QLD

Building approvals, live development applications and major projects across the Capalaba statistical area — covering Redland and Brisbane.

SA3 30101 Greater Brisbane 77,327 residents 6 statistical areas
Approved · FY25 293 dwellings approved
vs 5-yr average 261 average approvals a year
In the queue 24 live applications
Major projects 13 5 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 30101 How we calculate this

The Pipeline Development Pipeline in Capalaba

1 Proposed 24 applications in assessment Leading · to July 2026 See applications ↓
2 Approved 293 dwellings approved in 2024-25, or 0.41 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 13 major projects committed or under construction, 5 of them already on site Forward · completions to 2030+ See projects ↓
4 Delivered 464 new addresses verified since the 2021 Census, up 1.7% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 293 dwelling approvals across Capalaba. Right now, 24 development applications are before the 2 councils covering the area. AreaSearch tracks 13 major projects here that are committed or under construction, the largest being Eastern Metro Expansion (CBD to Capalaba) at an estimated $1.50bn. On the ground, 464 new addresses have been verified since the 2021 Census — growth of 1.7% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in Capalaba

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.41 per 100 existing dwellings a year, below the Queensland rate of 0.77. The mix is genuinely split — 68% of recent approvals are detached houses and 32% are attached or higher-density dwellings. Detached houses make up 85% of the homes already standing here but only 73% of the past five years of approvals, so the area is densifying. The average approved dwelling is valued at $504,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 261.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

Capalaba 0.41
Queensland 0.77
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 85%
Approved, last 5 years 73%
Approved, latest year 68%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$157m
Residential work approved
2024-25
$54.7m
Commercial work approved
construction cost
$504,000
Average value per approved dwelling
last two years
243
Residents per approval

Supply & Demand Is Capalaba Building Enough Homes?

The same approvals, measured against the population they have to house.

Capalaba approves about 3.4 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 3,943 residents but only 464 new addresses — about 8.5 extra people for every home built, against an average household of 2.8. On those numbers supply has not kept pace with growth.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 8.5
Average household size 2.8

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

3.4

dwellings approved a year per 1,000 residents. No population projection is published for this area.

ProposedLEADING · to July 2026 Development Applications in Capalaba

What is being asked for right now — applications collected from council planning portals, before any of it reaches the ABS series above. AreaSearch tracks applications of material scale; routine minor works such as signage and fencing changes are not carried, so these are not counts of every application lodged. 15 of them carry an AreaSearch analyst assessment — look for the Analysed marker in the search below.

AreaSearch tracks 2,405 development applications of material scale lodged with councils across Capalaba, the most recent in July 2026. The most common types in the queue are multi-residential, commercial and industrial. Live applications account for about 99 proposed dwellings.

Number of applications by development type. This is the clearest single picture of what kind of place Capalaba is being asked to become. Councils in Queensland do not publish an estimated cost of works in their planning feeds, so applications here are counted rather than valued. A further 26 applications sit across 2 smaller categories, too few to plot.

Where the applications stand

As reported by the council. Highlighted rows are applications still in assessment.

Past 2,134
Decided 244
In Progress 27

3 applications are still marked under assessment but were lodged more than 18 months ago. Councils often leave determined or abandoned applications open in their feeds, so they are counted here but excluded from the live queue above.

By local government area

Applications on record within each council area that overlaps Capalaba. This counts applications inside this statistical area only — it is not a total for the council.

Redland 2,134
Brisbane 271

Recent applications in Capalaba

By the number of dwellings proposed, as lodged. Figures are the applicant’s own and are not verified by AreaSearch.

Town centre revitalisation including library, commercial, retail, childcare, hotel & residential Capalaba · In Progress · lodged Jun 2026
50 dwellings
Multiple Dwelling development comprising 21 townhouses Thorneside · In Progress · lodged May 2026
21 dwellings
18 townhouse (terrace) dwellings over 4 stages and 1 into 18 lot freehold subdivision Wellington Point · In Progress · lodged May 2026
18 dwellings
Ten single-level two-bedroom multiple dwellings with associated car parking and landscaping Alexandra Hills · In Progress · lodged Apr 2026
10 dwellings
Change to Development Approval - R732 - Conv- TO SHOPPING for Installation of EV charging infrastructure within existing car park Birkdale · In Progress · lodged Jul 2026
Material Change of Use for Food and Drink Outlet/Shop Capalaba · In Progress · lodged Jul 2026
Carry Out Building Work - Doyen Planning Pty Ltd (Primary Applicant), Doyen Planning Pty Ltd (Consultant) Belmont - Gumdale · In Progress · lodged Jul 2026
Material Change of Use for Extensions to Warehouse (Mezzanine) Capalaba · In Progress · lodged Jun 2026

BuildingFORWARD Major Projects & Infrastructure in Capalaba

What is funded and moving — the projects large enough to change how Capalaba works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 13 current projects across Capalaba. The largest is Eastern Metro Expansion (CBD to Capalaba) at an estimated $1.50bn, due by 2032. That breaks down as 5 under construction and 8 still in planning. The pipeline is weighted toward residential development, sports & recreation and communities, precincts & urban renewal.
Chandler Indoor Sports Centre and Precinct
Under construction $257m by 2027

