Development in North East

TAS

Building approvals, live development applications and major projects across the North East statistical area — covering Northern Midlands, George Town and Dorset and 4 more.

SA3 60203 Rest of Tas. 42,131 residents 8 statistical areas
Approved · FY25 312 dwellings approved
vs 5-yr average 282 average approvals a year
In the queue council feed not yet covered
Major projects 22 5 already under construction
Data Sources ABSCouncil planning portals ABS to June 2026 · Refreshed ABS QuickStats SA3 60203 How we calculate this

The Pipeline Development Pipeline in North East

1 Proposed Not yet covered council planning feeds for this area are still being added Coverage expanding
2 Approved 312 dwellings approved in 2024-25, or 0.66 per 100 existing dwellings a year Official · ABS to June 2026 See approvals ↓
3 Building 22 major projects committed or under construction, 5 of them already on site Forward · completions to 2029+ See projects ↓
4 Delivered 1,368 new addresses verified since the 2021 Census, up 5.8% on the existing base Actual · to June 2026 Where it landed ↓
In the 2024-25 financial year the ABS recorded 312 dwelling approvals across North East. AreaSearch tracks 22 major projects here that are committed or under construction, the largest being Star of the South Offshore Wind Farm at an estimated $8.00bn. On the ground, 1,368 new addresses have been verified since the 2021 Census — growth of 5.8% on the existing address base.

These four figures are deliberately not added together. An application, an approval and a project under construction are often the same building at three points in its life, measured by three different bodies with three different lags. Read them as a sequence, not a total.

Approved Building Approvals in North East

What councils and certifiers have formally permitted — the ABS series, published about four months in arrears.

Approvals are running at 0.66 per 100 existing dwellings a year, above the Tasmania rate of 0.43. Development here remains overwhelmingly detached: houses account for 99% of recent approvals. The mix being approved closely matches what is already standing — 99% houses against 93% of existing homes. The average approved dwelling is valued at $355,000 in construction cost.

Dwelling units approved each financial year. The dashed line is the five-year average of 282.

How intensively is it building?

Dwelling approvals a year per 100 existing dwellings.

North East 0.66
Tasmania 0.43
Australia 0.71

What is here, and what is coming

Detached houses as a share of existing homes, against the share of recent approvals.

Existing homes (2021 Census) 93%
Approved, last 5 years 99%
Approved, latest year 99%
Detached houses Apartments, townhouses & other

Approvals mix by year

Share of each year’s approvals.

2022
2023
2024
2025
2024-25
$127m
Residential work approved
2024-25
$65.3m
Commercial work approved
construction cost
$355,000
Average value per approved dwelling
last two years
154
Residents per approval

Supply & Demand Is North East Building Enough Homes?

The same approvals, measured against the population they have to house.

North East approves about 6.7 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 2,531 residents and 1,368 new addresses — about 1.9 extra people per home built, below the 2.5-person average household, so building has run ahead of population growth.

Growth against supply since the Census

People added for every new address verified, against the size of an average local household.

People added per new home 1.9
Average household size 2.5

A bar longer than the household average means the area gained more residents than its new housing could hold, and the extra had to be absorbed by existing homes.

Approval rate against projected need

Dwellings a year: what is currently being approved, against what the 2041 population projection implies.

6.7

dwellings approved a year per 1,000 residents. No population projection is published for this area.

BuildingFORWARD Major Projects & Infrastructure in North East

What is funded and moving — the projects large enough to change how North East works, ranked by committed value and how close they are to delivery.

