Building approvals, live development applications and major projects across the
Bourke - Cobar - Coonamble statistical area — covering Walgett, Cobar and Coonamble and 5 more.
SA3 10501Rest of NSW21,898 residents5 statistical areas
The PipelineDevelopment Pipeline in Bourke - Cobar - Coonamble
1 Proposed57applications in assessmentLeading · to July 2026See applications ↓
2 Approved37dwellings approved in 2024-25, or 0.17 per 100 existing dwellings a yearOfficial · ABS to June 2026See approvals ↓
3 Building7major projects committed or under construction, 3 of them already on siteForward · completions to 2030+See projects ↓
4 Delivered132new addresses verified since the 2021 Census, up 1.0% on the existing baseActual · to June 2026Where it landed ↓
In the 2024-25 financial year the ABS recorded 37 dwelling approvals across Bourke - Cobar - Coonamble. Right now, 57 development applications are before the 8 councils covering the area. AreaSearch tracks 7 major projects here that are committed or under construction, the largest being Cobar Wind Farm at an estimated $450m. On the ground, 132 new addresses have been verified since the 2021 Census — growth of 1.0% on the existing address base.
These four figures are deliberately not added together. An application, an
approval and a project under construction are often the same building at three points in its life,
measured by three different bodies with three different lags. Read them as a sequence, not a total.
ApprovedBuilding Approvals in Bourke - Cobar - Coonamble
What councils and certifiers have formally
permitted — the ABS series, published about four months in arrears.
Approvals are running at 0.17 per 100 existing dwellings a year, well below the New South Wales rate of 0.59. The mix is genuinely split — 64% of recent approvals are detached houses and 36% are attached or higher-density dwellings. That is a clear shift toward density — the five-year average is 76% houses. Detached houses make up 90% of the homes already standing here but only 76% of the past five years of approvals, so the area is densifying. The average approved dwelling is valued at $542,000 in construction cost.
For its size, Bourke - Cobar - Coonamble is adding 0.17 dwellings a year per 100 existing homes — well below the New South Wales rate of 0.59 and the national rate of 0.71. That is about 1.4 approvals a year for every 1,000 residents. Building intensity has risen by about 23% across the published series.
Measured against people rather than housing stock, Bourke - Cobar - Coonamble is approving 1.65 dwellings a year per 1,000 residents — well below the New South Wales rate of 5.61. The two rate views differ by household size, which here averages 2.9 people per home.
Dwelling approvals a year per 100 existing
homes, with New South Wales and Australia for comparison. This is the
same activity as the totals view, divided by the size of the area — which is the only
fair way to compare a large SA3 with a small one.
Dwelling approvals a year per 1,000
residents, each year divided by that year’s estimated resident
population (ABS ERP at 30 June), not by today’s — which matters most in fast-growing
areas, where a fixed denominator can understate the early years by half. The most recent periods use the latest published ERP, as the population series runs a year behind approvals. Read it alongside the per-100-homes view: the two differ wherever household size does.
Dwelling units approved each financial year. The dashed line is the five-year average of 30.
How intensively is it building?
Dwelling approvals a year per 100 existing dwellings.
Bourke - Cobar - Coonamble0.17
New South Wales0.59
Australia0.71
What is here, and what is coming
Detached houses as a share of existing homes,
against the share of recent approvals.
The same approvals, measured against the population
they have to house.
Bourke - Cobar - Coonamble approves about 1.4 new dwellings a year for every 1,000 residents. Since the 2021 Census it has added 291 residents and 132 new addresses, roughly one new home per 2.2 extra residents — broadly in step with an average household of 2.9.
Growth against supply since the Census
People added for every new address verified,
against the size of an average local household.
People added per new home2.2
Average household size2.9
A bar longer than the household average means
the area gained more residents than its new housing could hold, and the extra had to be
absorbed by existing homes.
Approval rate against projected need
Dwellings a year: what is currently being
approved, against what the 2041 population projection implies.
1.4
dwellings approved a year per 1,000 residents.
No population projection is published for this area.
What is being asked for right now — applications
collected from council planning portals, before any of it reaches the ABS series above.
AreaSearch tracks applications of material scale; routine minor works such as signage and
fencing changes are not carried, so these are not counts of every application lodged. 22
of them carry an AreaSearch analyst assessment — look for the
Analysed marker in the search below.
AreaSearch tracks 441 development applications of material scale lodged with councils across Bourke - Cobar - Coonamble, the most recent in July 2026. 57 of them are still in assessment. The biggest categories in the queue by value are mixed-use, commercial and childcare.
Estimated value of applications by development type. This is the clearest
single picture of what kind of place Bourke - Cobar - Coonamble is being asked to become.
Where the applications stand
As reported by the council. Highlighted rows are
applications still in assessment.
Determined227
Approved81
Under Assessment41
Additional Information Requested29
Withdrawn28
Cancelled19
19 applications are still marked under
assessment but were lodged more than
18 months ago. Councils often leave determined or
abandoned applications open in their feeds, so
they are counted here but excluded
from the live queue above.
By local government area
Applications on record within each council area that
overlaps Bourke - Cobar - Coonamble. This counts applications inside this
statistical area only — it is not a total for the council.