Chandler Indoor Sports Centre and Precinct

A new 10,000-capacity indoor high-performance sports centre within the Sleeman Sports Complex (Chandler Sports Precinct), funded jointly by the Australian and Queensland Governments through the $1.87 billion…

Belmont - Gumdale

Capalaba Town Centre Revitalisation Project
Under construction $183m by 2028

Capalaba Town Centre Revitalisation Project

A $183 million to $250 million urban renewal initiative transforming 1.55 hectares into the civic and commercial heart of Capalaba. The masterplan features a new Redland City Council library, customer service…

Capalaba

Brisbane Aquatic Centre Upgrades
In planning $257m by 2027

Brisbane Aquatic Centre Upgrades

Upgrades to the Brisbane Aquatic Centre at the Chandler Sports Precinct (Sleeman Sports Complex) to support the Brisbane 2032 Olympic and Paralympic Games. The centre, originally built for the 1982…

Belmont - Gumdale

Also in the pipeline

Eastern Metro Expansion (CBD to Capalaba) In planning · Transport & Logistics · by 2032 · Belmont - Gumdale
$1.50bn
Birkdale Community Precinct including Redland Whitewater Centre In planning · Communities, Precincts & Urban Renewal · by 2030 · Alexandra Hills
$300m
Wellington Point Village Streetscape Revitalisation Under construction · Communities, Precincts & Urban Renewal · by 2026 · Wellington Point
$8m
Botanix In planning · Residential Development · by 2032 · Wellington Point
$200m
Alexandra Hills Social Housing Under construction · Residential Development · by 2026 · Alexandra Hills
$9m
Wellington Point Recreation Reserve and Boating Facilities Upgrade In planning · Sports & Recreation · Wellington Point
$25m
Daveson Road Social and Affordable Housing In planning · Residential Development · by 2027 · Capalaba
Wellington Point Jetty Structural Repairs Stage 2 Under construction · Ports, Marinas, Fisheries & Aquaculture · by 2025 · Wellington Point
$1m
Birkdale Grove In planning · Residential Development · Birkdale
148 Finucane Road Apartments In planning · Residential Development · Alexandra Hills

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $1.70bn across 2 projects with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

Approvals Pipeline Development Applications in Capalaba

Development applications around Capalaba

Development approvals is a new addition to AreaSearch. We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
In the local catchment
Est. Value
Where disclosed
Under Assessment
Awaiting determination
Determined
Approved or decided
Approvals pipeline Status, location, timing and project scale

Loading development applications…

Lodged Address Description Type Distance Status

SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.

ProfessionalPRO Development Map for Capalaba

Applications and major projects plotted where they are actually proposed, with the 19 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in Capalaba

Capalaba covers 6 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of Capalaba.

Capalaba area profile

No separate approvals series published
1,194 applications on record · 164 new addresses since 2021
Build a map

Alexandra Hills area profile

No separate approvals series published
263 applications on record · 68 new addresses since 2021
Build a map

Birkdale area profile

No separate approvals series published
300 applications on record · 118 new addresses since 2021
Build a map

Wellington Point area profile

No separate approvals series published
300 applications on record · 94 new addresses since 2021
Build a map

Belmont - Gumdale area profile

No separate approvals series published
267 applications on record
Build a map

Thorneside area profile

No separate approvals series published
81 applications on record
Build a map

Planning Authorities Councils Covering Capalaba

Capalaba spans 2 local government areas — Redland and Brisbane. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of CapalabaApplications on recordRegister read to
Redland 90% of residents 2,134 July 2026
Brisbane 10% of residents 271 July 2026

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring Capalaba.

Data & Method Sources & Method for Capalaba

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

Capalaba is Statistical Area Level 3 30101 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 6 Statistical Areas Level 2. It has an estimated 77,327 residents, +5.4% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Development applications Council planning portals July 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in Capalaba — common questions

How many new dwellings were approved in Capalaba?

The ABS recorded 293 dwelling approvals across Capalaba in the 2024-25 financial year, against a five-year average of 261 a year.

How many development applications are lodged in Capalaba?

AreaSearch tracks 2,405 development applications of material scale across Capalaba — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 24 remain in assessment. Applications are assessed within the Redland and Brisbane local government areas. The most recent application in our data was lodged in July 2026.

What major projects are planned for Capalaba?

AreaSearch tracks 13 current major projects in Capalaba, 5 of them under construction. The largest include Chandler Indoor Sports Centre and Precinct, Capalaba Town Centre Revitalisation Project and Brisbane Aquatic Centre Upgrades.

Which council covers Capalaba?

Capalaba is an ABS Statistical Area Level 3. It is covered by parts of 2 local government areas — Redland and Brisbane. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is Capalaba growing faster than the rest of Queensland?

On development approvals, Capalaba is adding new dwellings more slowly than Queensland as a whole — 0.41 approvals per 100 existing dwellings a year against the state figure of 0.77.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in July 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.