AreaSearch tracks 22 current projects across North East. The largest is Star of the South Offshore Wind Farm at an estimated $8.00bn, due by 2032. That breaks down as 5 under construction, 3 approved and awaiting a start and 14 still in planning. The pipeline is weighted toward energy, communities, precincts & urban renewal and residential development.
Star of the South Offshore Wind Farm
In planning $8.00bn by 2032

Star of the South Offshore Wind Farm

Star of the South is a proposed offshore wind farm in Bass Strait off Gippsland, Victoria. The project has a feasibility licence area of about 586 square kilometres and proposes up to 2.2 GW of offshore wind…

Flinders and Cape Barren Islands

Bass Offshore Wind Energy Project (BOWE)
In planning $5.00bn by 2033

Bass Offshore Wind Energy Project (BOWE)

The Bass Offshore Wind Energy (BOWE) project is a proposed large-scale offshore wind farm in Commonwealth waters of the Bass Strait, around 30 km off the north-east coast of Tasmania. Plans call for between 70…

Flinders and Cape Barren Islands

Skyeview Estate
Under construction $36m

Skyeview Estate

Skyeview Estate is a 130-lot residential subdivision in Perth, Tasmania, situated between Napoleon Street and the Midland Highway, around 15 minutes from Launceston. Described as the Northern Midlands' biggest…

Perth - Evandale

Also in the pipeline

South Perth Outline Development Plan In planning · Communities, Precincts & Urban Renewal · by 2032 · Perth - Evandale
$85m
Longford Ambulance Station Under construction · Health · by 2027 · Longford
$5m
H2TAS Renewable Hydrogen and Ammonia Facility In planning · Energy · George Town
$3.00bn
West Perth (Sheepwash Creek) Stormwater Upgrades Under construction · Environmental & Disaster Management · by 2026 · Perth - Evandale
$4m
Longford Child and Family Learning Centre In planning · Education & Training · by 2029 · Longford
$8m
Perth South Esk River Parklands In planning · Communities, Precincts & Urban Renewal · Perth - Evandale
$2m
Lowes / BP 24-hour service station (Longford) Approved · Retail · Longford
Longford Expansion Strategy & Longford Racecourse Precinct Master Plan In planning · Communities, Precincts & Urban Renewal · by 2044 · Longford
Perth Sports Precinct Master Plan In planning · Sports & Recreation · Perth - Evandale
George Town 4-Townhouse Development Under construction · Residential Development · George Town
Launceston Airport Terminal Redevelopment Under construction · Transport & Logistics · Perth - Evandale
Bell Bay Powerfuels Project Approved · Energy · George Town

7 further projects in North East are not listed here.

AI Generated Denotes AI-based impression for illustrative purposes only, not to be taken as definitive under any circumstances. Please follow links and conduct other investigations from the project’s source for actual imagery. Developers and project owners wishing us to use original imagery please Contact Us and we will do so.

Beyond 2030: a further $13.1bn across 3 projects with completion dates further out — mostly precinct-scale programs whose dates are indicative. Kept out of the chart so the years you can act on stay readable.

Estimated value of tracked projects by the year they are due to complete, stacked by how certain they are. The dark band is money already being spent; the pale band is still an intention. Estimates are indicative and mix infrastructure cost with whole-of-precinct development value, so read the shape rather than the totals.

ProfessionalPRO Development Map for North East

Applications and major projects plotted where they are actually proposed, with the 24 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage, area and committed value. To search every application on record rather than this sample, use the section above.

Distribution Where Development Is Happening in North East

North East covers 8 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder

Each area below opens a map builder on its own page — a tool for putting a map and a table into a report. Pick the place types you want plotted (schools, supermarkets, medical, child care, transport and the rest of what AreaSearch holds), add development applications as their own layer, drop your own points, then recolour, renumber and export the result as a table or CSV. A this area only toggle clips everything to the boundary you are looking at. Searches are charged against your credit balance — 1 credit per 40 results from AreaSearch data — and setting filters costs nothing until you search. The builder works on one suburb-sized area at a time, which is why it opens per area rather than across the whole of North East.