Walgett265
Cobar50
Coonamble50
Bogan24
Bourke23
Recent applications in Bourke - Cobar - Coonamble
By estimated cost of works, as lodged. Estimates are the applicant’s own figures and are not verified by AreaSearch.
Commercial / Office and Mixed-Use Precincts developmentWalgett - Lightning Ridge · Additional Information Requested · lodged Mar 2026 · 6 dwellings
Commercial / Office developmentWalgett - Lightning Ridge · Additional Information Requested · lodged Feb 2026
$4.7m
Aged Care / Retirement developmentWalgett - Lightning Ridge · Additional Information Requested · lodged Feb 2026
$800k
BuildingFORWARDMajor Projects & Infrastructure in Bourke - Cobar - Coonamble
What is funded and moving — the projects large enough
to change how Bourke - Cobar - Coonamble works, ranked by committed value and how close
they are to delivery.
AreaSearch tracks 7 current projects across Bourke - Cobar - Coonamble. The largest is Cobar Wind Farm at an estimated $450m, due by 2030. That breaks down as 3 under construction and 4 still in planning. The pipeline is weighted toward energy, environmental & disaster management and precincts & urban renewal.
Under construction$32.0bnStatewide programby 2034
NSW Renewable Energy Zones (REZ) Program
NSW is delivering five Renewable Energy Zones (Central-West Orana, New England, South West, Hunter-Central Coast, and Illawarra) to coordinate wind and solar generation, storage, and high-voltage transmission…
The project involves constructing two new state-of-the-art pump stations at Nyngan and Hermidale to replace critically ageing infrastructure and ensure reliable water supply for the Cobar region. Cobar is one…
Proposed wind farm and Battery Energy Storage System (BESS) featuring up to 30 turbines (up to 280m in height) with a 216 MW installed capacity and a 50MW/100MWh BESS across approximately 7,800 hectares of…
Combined values on this page exclude
1 whole-of-state program that
reaches this area but are not
local to it. Both are still listed
above with their own values.
Denotes AI-based impression for illustrative purposes only, not to be taken as
definitive under any circumstances. Please follow links and conduct other
investigations from the project’s source for actual imagery. Developers and
project owners wishing us to use original imagery please Contact
Us and we will do so.
Estimated value of tracked projects by the year they are due to
complete, stacked by how certain they are. The dark band is money already being spent;
the pale band is still an intention. Estimates are indicative and mix infrastructure
cost with whole-of-precinct development value, so read the shape rather than the totals.
Approvals PipelineDevelopment Applications in Bourke - Cobar - Coonamble
Development applications around
Bourke - Cobar - Coonamble
Development approvals is a new addition to AreaSearch.
We’re actively expanding council coverage and refining the dataset — details and statuses for some councils may be partial. Check back regularly for the latest pipeline.
Applications
—
In the local catchment
Est. Value
—
Where disclosed
Under Assessment
—
Awaiting determination
Determined
—
Approved or decided
Approvals pipelineStatus, location, timing and project scale
Loading development applications…
Lodged
Address
Description
Type
Distance
Status
SOURCE: Planning portals and council registers, compiled by AreaSearch. Distance & bearing measured from the suburb midpoint.
ProfessionalPRODevelopment Map for Bourke - Cobar - Coonamble
Applications and major projects plotted where
they are actually proposed, with the
8 projects AreaSearch tracks here on their own tab — filterable by type, delivery stage,
area and committed value. To search every application on record rather
than this sample, use the section above.
DistributionWhere Development Is Happening in Bourke - Cobar - Coonamble
Bourke - Cobar - Coonamble covers 5 statistical areas. Follow any of them through for a full profile of population, housing, sales and amenity at local scale.
Map builder
Each area below opens a map builder on its own page — a tool for
putting a map and a table into a report. Pick the place types you want plotted
(schools, supermarkets, medical, child care, transport and the rest of what
AreaSearch holds), add development applications as their own layer, drop your own
points, then recolour, renumber and export the result as a table or CSV.
A this area only toggle clips everything to the boundary you are looking at.
Searches are charged against your credit balance — 1 credit per 40
results from AreaSearch data — and setting filters costs nothing until
you search. The builder works on one suburb-sized area at a time, which is why it
opens per area rather than across the whole of
Bourke - Cobar - Coonamble.
Bourke - Cobar - Coonamble spans 8 local government areas — Walgett, Cobar, Coonamble, Bogan, Warren, Bourke, Brewarrina and Lachlan. Applications here are assessed by whichever of those councils the site falls within. AreaSearch publishes development
figures at ABS statistical boundaries rather than council boundaries. That is deliberate: the ABS
issues a separate official building-approvals series for local government areas, and totals
built up from statistical areas would not match it. Reporting at SA3 keeps every figure on this page
reconcilable with the published ABS series.
