 · West Footscray - Tottenham
$1.00bn

26 further projects in Maribyrnong are not listed here.

Combined values on this page exclude 3 records that appear to be separate stages of a project already counted. Both are still listed above with their own values.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $4.50bn across 2 projects with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Maribyrnong

Development applications around Maribyrnong

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Application search is not available in Victoria. AreaSearch holds 1,238 applications for Maribyrnong, but they are a record of past activity rather than a current register. Victoria has no state-wide planning portal and its council coverage is uneven, so we have switched the search off here rather than return partial answers. We are currently investigating a solution. No credits are charged for Victorian applications, and building approvals from the ABS and the major projects we track are unaffected.

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Maribyrnong

Applications and major projects plotted where they are actually proposed, with the 70 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Maribyrnong

Maribyrnong covers 6 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Maribyrnong.

Braybrook area profile

No separate approvals series published
169 applications on record · 532 new addresses since 2021
Build a map

Footscray area profile

No separate approvals series published
444 applications on record · 1,936 new addresses since 2021
Build a map

Yarraville area profile

No separate approvals series published
210 applications on record · 338 new addresses since 2021
Build a map

Maribyrnong area profile

No separate approvals series published
128 applications on record · 114 new addresses since 2021
Build a map

West Footscray - Tottenham area profile

No separate approvals series published
173 applications on record · 126 new addresses since 2021
Build a map

Seddon - Kingsville area profile

No separate approvals series published
114 applications on record · 44 new addresses since 2021
Build a map

Planning Authorities Councils Covering Maribyrnong

Maribyrnong spans 2 local government areas — Maribyrnong and Moonee Valley. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of MaribyrnongApplications on recordRegister read to
Maribyrnong 100% of residents 1,238 December 2021
Moonee Valley 0.0% of residents Not yet collected

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Maribyrnong.

Data & Method Sources & Method for Maribyrnong

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Maribyrnong is Statistical Area Level 3 21303 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 6 Statistical Areas Level 2. It has an estimated 94,961 residents, +11.4% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Development applications Council planning portals December 2021
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Maribyrnong — common questions

How many new dwellings were approved in Maribyrnong?

The ABS recorded 686 dwelling approvals across Maribyrnong in the 2024-25 financial year, against a five-year average of 927 a year.

How many development applications are lodged in Maribyrnong?

AreaSearch tracks 1,238 development applications of material scale across Maribyrnong — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged. Applications are assessed within the Maribyrnong and Moonee Valley local government areas. The most recent application in our data was lodged in December 2021.

What major projects are planned for Maribyrnong?

AreaSearch tracks 41 current major projects in Maribyrnong, 17 of them under construction. The largest include Victoria Square by Growland, Joseph Road Precinct and Bradmill Yarraville.

Which council covers Maribyrnong?

Maribyrnong is an ABS Statistical Area Level 3. It is covered by parts of 2 local government areas — Maribyrnong and Moonee Valley. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Maribyrnong growing faster than the rest of Victoria?

On development approvals, Maribyrnong is adding new dwellings faster than Victoria as a whole — 1.12 approvals per 100 existing dwellings a year against the state figure of 0.80.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in December 2021. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.