George Town area profile

No separate approvals series published
341 new addresses since 2021
Build a map

Scottsdale - Bridport area profile

No separate approvals series published
190 new addresses since 2021
Build a map

St Helens - Scamander area profile

No separate approvals series published
256 new addresses since 2021
Build a map

Perth - Evandale area profile

No separate approvals series published
217 new addresses since 2021
Build a map

Longford area profile

No separate approvals series published
148 new addresses since 2021
Build a map

Dilston - Lilydale area profile

No separate approvals series published
74 new addresses since 2021
Build a map

Northern Midlands area profile

No separate approvals series published
134 new addresses since 2021
Build a map

Flinders and Cape Barren Islands area profile

No separate approvals series published
Build a map

Planning Authorities Councils Covering North East

North East spans 7 local government areas — Northern Midlands, George Town, Dorset, Break O'Day, Launceston, Flinders and West Tamar. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS issues a separate official building-approvals series for local government areas, and totals built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page reconcilable with the published ABS series.
Local government areaShare of North EastApplications on recordRegister read to
Northern Midlands 35% of residents Not yet collected
George Town 18% of residents Not yet collected
Dorset 17% of residents Not yet collected
Break O'Day 17% of residents Not yet collected
Launceston 11% of residents Not yet collected
Flinders 2.3% of residents Not yet collected
West Tamar 0.0% of residents Not yet collected

Compare Nearby Development Hubs

The same view of building approvals, applications and major projects for areas neighbouring North East.

Data & Method Sources & Method for North East

The four tenses, and what each one can tell you

Proposed — development applications
Collected from council planning portals. The earliest signal available, but the least certain: many applications are amended, withdrawn or refused, values are the applicant’s own estimate, and coverage varies by council. This is a curated set, not the full council feed: AreaSearch carries applications of material scale and does not track routine minor works such as signage, fencing or small alterations, so the counts here are lower than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than 18 months after lodgement are reported separately and kept out of the live-queue figures: the age profile of open applications is sharply split between a genuine queue under a year old and a long tail of records councils never closed. Not every state publishes a cost of works — Queensland, the Northern Territory and the ACT publish none at all — so on those pages applications are counted rather than valued and no dollar figure is shown rather than a partial one. Treated here as a snapshot of the current queue only — AreaSearch does not chart application counts over time, because the history reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from ABS building approvals data, currently published to June 2026. Counts dwelling units approved, not buildings and not completions. The most recent financial year is annualised from nine months of data wherever it appears and is labelled as such.
Building — major projects
Projects tracked individually by AreaSearch from Infrastructure Australia, state infrastructure agencies, developer disclosures and council records. Values are estimates and delivery dates are targets. Ranked on this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national address register since the 2021 Census. This is the closest available measure of what has actually been built, though address creation can lead occupation and lags construction. It is not a completions count.

Boundaries

North East is Statistical Area Level 3 60203 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 8 Statistical Areas Level 2. It has an estimated 42,131 residents, +6.4% since the 2021 Census.

Currency

MeasureSourceTo
Dwelling approvals, five-year average ABS / AreaSearch June 2026
House share of approvals ABS / AreaSearch June 2026
Residents per approval ABS / AreaSearch June 2026
Value per approved dwelling ABS / AreaSearch June 2026
Commercial work approved ABS / AreaSearch June 2026
Verified new addresses since the Census Address register / AreaSearch May 2026
Major projects Infrastructure Australia / state agencies / AreaSearch Ongoing

Figures on this page are read live from the AreaSearch database each time it loads, so they update as soon as a source does.

Development in North East — common questions

How many new dwellings were approved in North East?

The ABS recorded 312 dwelling approvals across North East in the 2024-25 financial year, against a five-year average of 282 a year.

What major projects are planned for North East?

AreaSearch tracks 22 current major projects in North East, 5 of them under construction. The largest include Star of the South Offshore Wind Farm, Bass Offshore Wind Energy Project (BOWE) and Skyeview Estate.

Which council covers North East?

North East is an ABS Statistical Area Level 3. It is covered by parts of 7 local government areas — Northern Midlands, George Town, Dorset, Break O'Day, Launceston, Flinders and West Tamar. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.

Is North East growing faster than the rest of Tasmania?

On development approvals, North East is adding new dwellings faster than Tasmania as a whole — 0.66 approvals per 100 existing dwellings a year against the state figure of 0.43.

How current is this development data?

ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.

Development data is provided for general information. Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and are not independently verified by AreaSearch. Confirm anything material with the relevant council or agency before relying on it.