Local government area
Share of Bourke - Cobar - Coonamble
Applications on record
Register read to
Walgett
24% of residents
265
July 2026
Cobar
19% of residents
50
May 2026
Coonamble
17% of residents
50
June 2026
Bogan
11% of residents
24
April 2026
Warren
11% of residents
15
May 2026
Bourke
11% of residents
23
June 2026
Brewarrina
6.3% of residents
14
July 2026
Lachlan
0.3% of residents
—
Not yet collected
CompareNearby Development Hubs
The same view of building approvals, applications and
major projects for areas neighbouring Bourke - Cobar - Coonamble.
Data & MethodSources & Method for Bourke - Cobar - Coonamble
The four tenses, and what each one can tell you
Proposed — development applications
Collected from council planning portals. The
earliest signal available, but the least certain: many applications are amended,
withdrawn or refused, values are the applicant’s own estimate, and coverage
varies by council. This is a curated set, not the full council feed:
AreaSearch carries applications of material scale and does not track routine minor
works such as signage, fencing or small alterations, so the counts here are lower
than a council’s own total lodgement figure and should not be compared with it. Applications still shown as under assessment more than
18 months after lodgement are reported separately
and kept out of the live-queue figures: the age profile of open applications is
sharply split between a genuine queue under a year old and a long tail of records
councils never closed. Not every state publishes a cost of works — Queensland,
the Northern Territory and the ACT publish none at all — so on those pages
applications are counted rather than valued and no dollar figure is shown
rather than a partial one. Treated here as a snapshot of the current queue only —
AreaSearch does not chart application counts over time, because the history
reflects when each portal was collected rather than when development happened.
Approved — ABS building approvals
The official series, aggregated to SA3 from
ABS building approvals data, currently published to June 2026.
Counts dwelling units approved, not buildings and not completions. The most recent
financial year is annualised from nine months of data wherever it appears and is
labelled as such.
Building — major projects
Projects tracked individually by AreaSearch
from Infrastructure Australia, state infrastructure agencies, developer disclosures
and council records. Values are estimates and delivery dates are targets. Ranked on
this page by committed value and delivery stage rather than by distance.
Delivered — verified new addresses
New residential addresses verified in the national
address register since the 2021 Census. This is the closest available measure of what has
actually been built, though address creation can lead occupation and lags
construction. It is not a completions count.
Boundaries
Bourke - Cobar - Coonamble is Statistical Area Level 3 10501 in the ABS Australian Statistical Geography Standard (2021 edition), made up of 5 Statistical Areas Level 2.
It has an estimated 21,898 residents, +1.4% since the 2021 Census.
Currency
Measure
Source
To
Dwelling approvals, five-year average
ABS / AreaSearch
June 2026
House share of approvals
ABS / AreaSearch
June 2026
Residents per approval
ABS / AreaSearch
June 2026
Value per approved dwelling
ABS / AreaSearch
June 2026
Commercial work approved
ABS / AreaSearch
June 2026
Verified new addresses since the Census
Address register / AreaSearch
May 2026
Development applications
Council planning portals
July 2026
Major projects
Infrastructure Australia / state agencies / AreaSearch
Ongoing
Figures on this page are read live from the
AreaSearch database each time it loads, so they update as soon as a source does.
Development in Bourke - Cobar - Coonamble — common questions
How many new dwellings were approved in Bourke - Cobar - Coonamble?
The ABS recorded 37 dwelling approvals across Bourke - Cobar - Coonamble in the 2024-25 financial year, against a five-year average of 30 a year.
How many development applications are lodged in Bourke - Cobar - Coonamble?
AreaSearch tracks 441 development applications of material scale across Bourke - Cobar - Coonamble — routine minor works such as signage and fencing are not included, so this is not a count of every application lodged, of which 57 remain in assessment. Applications are assessed within the Walgett, Cobar and Coonamble local government areas. The most recent application in our data was lodged in July 2026.
What major projects are planned for Bourke - Cobar - Coonamble?
AreaSearch tracks 7 current major projects in Bourke - Cobar - Coonamble, 3 of them under construction. The largest include NSW Renewable Energy Zones (REZ) Program, Nyngan to Cobar Pump Stations and Pipeline and Cobar Wind Farm.
Which council covers Bourke - Cobar - Coonamble?
Bourke - Cobar - Coonamble is an ABS Statistical Area Level 3. It is covered by parts of 8 local government areas — Walgett, Cobar, Coonamble, Bogan, Warren, Bourke, Brewarrina and Lachlan. AreaSearch publishes development figures at ABS statistical boundaries rather than council boundaries, so they reconcile with the official ABS series.
Is Bourke - Cobar - Coonamble growing faster than the rest of New South Wales?
On development approvals, Bourke - Cobar - Coonamble is adding new dwellings more slowly than New South Wales as a whole — 0.17 approvals per 100 existing dwellings a year against the state figure of 0.59.
How current is this development data?
ABS building approvals are published with a lag of roughly four months; this page carries the series to June 2026. Development applications are collected from council planning portals and refresh continuously, with the most recent application here lodged in July 2026. Major project records are reviewed on an ongoing basis. Each section carries its own currency label so the four are never confused.
Development data is provided for general information.
Estimated values, dwelling counts and delivery dates come from the lodging or delivering party and
are not independently verified by AreaSearch. Confirm anything material with the relevant council
or agency before relying on it.